HomeMy WebLinkAboutWQ0042600_Application (FTSE)_20210604KCI
SSOCIATES OF NC
ENGINEERS I PLANNERS
June 3, 2021
NCDEQ
Water Quality Section
450 West Hanes Mill Road — Suite 300
Winston-Salem, NC 27105
SCIENTISTS I CONSTRUCTION MANAGERS
RE: Fast Track Sewer System Extension Application
Town of Wilkesboro
Cub Creek Area Sewer Replacement
Wilkesboro, North Carolina
Dear Water Quality Section,
NC Department of
Environmental Quality
Received
JUN 0 4 2021
Winston-Salem
Regional Office
KCI is pleased to submit the enclosed Fast -Track Application for Gravity Sewer on behalf of the
Town of Wilkesboro for the construction of the Cub Creek Area Sewer Replacement.
The Town of Wilkesboro proposes to construct, own and maintain the following gravity sewer
in the vicinity of Cub Creek Park: 367 linear feet (LF) of 8" PVC, 10-LF of 10" PVC, 2,689 LF of 15"
PVC, 366 LF of 16" DIP, 1,135 LF of 30" PVC and 508 LF of 30" DIP.
The following documents are enclosed in this submittal per the permit application checklist:
• One (1) original and one (1) copy of the Fast Track Application Form (FTA 04-16)
• One (1) original and one (1) copy of the Flow Tracking for Sewer Extension Application
(FTSE 10-18)
• One (1) original and one (1) copy of a USGS Topographic Map
• One (1) original and one (1) copy of a project street level map
• Application fee of $480
If you have any questions or require additional information regarding this project, please contact
me at (336) 402-6708 or at casey.davi @kci.com.
Sincerely,
KCI
Casey Davis
Project Manager Enclosures as noted
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: (to be completed by DwR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Wilkesboro (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Ken Noland per 15A NCAC 02T .0106(b)
Title: Town Manager
4. Applicant's mailing address: PO Box 1056 NC Department of
City: Wilkesboro State: NC Zip: 28697- Environmental Quality
Received
5. Applicant's contact information:
Phone number: 3(_36) 838-3951 Email Address: townnranai=.er(awilkesboronc.org �UN 4 2®21
H. PROJECT INFORMATION: Winston-Salem
lOffiCe
1. Project name: Cub Creek Area Sewer Replacement Project
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00_ and issued date: _
If new construction but part of a master plan, provide the existing permit number: W000_
3. County where project is located: Wilkes
4. Approximate Coordinates (Decimal Degrees): Latitude: 36.1464° Longitude:-81.1512'
5. Parcel ID (if applicable): 2203625
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Marco Menendez License Number: 032322
Firm: KCI Associates of North Carolina, P.A.
Mailing address: 4505 Falls of Neuse Road, Suite 400
City: Raleigh State: NC Zip: 27609-_
Phone number: (219) 215-2786 Email Address: marco.menendez(a kci.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Town of Wilkesboro WWTP Permit Number: NCO021717
Owner Name: Town of Wilkesboro
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: _ inch
N/A System Wide Collection System Permit Number(s) (if applicable): WQCS_
Owner Name(s):
FORM: FTA 04-16 Pagel of 5
VI. GENERAL REQUIREMENTS
If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Aereement (FORM: DEV) been attached?
❑ Yes [-]No ®N/A
3. If the Applicant is a Home/Property Owners' Association. has an Operational Aereement (FORM HOA) been attached?
❑ Yes ❑No ZN/A
4. Origin of wastewater: (check all that apply):
Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash
Residential Leased El Retail with food preparation/service ❑ Hotel and/or Motels
® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
Food and drink facilities ® Church ❑ Swimming Pool/Filter Backwash
Businesses / offices / factories ® Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20D
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f) [--]Yes Z No
➢ If yes, provide a copy of flow reduction approval letter
Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f)
Daily Design Flow e.b
No. of Units
Flow
gal/
GPD
gal/
GPD
gal
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
0 GPD
a See 15A NCAC 02T.0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4L
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero; indicate why:
® Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
367
PVC
10
10
PVC
15
2,689
PVC
16
366
DIP
30
1,135
PVC
30
508
DIP
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing tines to meet minimum slope requirement is not allowed and a violation of the MDC
VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
N/A 1. Pump station number or name: —
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -
3. Design flow of the pump station: — millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): _ gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g)
15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systeme
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains(horizontal)
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
*Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches-
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee
➢ If noncompliance with 02T.0305(f) or (e), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) E Yes ❑ No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? 0 Yes ❑ No ❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 &Buffer Permittine Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? Z Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
El Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or thepermitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
0 Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the reauestis required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
attest that, this application for
(Professional Engineer's name from Application Item
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation,
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
olanI , 1dW)J filan
(Signature Authority's name & title from Appliddtion Item I.3.)
that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:LZ A ZZ
/ Date: 6% L1", 4
FORM: ETA 04-16 Page 5 of 5
State of North Carolina
6tilPOCm of kAme
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Wilkesboro
Project Name for which flow is being requested: Cub Creek Area Sewer Replacement
More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Cub Creek WWTP
b. WWTP Facility Permit #: NC0021717
All flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
4.99
0
4.672
0
4.672
94
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / pf),
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity***
Cub
1%
8.64
3.45
1.15
0
1.15
2.3
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cub Creek WWTP
Downstream Permit Number: NC0021717
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
b -Z4 -2l
Signind Official �ffliature Date
f6wrl N-Ar
Title of Signing ffzcial
Page 2 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is <
0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
: and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
5- 2-4 - El
Signing Officicp Signature Date
Page 3 of 6
FTSE 10-18
MUSGSY.S. CEYSTfiUWWTHEUV FUOR
n�..yNry .i OS— po
MN rwW YeM SINE I'ULW
wx w ne i �
m
nwe w ♦r .0 v ® w ua e.Y.e. ��
- rmu Rw��.weae ins �r ��uuiuw.r.nnnweemmnu� �i e
W0.XESBORO W.NR414LE
,.R,RR ' gNaERYRn