Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-00501_Well Construction - GW1_20210210
WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Joseph Bailey 14::WATEIt'Lt3N FROM TO DEscRrPTIO Well Contractor Name ft 157 fl- G1,G• �p 3271-A tit ft- NC Well ContractorCertification Number IS-.U[7I>iR:CA$1NG(#or t5raiiaased wells ORI IiRR B & K Well Drilling Inc FROM TO DIAMETER+ THICKNESS MATERIAL 0 ft. Company Name ft 61/4 SDR-21 PVC � 011/ j r i4.T:NNER C l IA0 OTf:T13$fi Yl eiymsl dasrtldoo ' 2.Well Construction Permit#• FROM To DIAMETER THICKNESS I MATERIAL List all applicable well construction permits f.e.UIC,Country,State.Variance,etc.) It. ft .in 3.Well Use(check well use): #0 ft ft in. Water Supply Well: 17'St itEEN PFY FROM TO DIAMETER SLOT SIZE I THICKNESS I MATERIAL OAgricultural OMunicipal/Public fL ft. in. DGeothermal(Heating/Cooling Supply) enttal Water Supply(single) Aft ft. in. ❑lndustrial/Commercial ❑Residential Water Supply(Shared) 18iGRt3UT ❑Irri ation ❑Wells>100,000GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 fl• 20 fL Bentonite Pour OMonitoring ❑Recovery ft fL Injection Well: fL fL ❑Aquifer Recharge OGroundwater Remediation 19:5AN1)/GItAyEG'PACK,ffa c6lfle ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL I EMPLACEMENT METHOD ❑Aquifer Test DStormwater Drainage ft fL OExperimental Technology ❑Subsidence Control ft fL OGeothermal(Closed Loop) ❑TracerO DRI1 t1PIGtii sum =addST `'3iiect+ff:u'` ❑Gcathcnnal(HcatinglCaolingReturn) D Other(explain under �#2 FROM TO DESCRIPONcolor,hardness,soiltnmk in eft.) Remarks) ft 4.Date Well(s)Completed: Well ID# l __ ft. IL Sa.Well Location: fL �" ft ti•f dr✓ Facility/Ow4rNamc � Facility ID##(if -p�pi_icaj lc)) A01 ft ft /W.ei © ft ft f Physical Address,City,and Zip ft ft ounty Pascal Identification No.(PTN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one W/long is sufficient) 22.Certific 'on: N wr 6.is(are)the weil(s): rmanent or ❑Temporary St ure ofC ified en Cunt/ Date signing this.form.I herebv certify that the well(s)xms(were)constructed in accord6nre with 7.Is this a repair to an existing well: Oyes or 15 4 NCAC 02C.0100 or 15A NCAC 02C.0200 Well Cmistruction Standards and that a copy if this is a repair.fill out known well construction information and evploin the nature of the of this record has been provided to the melt owner. repair under-2/remarks secrion or on the back of this form, 23-Site diagram or additional well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page'to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See-Over'in Remarks Box).You may also attach additional pages if necessary. a drilled: 14.'SU$11'iiTTAL INSTRUCTIONS 9.Total well depth below land surface: �,, 'e• (ft-) For multiple wells list all depths ifdif)erent(example-3(a3200`and 2 0100') (�S�this GW-1 within 30 days of well completion per the following: 41) `24a. For All•.Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft.) infomration irocessing Unit,1617 MSC,Raleigh,NC 27699-1 6 1 7 If rcater level is above casing.use 6 1/1$ r `' ' "24btF)3r injection Wells:Copy to DWR,Underground injection Control(RUC) 11.Borehole diameter: (in.) ''" Program,1636 MSC,Raleigh.NC 27699-1636 12.Well construction method:Air Rotary 24c For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e,auger•rotary,cable,direct push,etc.) county environmenta,health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d For Water Wells producing'over 100,000 GPD:Copy to DWR,CCPCUA I3a.Yield(-.pm) Method of test: Air Lift Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: r' TabS Amount: 1 112 LbS Rcv sc i 6 fi-241 R Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources