Loading...
HomeMy WebLinkAboutNCC200246_Notice of Termination_20210611Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/11/2021 9:11:06 AM (NOT Submittal) Approve by Morman, Alaina 6/11/2021 4:41:23 PM (NOT Request Review- NCC200246) • The task was assigned to Morman, Alaina. The due date is: June 16, 2021 5:00 PM 6/11/2021 9:11 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200246 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nt3y be blank (if not yet billed). Information associated with this permit: Project Name Roxboro CAMA Landfill Expansion Site Hydrogeological Study Address 1700 Dunaway Rd, Semora, NC County Person Latitude 36.4730 Longitude -79.0630 Permittee Listed Duke Energy Legally Responsible Issa Zarzar Individual NC Reference No. NCG01-2020-0246 E&SC Plan ID PERSO-2020-004 Original NOI 20864 Tracking No. Date COC Issued 1/22/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 5/28/2021 Inspection Approval Project Close-out perso-2020-004_rox CAMA landfill Approval 51.82KB exp_20210429_INSP RPT.pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Issa Zarzar Title * General Manager CCP Project Management Organization* Duke Energy Progress LLC Date * 06/11 /2021 Email for issa.zarzar@duke-energy.com Confirmation * Contact Telephone* 9195467574 NOT Certification NOTs - Signed - Zarzar - Mayo Roxboro 2.pdf Form Mast be PDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) lori.tollie@duke-energy.com Original Permittee CCdonWificationErrails Email issa.zarzar@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email john.riina@duke-energy.com 895.39KB