Loading...
HomeMy WebLinkAbout090067_Compliance Inspection_20210608(ii?(/;,) Facility Number 113 Division of Water Resourc 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: . Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ,erRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Arrival Time: Departure Time: VO,',61197/11 Owner Email: Phone: County: ENTERED TO LASERFIGHE Region: FRS JUN 1 1 2021 DEG/DWR WORDS Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: 65r1241 )r 1! Latitude: Integrator: Certification Number: / 7 9S -6 Certification Number: Longitude: EVILLE NEC ZONAL OFFICE Phone: Swine Wean to Finish Wean to Feeder Design Current Capacity Pop. b 11°61 Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Layer Non -Layer Design Current Caeaci Po Layers Non -Layers Pullets Turkeys Turkey Poults Other Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes iAllo ❑ NA ❑ NE El Yes ❑No El NA ❑NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No El NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes 4EI'No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes -EiNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued F,ncility Number: - L91 Date of Inspection: I`b1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 0 Yes 3No ❑ NA ❑ NE ❑ Yes ❑ No 0 NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 is 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Jf No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 1, 2'Yes �i_; o ❑ NA ❑ NE ❑ Yes J:21No ❑ NA ❑ NE ❑ Yes ErNo ❑ NA ❑ NE 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes .®'No El NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 1:1)No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area ❑ Yes -No ❑ NA ❑ NE 12. Crop Type(s): 13. Soil Type(s): C2t/ u4A W l eye ov�VJ-eej+ 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes J 'No 0 NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes , >No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes _®'No ❑ NA 0 NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes "No ❑ NA 0 NE the appropriate box. ❑ WUP 0 Checklists 0 Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes JJ.No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections 0 Monthly and 1" Rainfall Inspections 0 Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 12. No 0 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 0 Yes -No 0 NA 0 NE Page 2 of 3 2/4/2015 Continued O Yes ..e' No ❑ NA ❑ NE O Yes „El -No ❑ NA 0 NE ❑ Yes , ❑'No El NA 0 NE Facility Number: - 111 Date of Inspection: 67 k 1 -2iI 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes „allo and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ,12-1(10 If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes .171''No permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 2'No ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Yes ,No ❑NA ❑NE ❑ Yes ,121-1\lo ❑ NA ❑ NE Yes allo Yes ,12`No Yes a`No Yes „ErNo Yes jallo ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations Use drawings of facility to better explain situations (use additional pages as necessary). or any other comments. ,/ .zzi/a_ h).-(vAlted /0)-6 /7 'L0144 14-) Limiter -4e71-eok, ibsto /-0 c6c7 c,e1 /frZ4 ci/--„,(Z4 Reviewer/Inspector Name: 1212/66,4) % / ✓ Phone: Reviewer/Inspector Signature: C Date: Page 3 of 3 ( 2/4/2015 FACILITY #: 6C7 "V1 FARM NAME: � f0,14407 FREEBOARD irg ACTUAL LAGOON LEVEL PERMIT (#19) - DUE EVERY 5 YEARS / - EXPERIATION DATE 773 /2V NUMBER OF ANIMALS R= - ACTUAL NUMBER OF ANIMAL ? 9oe - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES ? € c c / e , THE UTLIZATION PLAN SHOULD HAVE A (-) NEGATIVE NUMBER ODOR CONTROL CHECK IST ES R NO on Plan Maps s p WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER DATE 57 NITROGEN LEVEL SOIL REPORT (#21) EVERY 3 YEARS: DATE id/3/a"> P-I (NO MORE THEN 400) :f-' - PH (Note if 4 or Tess) - Lf Cu/ZN (NO MORE THEN 3000) CU Cis 3 ZN (IF PEANUTS NO MORE THEN 300) MENTAL CHECK OF CROP AND FIELD NUMBERS RR2(#21) ZONE ACRES 3c- PAN `? X CROP TYPE FLOW RATES /(, NITROGEN (N) .5 120 Min inspection initialed Weather Codes '! Commercial Fertilizer Chicken Litter CALBRIATION (#24) - EACH REEL SHOULD BE CALIBRATED - DATE DUE EVERY TWO YEARS ii ' '' ///d(6, - FLOW RATES /4,5' RAIN FALL (#21) -INITIAL AFTER 1" RAIN EVENT V -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED -LOOK FOR BIG NUMBER DIFFERENCES SEE THAT THEY MATCH THE IRR2 FORM /. SLUDGE (#21 & 25) -DUE EVERY YEAR: DATE O: ) ,/ () P: J-_ % RATIO OF SLUDGE RAIN BREAKER FORM OTHER FORMS (#22 AND #21) CROP YEILDS / MORTALITY VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) ALIVE CROP HARVESTED FIELDS GOOD HEALTHY CORPS CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE