HomeMy WebLinkAbout20210098 Ver 1_More Info Received_20210608Umstead Grove‐DWR #20210098    June 8, 2021      S&EC # 14336.W10  Any active running water as it exists today is following the arrows shown in red below.  This is coming from the  existing pond and ditch along Umstead Road.  While we are filling in the wetland and adding a crossing pipe, we  are not anticipating having to divert water from this wetland to construct this driveway pipe.  The existing  condition as shown below in red already has water diverted away from where this pipe will need to be installed.      Once the fill for the road is added, the water will divert to this location, but fill for the road will not be placed until  after this pipe is installed (see 2nd snippet below).  It is also worth pointing out that this is not designed as a major  culvert with custom headwalls/wingwalls and multiple box segments.  Rather, it will be a simple pre‐cast drop inlet  (or pre‐cast flared end‐section) to be placed with precast RCP segments.  So construction of this pipe and  structures should be done within one day.    Before grading activity, first install driveway pipe:        After fill has been added for finished road grade and pipe has been installed:      Nick Williamson, PE ‐ Project Manager, Residential, McAdams