Loading...
HomeMy WebLinkAboutWQ0042572_Application (FTSE)_20210525Monday, May 24, 2021 Baldwin Ridge Apartment Complex Burlington, NC Cover Letter for Fast Track Sewer System Extension Application The project is located on a 10.62 Acre tract of land located in the Northwest quadrant of the intersection of Baldwin Ridge Road and Morningside Drive in Burlington, NC. The Project will include: • Six (6) Apartment Buildings, each housing 30 apartment units (180 Total units) 0 36 One Bedroom Units 0 126 Two Bedroom Units 0 18 Three Bedroom Units • One (1) Office / Amenity Area NC Department of The Application Package includes: Environmental Quality • Application Fee ($480.00) Received • Form FTA 04-16 MAY 2 5 2021 • Form FTSE 04-16 8.5 x 11 Color USGS Map Street Level Map (Vicinity Map) 1001 Chestnut Drive Phone (336) 736-9267 Winston-Salem Regional Office State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Baldwin Ridge Apartments, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Jason DeBoer per 15A NCAC 02T .0106(b) Title: Member / Manager NC Department of Environmental 4. Applicant's mailing address: PO Box 767 Quality Y City: Burlington State: NC Zip: 27216- 5. Applicant's contact information: 'I MAY Z 5 2021 Phone number: Q 6) 516-5048 Email Address: ildeboer@vahoo.com Winston-$alem Regional Office II. PROJECT INFORMATION: 1. Project name: Baldwin Ridge Apartments 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Alamance 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.113056' Longitude:-79.4211 V 5. Parcel ID (if applicable): 138781 (or Parcel ID to closest downstream sewer) I1I. CONSULTANT INFORMATION: 1. Professional Engineer: Jesse Wilson License Number: NCO18197 Firm: Wilson Engineering Group Mailing address: 1001 Chestnut Drive City: Smithfield State: NC Zip: 27577- Phone number: 336 736-9267 Email Address: suds a a amail.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: East Burlington Wastewater Treatment Plant Permit Number: NCO023868 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No HN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No HN/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No HN/A 4. Origin of wastewater: (check all that apply): H Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(1)? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.01140 Daily Design Flow "b No. of Units Flow Residentia - 1 BRl 240 gal/day 36 8,640 GPD Residential - 2 BR 240 gal/day 126 30,240 GPD Residential - 3BR 360 gal/day 18 6,480 GPD Office 25 gal/day 1 25 GPD 640 SF Gym in Office Amenity Area 50 gal/day/100 SF 1 325 GPD gal/ GPD Total 45,685 GPD a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 45685 GPD (per 15A NCAC 02T .Ol 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: ETA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewersl: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 507 PVC (SDR21) 8 20 DIP (401 PROTECTO COATED) ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) —02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(E): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeftames, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS— (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, take, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [:]No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [—]No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and mspec tons ocumen a per a or tHe perms ee s m tvt ua ys em- t e rollection perms . FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: that this application for (Professional Engineer's name from Application Item 11I.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per I SA NCAC 02T .0106(b): 511 tom. fb7eW(w Kt Fattest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environment and Natural Resources Division of Water Resources -- - Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Entity Requesting Allocation City of Burlington Project Name for which flow is being MILIcsted: Baldwin Ridge Apartments �Ww e rhan one FTSE innp he required. fin- a single proicer i/'the owner of the IV117P is nol responsible for rdlptimp stalions along the route q/ 1he proposed ivasteivaierJlmr_ I. Complete this section only if you are the owner Of die wastewater trealmeol plant. a. WWTP Facility Name: East Burlington WWTP b. WWTP Facility Permit 4: NC 0023868 c. WWTP facility`s permitted flow d. Estimated obligated flow not yet tributary to the W W'FP c. WWTP facility's actual avg, flow f Total flow for this specific request g. Total actual and obligated flows to the facility It. Percent of permitted flow used All flows tyre in .49GD 12.00 1.910073 5.0740 0.045685 7.029759 58.6% 1I. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W WT.P : None (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Total Design Approx, Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Available Name GPD (Firm/pf), GPD GPD GPD Flow Capacity — NONE * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity < 0. Downstream Facility Name (Sewer) Downstream Permit Number: Tarpley Street Outfall Not Known Pa e 1 of 2 FTSE 10-18 Certification Statement: L W. "Todd Lambert, P.E. certifv to the best of my knowledge that the addition of the volume of wastewater to be pennitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow f3om this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been perfrnned in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and it plus all attached planning assessment addendums for which I am the responsible party. Signature of this firm certifies that Tile receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater, Signing Qljicial Signature City Engineer Title of Signing Official Dale Pa e 2 of 2 FfSE 10-1 US, DEMFT-ENT OF �E ATEMOR OION QOAO...I� MUSGS u s M '—M—L—CE CO Q0 �R� CA u I I SITE Y 1 ow CL— .... ....... U) a) E -r_ cu cu CL co < 0 61 0 State of North Carolina Department of Environment and Natural Resources Division of Water Resources ssys�t<ronaevedrres *:say¢,, Flow Tracking/Acceptance for SewerFxtension Permit Applications (FTSE 10-18) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Baldwin Ridge Apartments More than one FTSE nsay be required for a single project if the owner of the WWTP is not responsible for all pianp stations along the route ofthe proposed wasteirater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: East Burlington WWTP b. W W"IT Facility Permit M NC 0023868 A11 flows are in MGD c. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 1.910073 c. WWTP facility's actual avg. flow 5.0740 f Total flow for this specific request 0.045685 g. Total actual and obligated flows to the facility 7.029758 h. Percent of permitted flow used 58.6% If. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: None (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Available Name GPD (Firm/pf), GPD GPD GPD Flow Capacity*** NONE * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity s 0. Downstream Facility Name (Sewer) TarpleyStreet Outtall Downstream Permit Number: Not Known Page 1 of 2 FTSE 10-18 Certification Statement: 1, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream primp station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed hi accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. -- AZ--.__ 5-ZI-21 Signing Official Signature City Engineer Title of Signing Offlcial Date Page 2 of 2 FTSE 10-18