Loading...
HomeMy WebLinkAboutNCC201583_NOT Closeout Documents_20210611North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Washington Project: Albemarle Beach Solar -Phase G Person financially responsible: Albemarle Beach Solar, LLC - Kenny Habul, Manager Address: 192 Raceway Drive, Mooresville, NC 28117 1. Project Location: Woodlawn Rd, Roper Pictures: No 2. Weather and soil conditions: sunny, warm, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: River basin: Pasquotank Project #: WASHI-2020-004 Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jason Philbrook Title: Environmental Inspector Inspection report: Sent Report Date given/sent: May 27, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No 10. Comments: additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Bradley West Others present: Date of inspection: May 25, 2021 Time arriving on site: 10:00 AM Time leaving site: 2:00 PM cc: