HomeMy WebLinkAboutNCC201555_NOT Supporting Documents_20210606North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Holiday Inn Express & Suites and
County: Cumberland Project: Future Hotel -off Legend Ave River basin: Cape Fear
Person financially responsible: True North Hospitality, LLC - Akash D. Patel, Project #: CUNME-2020-088
Member NCC201555
Address: 11 Iron Hollow Road, Sharon, MA 02067
1. Project Location: Legend Avenue, Fayetteville
Pictures: No
2. Weather and soil conditions: wet, non -workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: June 02, 2021
9. Corrective action needed:
10. Comments: The project was never initiated and is being closed out at the request of the Developer. A
Notice of Termination (NOT) will need to be completed requesting rescission of coverage
under the NPDES Stormwater Permit issued for subject site. Please upload this inspection
report as documentation for the Notice of Termination by going to the following link:
http s://deq.nc.gov/abouVdivisions/energy-mineral-land-re sources/energy-mineral-land-permits
/stormwater-permits/construction-sw
Reported by: Melissa Joyner Others present:
Date of inspection: June 02, 2021 Time arriving on site: 11:20 AM Time leaving site: 11:35 AM
cc: