Attached is a copy of the inspection report which was prepared following an on -site inspection of the
subject site. This report is intended to provide you with information concerning the status of the site
as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973.
Please review this report carefully as it may contain corrective actions needed or comments which
will assist you in meeting the required performance standards of the Act.
It is our desire that any and all possible problems be discussed and resolved at the earliest possible
time. To facilitate this effort, please contact the named inspector at the address shown on the
inspection report if you have any questions.
Sincerely,
Land Quality Section
Mooresville Regional Office
�— North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 ( Mooresville, North Carolina 28115
ou NOMHcnnu ^"
E.moren w Q firy 704,663,1699
'® o • ® ® ® • ®- • ®®®
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Mecklenburg Project: CDIA Central Receiving & Distribution Center River basin: Catawba
Person financially responsible: City of Charlotte - Jeff McSwain, Director of Project #: MECKL-2020-035
Development
Address: 5601 Wilkinson Blvd, Charlotte, NC 28202
1. Project Location: Hangar Road, Charlotte
Pictures: No
2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Ryan Fairchild Title: Chief Airport Construction
Inspection report: Sent Report Date given/sent: March 12, 2021
9. Corrective action needed:
10. Comments: This project has been terminated along with Meckl-2018-051 that exists within the same
disturbed limits. Site never achieved permanent stabilization but was within the boundaries of
new airport project Ivleckl-2021-028. Please reference letter within the file. This project will
now be closed and permit released under the guarantee that the new permit holder and
financial responsible party for Meckl-2021-028 install all required erosion control devices as
shown in the newly approved plans and permanently stabilize the site upon completion of
construction activities. No additional self -monitoring or self -inspections are required.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities should be requested by the permittee via Notice of Termination unless permit
approval date was prior to April 2019. Contact our office with any questions.
Reported by: Jeffrey Chandler Others present:
Date of inspection: March 04, 2021 Time arriving on site: 3:30 PM Time leaving site: 4:00 PM