Loading...
HomeMy WebLinkAboutNCC200246_NOT Closeout Documents_20210611North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Person Project: Roxboro CAMA Landfill Expansion River basin: Roanoke Person financially responsible: DUKE ENERGY PROGRESS LLC - Issa Project N: PERSO-2020-004 ZarZar, GM-CCP Central Projects Address: 410 SOUTH WILMINGTON ST, Raleigh, NC 27602 1. Project Location: Dunnaway Road, Semora Pictures: No 2. Weather and soil conditions: sunny, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Brian Fowler Inspection report: Sent Report 9. Corrective action needed: Title: project manager Date given/sent: May 28, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Diane Adams Others present: Date of inspection: April 29, 2021 Time arriving on site: 3:15 PM Time leaving site: 3:21 PM cc: