Loading...
HomeMy WebLinkAboutNCC202717_NOT Signed Certification_20210609N�G01 Notice of Termination (NOT) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOT (Rescission) form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DON T MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM Y U MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.221 General Permit Certificate of Coverage (COC) No.: NCC202717 Name of Project: 975 Sandavis Rd. Southern Pines, NC 28387 Per NC General tatute 143-215.6E (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty Of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true, complete, and accurate. Legally Responsible Organizational Entity: The Ascot Corporation, LLC *Legally Responsible Person: Colin Webster Title of Legally &espQnsible Person *Signature: Manager Date: 6/1 /21 Print Name andlTitle of Signed (only if authorized individual signing differs from Legally Responsible Person): * IMPORTANT NQTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance wito Part iv-, Section S, item (a) of the NCG010000 permit. For more infornation on signatory requirements, see Part IV, Section B, Item (6) of the NCGO10000 permit.