HomeMy WebLinkAboutNCC190669_NOT Closeout Documents_20210610North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Brunswick Project: PNG Line 99 Retrofit
Person financially responsible: PIEDMONT NATURAL GAS COMPANY
INC - Aaron Weldon, Project Manager
Address: 4720 PIEDMONT ROW DR, Charlotte, NC 28210
1. Project Location: E Moore Street (SR 1528), Southport
Pictures: No
2. Weather and soil conditions: sunny & dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
River basin: Cape Fear
Project #: BRUNS-2019-075
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): none
Inspection report: Gave Report
9. Corrective action needed:
Title:
Date given/sent: October 26, 2020
10. Comments: Project appears complete and stabilized. File will be closed
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released and coverage under
NPDES General Stormwater Permit for Construction Activities is terminated.
Reported by: Trent James Others present:
Date of inspection: October 22, 2020 Time arriving on site: 1:45 PM Time leaving site: 2:00 PM
cc: