Loading...
HomeMy WebLinkAbout20121074 Ver 1_Observation Well Requirememnt_20130319Strickland, Bev From: Lucas, Annette Sent: Tuesday, March 19, 2013 10:09 AM To: Neal Tucker Cc: Randall, Mike Subject: RE: 12 -160 Observation Well Requirement - Ashley Furniture Neal, I agree with you that an observation well will not be helpful in this situation. Please feel free to omit that element. Thanks, Annette From: Neal Tucker [NTucker @stimmelpa.com] Sent: Tuesday, March 19, 2013 7:04 AM To: Lucas, Annette Subject: 12 -160 Observation Well Requirement - Ashley Furniture Annette, I need a little help with the observation well requirement in the Manual. The 4t" paragraph under 16.4, pg. 16 -11, says 'A minimum of one observation well shall be included in the design of an infiltration system to periodically verify that the drainage media is fully draining.' Does 'drainage media' mean the weathered rock in our case, or does this refer to the washed stone and sand that would be required for a system as depicted in Figure 16 -1b on pg. 16 -4? I'm not sure what practical purpose an observation well would serve in our case, since visual inspection will show whether the system is draining or not. I just want to be sure I'm thinking this through properly. Thanks Neal Tucker, PE Director of Civil Engineering ntucker a.stimmelpa. com Stimmel Associates, P.A. 601 N. Trade St. Suite 200 Winston - Salem, NC 27101 v: 336.723.1067 ext.104 f: 336.723.1069 c: 336.817.2524 www.stimmelpa.com Stimmel Associates, P.A. E -mail Disclaimer Strickland Bev From: Lucas, Annette Sent Mondoy, K4oroh 18, 2013 9:16 AM To: Neal Tucker Cc: RondoU, Mike; Oennison, Laurie; Higgins, Karen; Koro|y, Cyndi; K4otUlews, Matt; Bush, Ted; VVoW|d. Chuck; Homewood, Sue; Basinger, Corey Subject: RE: 12-160 PennitApp|iootion - Ash|eyFunnituna This is follow upto the conditional 4O1 Certification you already have, sono additional forms are needed with the stormvvaterp|an. Please send Mike Randall, Laurie Dennison and me an email on the day you submit so that we will know to look out for your stormwater plan. Annette M. Lucas, PE Environmental Engineer lVCI}IClVR I DW() I Wetlands and BtorcuwaterBranch I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail) 512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels) Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email: Webaite: A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Neal Tucker Sent: Monday, March 18,2013 5:26AM To: Lucas, Annette Subject: 12-160 Permit Application - Ashley Furniture |s there a permit application that must be submitted with the stornnvxater plan for Ashley Furniture? Neal Tucker, PE Director of Civil Engineering Sti0000el Associates, P.A. 601 N. Trade St. Suite 200 Winston - Salem, NC 27101 v: 336.723.1067 ext.104 f: 336.723.1069 c: 336.817.2524 www.stimmelpa.com Stimmel Associates, P.A. E -mail Disclaimer