HomeMy WebLinkAboutNCC200455_NOT Closeout Documents_20210609North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Forsyth Project: Line 328 DOT Relocation A
Person financially responsible: PIEDMONT NATURAL GAS COMPANY
INC - SANU ODUGBESAN
Address: 4720 PIEDMONT ROW DR, CHARLOTTE, NC
1. Project Location: White Rock Rd, Winston-Salem
Pictures: Yes - Digital
River basin: Yadkin-PeeDee
Project #: FORSY-2020-013
2. Weather and soil conditions: Cloudy, Workable Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Noel Hall
Inspection report: Sent Report
9. Corrective action needed:
Title: Chief Inspector
Date given/sent: June 09, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Tyler Pearson Others present:
Date of inspection: June 09, 2021 Time arriving on site: 8:45 AM Time leaving site: 9:15 AM
cc: