Loading...
HomeMy WebLinkAbout20190908 Ver 1_Compliance Evaluation Inspection_20210611Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190908 NCDOT - Replace Bridge 276 on SR 1104 Haywood NCDOT - Replace Bridge 276 on SR 1104 NC DOT Division 14 - Sylva 6/11/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 49' 54''+35° 26' 24'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site Inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 11, 2021. Jason Messer was present during the inspection. The following are items that need attention: -Remove plastic matting on stream bench underneath bridge. Can replace with coir fiber or leave open if bench is all rock. -Remove plastic matting on stream bank (Left Bank Descending) below new bridge. Replace with coir fiber matting. -Add groundcover per NPDES groundcover requirements in areas not actively being worked. NPDES records were up to date. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190908 6/11/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2