Loading...
HomeMy WebLinkAboutNCC200078_NOT Closeout Documents_20210607(Lug CHARLOTTE DOUGLAS"A INTERNATIONAL AIRPORT NC DEQ Mooresville, Regional Office 610 East Center Ave, Ste 301 Mooresville, NC 28115 Attention: Jeffrey Chandler RE: CDIA - Piney Top Drive and CRDC Permits Project ID MECKL-2018-051 & MECKL-2020-035 Dear Mr. Chandler: On May 29, 2019, DEQ issued a LOA for the Piney Top Drive project (MECKL-2018-051). This pro- ject consisted of import of offsite materials to stockpile on Airport property for future use. Upon com- pletion of stockpiling operations all disturbed areas were seeded for stabilization per the approved ero- sion control plans. The permit for this project has not been closed at this time. On November 18, 2019, DEQ issued another LOA for the Central Receiving and Distribution Center (MECKL-2020-035) project located at the same property. The erosion control plans for the CRDC project incorporated the erosion control measures previously approved and installed with the Piney Top Drive'project. The CRDC pro- ject was under way and clearing/grubbing had been completed when the Airport terminated the project due to economic developments related to the COVID-19 pandemic. Again, all disturbed areas were tem- porarily stabilized by seeding and mulching. Since both permits are for the same property and cover the erosion control measures of both projects, Charlotte -Douglas International Airport requests that upon permanent establishment of vegetation and an approved final inspection by DEQ both permits be closed together. Please feel free to contact me if you have any question. Tott ards, Houser, C.M., ACE Engineering Project Manager Charlotte Douglas International Airport