HomeMy WebLinkAboutNCC201390_NOT Closeout Documents_20210609North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Lee Project: Woodbridge Meadows Phase V-lots River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. - Brian Walker, Division Project N: lee-2020-032
Manager & Agent
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC
1. Project Location: Lenity Lane & Lenity Circle, Jonesboro
Pictures: No Township
2. Weather and soil conditions: sunny, workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one
Inspection report: Sent Report
9. Corrective action needed:
Title: n/a
Date given/sent: December 31, 2020
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -inspection or monitoring is required. Project is released and coverage under the
10. Comments: NPDES General Storm water Permit for Construction Activities is terminated. If this project
has a Certificate of Coverage (COC) under the NCG01 permit, then
complete the electronic Notice of Intent (eNOT) form at deq.nc.gov/NCG01.
Reported by: Diane Adams Others present:
Date of inspection: December 23, 2020 Time arriving on site: 3:15 PM Time leaving site: 3:30 PM
cc: