Loading...
HomeMy WebLinkAboutGW1-2021-00441_Well Construction - GW1_20210201 WELL CONSTRUCTION REC `D(GW"1) For Internal Use On' 1.W Contractor Info r ation: 14.WATER ZONES rFRO,-ITO DESCRIPTIONWeIlCont orN tnee ft.NC W tractor Ce r on umber CASING Cor multi casedwells OR LINER ifa IlcabteTO DL1\I Er ER Ta""t ESS _ MAT RIAL Q R. "L in. v Company Name t6.INNER CAS[NGORTUBING thermal closed-too 2.Well Construction Permit k: �,V�/ b�O../t a 5'9� F ROM To DtXN1VTER THICKNESS MATERIAL List all applicable ssrll construction permits fix.UiC.Courry.Stare.Variance.etc.) R• R' io 3.Well Use(check well use): ;a Water Supply Well: I TO DIA519FER I SLOTSIZE I THICKNESS MATERIAL Agricultural MunicipaVPublic t. �t: to. a v Geothermal(Heating/Cooling Supply) esidential Water Supply(single) Industrial/Commercial OResidential Water Supply(shared) .18.GROUT irrinti0n - FROM TO MATERIAL -E\ CEME\TMETHOD&AMOUNT Non-Water Supply Well: ft- t 0 R' Monitoring Recovery ft. tt. 47 Injection Well: ft. tt. Aquifer Recharge 0 Groundwater Remediation 19.SAND/GRAVEL PACK f applicable) -:C Aquifer Storage and Recovery O Salinity Barrier FROM TO I MATERIAL EMPLA04iNIENTMETHOD Aquifer Test DStonmvater Drairaee D R. ft. Experimental Technology [DSubsidenceControl Geothermal(Closed Loop) Q Tracer 20.DRILLING LOG(attach additional sheets if necessary FROM I TO DESCRIPTION(cotor.bardne s.soltfrocktype.grainsive.etc. Geothermal(Heating/Cooling Return) Other(explain tmder=21 Rem!2 i ft. ft. 4.Date Well(s)Completed: t IDt€ f m tt. N..J ft. a.Weil Location: S'. Ct. Facility/Owner Name Facility) (ifopplicable) R' ft' ft. ft. Physical Ad City,and ip wl 2L7tEMARK5 County Parcel identification No..(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (irwell field,one latflong is sufficient) 22.CqAification: C "VAL 6.Is(are)the wetl(s)v Permanent or Temporary Signature erti@ed well Contractor Date kv signing this form,i hereby certh that the ssell(s)uars(were)constructed in accordance 7.Is this a repair to an existing well: QYes or" to %dih 15A NC.A.0 01C..0100 a)-15A NCAC 02C.0100 Well Construction Standards and(hata Ijthis is a repair,fill our k'noon%veld construction information and explain the nature of the cop}o(dris record has been provided to the uefl'gnner. repair under#21 remarks section or on due back of this form. 23.Site diagram or additional well details: 8..For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may,use the back of this page to provide additional well site details or well I onstruction,only 1 GW-1 is needed. indicate TOTAL NUMBER ofwells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft•) 24a.for All Wells: Submit this form within 30 days of completion of well For mukiple mells list all depths if d(Qerenr(example-3 _00'writ @100') construction to the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, !fitter letvl Is above casing,Erse '- 1617 Mail Service,Center,Raleigh,NC 27699-1617 Ll It.Borehole diameter: (in.) 24b.For Iniection Wells: In4addition to sending the form to die address in 24a above,also submit one copy of this font within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: r 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 11 Method of test: 124�? 24c.For Water SuPPIV&In'iection Wells: in addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: CTTl7 Amount: completion of well construction to the county health department of the county where constructed. Font G W-i North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016