Loading...
HomeMy WebLinkAbout20171559 Ver 3_PreFiling 30-Day Clock Reached Email_20210610Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, June 10, 2021 12:01 AM To: vickie.miller@hdrinc.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for GRMS - 20171559 Ver 3 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for GRMS that you submitted on 5/10/2021. The ID number for that project is 20171559, Version 3. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20171559 Version * 3 Winston-Salem Regional Office - (336) 776-9800 Sue Homewood Pre -Filing Meeting Request submitted 5/10/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Vickie Miller vickie.miller@hdrinc.com GRMS Greensboro Randolph Megasite Foundation Randolph Street Address 324 W Wendover Ave Address Line 2 Suite 207 City State / Rovince / Region Greensboro NC Fbstal/Zip Code Country 27408 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit I— Modification ✓ Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20171559 Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information. * The GRMF was established to attract the development of a transformational manufacturing, facility (such as a transformational automotive manufacturing, production, and assembly facility) by assembling and promoting a tract of land at a location that will generate employment and economic benefits for the Randolph County -City of Greensboro area (Project Region). A transformational manufacturing facility for the Project Region is one that is expected to: provide roughly 2,000-4,000 mostly skilled and semi -skilled manufacturing jobs; increase the local tax base; and provide new payroll to circulate within Randolph County and the City of Greensboro. GRMF, NCRR, and Randolph County own and control the 1,825-acre property that constitutes the Greensboro Randolph Megasite (GRMS). The GRMS is located in northern Randolph County approximately two miles southeast of the Town of Liberty and west of the Town of Julian. The nearest named waterway is Sandy Creek, to which the unnamed tributaries on the site drain. The GRMS is generally bounded by Old US 421 (SR 1006) to the north, Julian Airport Road to the west, Troy Smith Road to the east, and US 421 to the south. The proposed project would establish a 1,000 acre construction pad at the GRMS and make associated utility (electricity, water, sewer, roads, and rail) improvements ("Proposed Project"). This request is to resubmit the application that was previously submitted on December 4, 2017 and again on June 26, 2018. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 5/10/2021