Loading...
HomeMy WebLinkAboutNCC213083_ESC Approval Submitted_20210614ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Rutherford County ATTN: Mr. Danny Searcy 289 N. Main St. Rutherfordton, NC 28139 NORTH CAROLINA Environmental Quality May 6, 2021 LETTER OF APPROVAL RE: Project Name: Gateway West Commerce Park Acres Approved: 2.20 Project ID: RUTHE-2021-019 County: Rutherford City: Forest City Address: College Avenue River Basin: Broad Stream Classification: C Submitted By: Mr. David Odom, P.E. Date Originally Received by LQS: March 23, 2021 Date Revision Received by LQS: April 29, 2021 Plan Type: Commercial Dear Mr. Searcy, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eN01 form to Annette Lucas at Annette.lucas ncdenr. Ov or Paul Clark at Paul. clarkC)a ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 WORTH CMOUNA Department or Environmental Quality 828.296.45O0 Rutherford County ATTN: Mr. Danny Searcy May 6, 2021 Page 2 of 2 Title 1SA NCAC 4B .0118(a) and the NCG01 permit require that the following documentation he kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Since , �, Mi hael Smith Ass Cant Regional Engineer Division of Energy, Mineral, and Land Resources Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet ec: Mr. David Odom, P.E. davidodoni@odomengineering.coni cc: Regional Office file