Loading...
HomeMy WebLinkAboutNCC202430_NOT Closeout Documents_20210609North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Hoke Project: The Eastlands at Bedford - Lot 308 River basin: Cape Fear Person financially responsible: H&H Constructors, Inc. - Brian Walker, Division Project #: HOKE-2020-042 Manager & Agent NCC202430 Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 1. Project Location: Cornwell Court, McLauchlan Pictures: No 2. Weather and soil conditions: Cloudy/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: December 31, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: December 30, 2020 Time arriving on site: 3:40 PM Time leaving site: 4:00 PM cc: