Loading...
HomeMy WebLinkAboutNCC202323_NOT Closeout Documents_202106081887 Town of �e 04 outhern Ines . fa '„- North Carolina The Mid South Resort Internationally Recognized for Program Excellence Dabbs Brothers, LLC PO Box 2032 Wilmington, NC 28402 Public Works Department 140 Memorial Park Court • Southern Pines, NC 28387 March 23, 2021 RE: Soil Erosion and Sediment Control Plan Certificate of Compliance TSPE# 21-1102 — 130 Chanticleer Dr. To whom it may concern: A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project has been conducted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. All requirements of the plan have been met and properly completed. You are reminded of the requirement to maintain any permanent structures of this plan. Receipt of this letter is notification that the erosion control project plan is completed and is being removed from our active file. Any further development will require the submittal of a new plan for review and approval. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. If I can be of further assistance, please contact me at 910-692-1983. Sincerely, James Michel, PE Town Engineer Phone:910-692-1983 Fax:910-692-1085