HomeMy WebLinkAboutNCC201583_Annual Fee Waived Email_20210611 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Friday,June 11, 2021 4:57 PM
To: Kenny@SunEnergy1.com
Cc: Morman, Alaina; Georgoulias, Bethany; Selkane, Aziza;
jeffrey.mcdermott@sunenergy1.com
Subject: Construction SW General Permit Annual Fee Resolved - NCC201583
Dear Construction General Permit Permittee:
This email is to notify you that the 2021 annual fee for Certificate of Coverage (COC) no. NCC201583 has
been resolved. If the permit remains active, it has been successfully renewed. If the permit is no longer active,
no future fees will be required.
This COC is for Albemarle Beach Solar Farm- Phase G in Washington County, issued to Albemarle Beach
Solar, LLC. This communication is in reference to Invoice no. NCC201583-2021.
If you have any questions,please contact the Stormwater Program at (919) 707-3640, or visit
https://deq.nc.gov/NCGO1.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh,NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.
i