Loading...
HomeMy WebLinkAboutNCC213460_NOI Signed Certification_20210614NCG01 Notice of Intent (NOI) Certification Form Directions: Print this form, complete, scan and upload to the electronic N01. Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6,1 Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.221 Per NC General Statute 143-215.69 (i), any person who knowingly makes any false statement representation, or certification in any application, record, report, plan, or other document fled or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that (check all boxes to indicate your agreement): 1 am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. ❑ X The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. ® I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. ® If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) of the NCGO10000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. I hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Name of Project {must match Ala): UPS Mebane - Bridges and Mass Grading Package Specific Lot Numbers (must match Alb): 160091; 160190; 160191; 160112; 172126 Legally Responsible Organizational Entity (must match B1): I United Parcel Service, inc. Legally Responsible Person (must match B2 & B3): Richard Bishop Title of Legally Responsible Person (must match B3b): I Assistant TreasUfE3r Name & Title of Signed if Authorized Individual Joseph Hunt Differs from Legally Responsible Person: UPS Past Region Project Manager Phone Number: (502) 735-2256 Signature Legally Responsible Person or Authorized Individual 6tmfeqA02. j Date * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president secretary, treasurer, or vice president, or a manager thatis authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 permit.