Loading...
HomeMy WebLinkAboutNCC202514_NOT Closeout Documents_20210609North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Revision of Harris PI, Sec 4-Lots County: Cumberland Project: 8-11,177,178,186,208&220 River basin: Cape Fear Person financially responsible: H&H Constructors, Inc. -Brian Walker, Division project #: CUNME-2020-185 Manager & Agent NCC202514 Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 1. Project Location: Demila Dr/Bath Ln/Woodmark Dr, Seventy Pictures: No First 2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 07, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: June 04, 2021 Time arriving on site: 4:45 PM Time leaving site: 5:01 PM cc: