Loading...
HomeMy WebLinkAbout20210996 Ver 1_SF-610190_Permit Package_20210407_20210609 1 ligIlwav North Carolina Department of Transportation Sto 11l\Vater „, Highway Stormwater Program STORM WATER MANAGEMENT PLAN \'- / (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 17BP.8.R.135 TIP No.: SF-610190 County(ies): Montgomery Page 1 of 1 General Project Information WBS Element: TIP Number: SF-610190 Project Type: Bridge Replacement Date: 12/4/2019 NCDOT Contact: Erik Seiler Contractor/Designer: Erik Seiler Address: NCDOT Address: NCDOT 1590 Mail Service Center 1590 Mail Service Center Raleigh,NC 27699-1590 Raleigh,NC 27699-1590 Phone: (919)707-6757 Phone: (919)707-6757 Email: epseiler@ncdot.gov Email: epseilerRncdot.gov City/Town: Mt Gilead County(ies): Montgomery River Basin(s): Yadkin-Pee Dee CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 0.196 miles Surrounding Land Use: Proposed Project Existing Site Project Built-Upon Area(ac.) ac. ac. Typical Cross Section Description: ROADWAY HAVING TWO 11'TRAVEL LANES IN EACH DIRECTION WITH A 6' ROADWAY HAVING TWO 11'TRAVEL LANES IN EACH DIRECTION WITH A OUTSIDE GRASS SHOULDER.TOTAL PAVEMENT WIDTH IS 22'. VARIABLE(2'-6')OUTSIDE GRASS SHOULDER.TOTAL PAVEMENT WIDTH IS 22'. Annual Avg Daily Traffic(veh/hrlday): Design/Future: 960 Year: 2025 Existing: 480 Year: 2015 General Project Narrative: REPLACEMENT OF BRIDGE 190 OVER CLARKS CREEK.THE RECOMMENDED STRUCTURE IS 1@35',1@50',1@35'24"CS,WITH 4'DEEP CAP.THIS PROJECT HAS (Description of Minimization of Water A STORM DRAINAGE SYSTEM COLLECTING BRIDGE DISCHARGE WHICH WILL BE DISSIPATED BY A RIP RAP PAD AT THE PIPE OUTLET LOCATED AT TOE OF Quality Impacts) FILL.ROADWAY DRAINAGE SHEET FLOWS OVER GRASSED SLOPES BEFORE ENTERING WETLANDS.THERE ARE NO DECK DRAINS ON THIS BRIDGE. NUMBER OF INTERIOR BENTS REDUCED FROM 5 TO 2,REDUCING DEBRIS BUILDUP AND SCOUR POTENTIAL. Waterbody Information Surface Water Body(1): Clarks Creek NCDWR Stream Index No.: 13-16 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) co n See Sheet tA For Index of Sheets STATE OF ®I' CAa� ®L 1r SHEETS IS d�1 1 e �L STATE STATE PROJECT T REFERENCE NO. SHEET T II >n DIVISION �� \)� �( N.C. 17BP.8.R.135 i NI) \ / 1L//I V I S I O N OF HIGHWAYS STATE PROl.N0. P.A.PROI.NO. D68CR�'1'ION 1 1114 a �, "� 176P.8.R.135 P.E. �° • 1 • 5 Fld - -0IL' 18 Bethel Baptist , , - — 00 �rv�5grr°9 Hydro R.. - \ -� MONTGOMERY COUNTY lilo v 1188 / ,I 1188 1188 '/ a \ / P1 �,a�� N llto LOCATION: BRIDGE 610190 OVER CLARKS CREEK ROJECT SITE/ ' I PERMIT DRAWING p • LOCATT;ON 4 ON SR 1110 (LILLYS BRIDGE ROAD) SHEET 2 OF 11 6 1 Allenton ,-7 - ° . / 11103 .; ON TYPE OF WORK: GRADING,DRAINAGE,PAVING & STRUCTURE � �T" Bricky•d R 3 N� \ WETLAND AND SURFACE WATER IMPACTS PERMIT ` V Tr pLti \ �G.f y Q� LIITII4 PZ2�� a 0 al d \ 1 C1 VICINITY MAP t O ♦ OFF-SITE DETOUR ROUTENTS. Hq\Nq0 4 piiiiii BEGIN PROJECT 17BP.8.R.135 -L- Sta. 11+25.00 SITE 1 / I END PROJECT 17BP.8.R.135 -L- Sta. 21+60.00 (\ CLARKS CREEK SITE 2 II 4.- TO �\ -L- l � ql .1.C, \ SR 1110 LILLYS BRIDGE ROAD �r1°7d1 :��I������I - NS1 «\ \ _ li R. SPEED STUDY COMPLETED TO DETERMINE yl/� . 11ydR r188 DESIGN SPEED FOR PROJECT AND $ END BRIDGE ° /s I q -L-POT Sta.17+16.30 \d NEED FOR HORIZONTAL AND VERTICAL 1 I Q END CONSTRUCTION p DESIGN EXCEPTIONS. -Y-Sta. 11+90.00 1 1 ro BEGIN BRIDGE 1 ` -L-POT Sta. 15+93.71 �� I�Q CLEARING ON THIS PROJECT SHALL BE PERFORMED TO I crl 493 LIMITS ESTABLISHED BY METHOD III. 4 493 PLANS PREPARED BY: PLANS PREPARED FOR: HYDRAULICS ENGINEER V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH rl IENGI�RIN i DIVISION OF HIGHWAYS ADT 2015 = 480 lJ DIVISIONODr 8 322i TEE\ItOYALBD.AXL19.7I,NC 27617 121 DOT Drive *tr 50 0 50 100 _ "rF[.k:9I9.7RR.0224 FAX 919.788.0232 Carthage,NC 28327 cr----- � 7/7 ,413 L■ ■J ADT 2025 = 960 LENGTH ROADWAY PROJECT 17BP.8.R.135 = 0.173 mi NCLICENSE#P-mR9 0� z ■1■" K = % 20/8 STANDARD SPECIFICATIONS .® 0 PLANS �� -en D = % LENGTH STRUCTURE PROJECT 17BP.8.R.135 = 0.023 mi SIGNATURE: P.E. • �� 50 0 50 100 T = 6 % * RIGHT OF WAY DATE: BRIAN A.WILES,PE a w `l li l l V = 40 MPH FEBRUARY xx,2019 PROJECT ENGINEER ROADWAY R DESIGN �� N�z PROFILE (HORIZONTAL) * TTST = DUAL TOTAL LENGTH OF PROJECT 17BP.8.R.135 = 0.196 mi ��9� ®v�� � w O 5 0 5 10 FUNC CLASS = LETTING DATE: ®� v��e�� +fl:� `'I.. J LOCAL JULY xx,2019 TIM WELCH, PE ��IN NC DOT DIV 8 BRIDGE�J PROFILE (VERTICAL) A SUBREGIONAL TIER ACONTACT PROGRAM MANAGER A.E. � � A SIGNATURE: co I !ENGINEERING, PROJECT REFERENCE NO. SHEET NO. - 100' 0' 100' l7BP.8.RJ35 4 co ■ ■ ■ ■ — MONTGOMERY COUNTY BRIDGE#190 • WETLAND AND SURFACE WATER IMPACTS PERMIT ROADWAY DESIGN HYDRAULICS 3220 GLEN ROYAL RD.RALEIGH,NC 27617 ENGINEER ENGINEER ,pi IL 7,01 GRAPHIC SCALE TELE919.788.0224 FAX 919.788.0232 NC LICENSE#P-0189 INCOMPLETEPLANS/ DO NOT USE FOR S/W ACQUISITION 40-ill RV NOW OR FORMERLY �j111/ DOCUMENT NOT CONSIDERED FINAL Ul p DUKE ENERGY PROGRESS INC UNLESS ALL SIGNATURES COMPLETED xco I \ PERMIT DRAWING vSJ SITE l 8 NOW OR FORMERLY P. N ��ry� XENRY DULP III Xl O 0 O I E (V ago 4 N SHEET 3 OF 11 Q. SITE 2 14 � e x I FILL LE— W/CLASSLIII Rip R ORAP J I X fV r v I TO ELEV.225.0' / 1 \ I X CL Q \ Ah ek h 3j o4,,,...., SrN°R CLASS B RIP RAP �, NI WOODS :� + v N TOE PROTECTION a sp .. 111 EIP GATE CLASS B RIP RAP BANK ABILI7IIALIOlN \ ti o J� SEE DETAIL C SEE D� IL B k se.;\ E WOODS 771 WOOD. 1 Sc� ,O d Rim Fxs,Nc \�ke G/o\ ......... E y ®� \x�k Tow OF NOW ua TN FORMER' (LEAD Q. q qo tl. o�,� E 1 ,w-_ j -rE F CJ NOW OR FOR4ERLY \ \\Rr /` :��.� L -:� %Y i7m .... rss— __ - —I k�k %I HENRY COLP In •2 JC � 6,C $ P T1 �r�—— s_ _————— • .0.. ,FAW ..:... _ ; • 1 o♦ {� r. '_F _ _ \ ue\ \y`w\ O Q C g\Y Go_ �������WMI, i��M�©`� iii r,�!!i■\ `�� `QrVty' F \ • � - -- _ .'t 1.-.4.y _—\,21=1, IIMEr` remRs�ie PST \\� G/�eapP\ �F A I e( HYo " k \i._�u„�71 I/ =J r C x\ I •E L • WOODS 18",�• M // ,, PUFF _ PI ,,.a PUFFMY _=�� P E :.�•.._ \ .r jilt �\ \ I� IR' ry► CLASS B RIP RAP 4, E v lW'm -�\ F k r R. _ ► ZsBs II RIP RAP to `P CLAS B RIP RA' ✓ �k N 72 09 58r E Illflli: m—,:—mom / \ �Sus�RI P �v�.�:l� � `_\ 0 0 +'`// WOODS �/ �\ `\ ill� �. \ INV=232.99 PoSk GR I ._1 CLASS a RIP RAP e/ / . ` ,� / f1 fl/ '� �I IS RCP G!' _Y_ `' v�� \\ WOODS W�R iii / NOW OR PORYERLY I•, `�[. " JS /�n ' \ ��U/lY,s \ 4 G DUKE ENERGY PROGRESS INC \III �., \ 4._ o/ s AlN 2 •q a / S .is scgF \ \� CEO \s \/tltltl(/k e _ '1�1 j5�!a x l \� � SSP,btl /'Illiri :: �� —JS_ y /- °� NOW OR FORMERLY . \w \\ \ PCRiPaP / �i • To.o 1 DUKE ENERGY PROGRESSINC �� \ o Mont90 ,/ --"A„, 50. \\ mory�e\ /o SS /.. � , WOODS s TOP:243.39' \ A C \ SIZE UNKNOWN ill ►, RIP AP il , I . iSEE ENLARGMENT woe,. riI SEE ENLARGMENT l / /I / I I I/ .. ¢ I m DETAIL B I Io RIP RAP AT EMBANKMENT DETAIL C I Not to Scale) TOErPot PROto TECTION ES I I . I Fore' M ES M NATURAL 2' Natural \of S\oQe GROUND Groend b E w I GEOTEXTRE d= 2R. d I �w m m Type o Type of Liner= B Rip-Rap Geotexlile EA f Liner= SEE BELOW M FROM (LWTEILE FROM STA.14+50 TO 15+79(LT) iP 60 TONS CLASS II RR /80SY GEO FROM STA.16+70(LT)TO 16+91(RT) Mo 1 6i —r_ P' S>O./4f�28 55 TONS CLASS II RR W/70SY GEOTEXTILE MMK 2 01.4 1—Ma le,-0,-Z FOR PROFILE, SEE SHEET 5 >MI= NMLL4,2 MMU V MM- _ MMK P. MIRK MMK MM6. G- //41 —� �' k�,�S (J f // ) .7 # v �� J " PROJECT REFERENCE NO. SHEET NO. 7 vv �7.Iffi -) 1 ) . )1< \nf\i'l lv ci IENGRIN1 l7BP.8RJ35 4 m ,: / ` �� m- . • ��\---( ,� MONTGOMERY COUNTY BRIDGE#190 J / •• 1✓ ROADWAY DESIGN HYDRAULICS r� INCOMPLETE PLANS ���'• _ '� ,, ���wri��� � WETLAND AND SURFACE WATER IMPACTS PERMIT 3220GLEN ROYALRD.I�LEIGII,NC 27617 ENGINEER ENGINEER \ � &� �` c7 TELE 919.788.0224 FAX 919.788.0232 2 et ,•_--.: 6 ��1� �• �r NC LICENSE#P 0189 _ __z /6 ' 7 I .< ..,,\ DO NOT USE FOR LiW ACQUISITION ._ ., ...., �� )() l H i��e Li ) �, ��_—_Bv.,x°� �� f11&„� /''uI/iif v e — \ v� Q \, �J v ' / �� •''� °`*A� L /J /`/I, y{/ ��••/J jW l� av 1 L\\_\`` ��-' , I/i 'i r,,, v �v, _• RL m\ f/11 � ,y// v /m/,-/ ~/ _OJ DOCUMENT NOT CONSIDERED FINAL N S �� ...� ?) ,� — ,° �\ )11 /J/ / 1^�\ \ UNLESS ALL SIGNATURES COMPLETED , • 1 GNAT y -4 "� — ° l cV PERMIT DRAWING l��" eiltr l( � °" /— , � / � ��•. ';ice'\v` / J i\���.:1/v� 1 \\ \ 4 F 1 2 � ) L1- .� v,., �ft.�� ;� SHEET O 1 /� ; � �,v A , •., ( , / Iy-, yP `n , ��� 3{ r am J f/�, --, 5 / \ SITE 2 .tea v 4i v .�� I �� La. V,- 4 ,1 m FIL\ R?i0. v / /,= X it Cb C� _� aaa �, ?4� ��� ,._`'�� �� W/CRI&I`RAP p vv .Yv� �l 7 �� cv � ro C \\\ / IxI � �v\ ,,,. a �� \I v v \ ...,v * \/r1s 7 ! ��� li �.I < v k \ A iiiis /J L}� R1(1 E. ; U N x �� �P//y/ yJlv �5 •E OT I V I BJJ A�� �.. �/ �� --------,Ni,,o r;, �.��^a I GATE D ,r%SELZ. 1 JJJ SEE r 1 y �\k ` //k,_,/c,/, ' ' - o .�;, !-/" '' /,% ",.9 MP / ' ^fir k eV 1� � •--_, ==�k �\�_ NOW OR Fa+uERI Y QV / Pr \ .. , • \Y �\�,^o.�� ` �,�T � �•- A� TOWN OF MOUNT GI EAD 41I' -',-,-,,---- c.--.--- ---, ,,: -.4.ve4,Allisi &1114.-- p---;.2, i 144.,WI - FM -1---- i I I __ _ • ett ,/1 w �� �� _ ��>q�,� �_.� S P _s� � ---._ r 4W A \ K ��.� � � , �.4 � � � .� .. „,E � � r_____ _„ � ,- �.R� �� � _ .a . _ s____,---- , /4„ ,,,,, , it :� ' i �� � 4 IR C� P �` M,If� "Nit � � ll:ria OP � r„ �� \ \`� �v \\ `� a �z , ,,,_7/ —��` _ �1� ' T I. 1 v i ,link, .1.1 cCL B RIPIP RA; `� �� �� � � s. \�' r 7/ s• i� _J a •--- —1rs'� / • ! 10111#-t, rr 'Jlxs. / i' ..� �V 8�� d ..n '��_= u � \ =w \ m =v/ L` / vy �-�C• `�I m r— oo ,R ,_„� '•e4. 47- _°� . i \.1.` '.` wv-* ..\ et.J � s/ �-- � /� v °� C P RA `� �j �_ �� °� � "\\g �� � R v /v-r�.°_/� � °&"�- � � d � �5 1, Ck V v � t' v � � � � W R � ��\ � :74- " �' R i�' �e ~�a�g _Y ) 1 � � v \ oD _ v "-: )-- �: -- ion �/�C\ s� 1 v' ^NOYRLr sIl� �L -'�.f e' ` \ r, •� V\ '� •f �� „`° U4trs• _ �, ;' �J ,� r J �C ' eNE°ROr��ecAE" �` r -`1% l \ , �" ,z,. a-''' \ ve � �F ��` e /� = .r^a"`3�S ,�: '---__A 1 1 � " � I ,.. � I �J � s '/ �, ! , .�, -_ p M � y.� I l c5 c c J � 9 l ^ �� � t v _�� v--- 1 r° r \e==1 m �°� Pili =��V .y '� .. ��� v °ssP \y`hs l •'4 �/2- "`" Sy \,.,� / I�' -r.0-j i7� �= A_,_,'''' \ � FORWERLr �� 3 ,2�� A,\v �`) Z Idw �. PIPHAPI�C� 'I.. `r ,r• °<��//�"� �• v`u, �rl��l4l , �,'" <u \� \ ��EIIJ✓��17M�S v J�o \� `O \ O \n M ��aN. ,/ 17 , J!r'f l/�� I��\ ` I \,., 'yI v. v� .i I\ �� "Jr-= , � .o_ ,,x,__i�`e ,`,. t.Fv �;1 yvS ��� v -\�V� �'I, r� /WOIDO S �� _`' / >� \ . e q \ �° iu ' 1 er --_, -....r. v 'i . '`s� \`�IZ N \%. •, I\ �l _y'��4 J \ v L �/� -o{ i 1�1AP ( \ v '/ v/ / v b P i _ ` / e �� -�`�` /� 1 STo 2 �a�\N; ( ��\ �\ \\ \' I -Lg"\ \\. c''')1' 'II kN\ \''---'''/ ,k.\--TO S----- ,) N------'e'::1 N.•"\ -_ ".----- A-______-__ <___zi."--,-- ---"---77-- ----.4--,--/\ , / il \ ---""'\ /1 \ WOOL: 1 I �I� w�/ 'y -:,� ✓—J�v b•�j- f ,°`u ` I I I' v�v" ' / \� 4 e grl v �L \� \ , \ �� � v v \i ~ �, T a /^ v \ L� \g � 1 I '� # K m ~; 4 ,_., ( —� Wn �= \- > % �\% i °<� \ ��Pr„ k I �� l v v \ v' .�a y �/ r Z,4 �v �;_2 V 1— --�v /` \�"'\�f�' \��_ ���- �� t �� J,� 1 If v� v V �. /v\�CZ\—��� ` � � ye--\/ ,,, \m f e�� l v� \ � fi \� ^ : Z \^ I i ' / e, a ��vv= pr ice/ j�///, /j� , D 1 \f 1 T✓ C ° ��._ v IL_T 4 /I V • x'� Leggy `\ �� ��aa�/nmv� a�sa �V "I ` RIP RqP A / T. E v� ) TsL,:- .„ � r\ > �\ v S%� •4 � Th I i ^ &� °.l y� �-- `�- �,�� 3 RAND k 2� ` nd b 1 ;L,E;S,n` l / t, -\ z� �L� � �� I J -. , �I 1 \ S III II_�\I • m� b r ` 7::: v ° _/4' I = \ " v e� ��° m v �? s� � �� GEOTEXTI� _ #11 ! ( Sv _�`�k L r e 3 6= pZ� Gdolenl ib3 0 \` ^\ v v Its 1 `� //� _/ ) \ g > Type�'n< 'SEE BELO y `t. \ �'2111) ' V'''4 : i r` \ dam-- r" •� i (/ > �_/� p •M.,.`16+20 T)�•O 16�sTd,J '�.n� ~\ 2 a''�� ��r �. ' 6=_ �ill / �. �\ 1� >� Jv�v \,OLJ� 60 NS ClAIY R c Y �4..,�; 'O=�STA„)4 58 TO 1• 7 LTI I r»pL�� f r !•, L G7 "I ;� STA16+781L' . 1 11R� ` I�7/ «� \ ^ 7 � � •Tile ..- •- • �'���� 1 a cJ \ �e,== �� � 55 cos,@LAss ii 3s,1no¢Y GE l � Z1 f� u v ��v�� \ jJ �" n ( r�-- �!/ �� q,\ r J \ � �� P os lLE;y SEE SH E 5` ��rc= (Al /— �% —� 11 v ���� � °�_ � 1 awvvv�>1�����,� �r _ ' / nv ����� v �� \� a vim —� v ��� v �� /"w / ��r :\'' j.:16-71:11- � �� ,, ENLARGEMENT SITE 1 PERMIT DRAWING SHEET 5 OF 11 m WOOS \� co .4 GAT- �'�O \ .a�� WOODS q I \ i( BANK 8 �mv. STABILIZATION) i ! 30� 0' 30' 1 _ TOE PROTECTION FILL SCOUR HOLE i W/CLASS II RIP RAP E \ 0 , Wr _ _ ' GRAPHIC SCALE ��� 0 E _ FSS I _ - -4 • ,40": 1i - i � 11 �����I�•1/'�'1111•��� MOI� de..„.„, l'��._O l ._'a_� t t���. \ \ 74, isp, • "ererr,141-f IN_ ith-,.vd, - -ifI-: `..wmat Wil lrildWb-AmmlM►il,\1\E-vYd_ — \\\ F N O • N r1 /~► I �� �� lily , Ii►t� N OME Q � �C\I � TB � � lillIPIE _ 04 C 04 5 �1'+ ��� rII'g�1ARA TB 2G1 ir-te#, _ Aplinptatea"7# 1 ifsk( ,,NVaittEue_ _iliffii-iiiiMINEm--------------- 01-414: ilir --ivr ma kr,--Ttittumwmvergiv/Weallillik .' - -..•, , -__ Ammummmw_____ ....„, :,,,,,, Ar, „1., i , .1 /— 15" '1?-4-',ti: - irk ro � PU CLASS B RIP RAP W4, � 15" ` ' ' WI _1 1., „, _,, 7,:-----------1-,1,-*- -----nrThfir ----- --------...---.--- - - J1:" RC -Iv ,q PU , �Q' P -ain. C-Cji! 1A CLASS II RIP RAP C V\ SSBRIPRAPC SURFACE WATER �Lj �� �. C II R P RAP MECHANIZED �� IMPACTS �� tS` `��UPRAF � WATER �( CLEARING ° s`" TB________ B- TB TB �� T� vv T" TB TB Tg T: TEMPORARY IMP CTS I�l S B RIP RAP B� '< 03 SURFACE WATER /F F DENOTES FILL IN O � � W O O�S � � SEEUDETAIL � � � � WETLAND O� TEMPORARY IMPACTS IN SURFACE WATER i�� j y � Te �I�' DENOTES MECHANIZED j * * * * CLEARING I �� vAtI �Q, lB DENOTES IMPACTS IN i / it , '0 \?? � � SURFACE WATER I �� 1S '/�� 0 \ W IMPACTS INE SURFACE WATER ENLARG EM ENT SITE 1 PERMIT DRAWING SHEET 6 OF 11 lli \ \--,, ' \\ 1, ___ m , .4 ,, 0,, _, ,,, ,a_\c,,,,,i,\ -,-„, \,,,--__ _,,,,\ o/0) , . \,,,,\\ \,\\ \ \ \ 1\,,,,\N- _+_ -N \ \\,...„ Ne. -„. ,,_ ,,-\ , ,,,,N, L� 2 I \ \ \ A \ N \\ / CV \ \\\ .0.9 NJ� N'e \\ &\�\ goy GAT_ , qO .� / I \\ @l \\ \/ ,\ \ -1 \\1\\\ \ , -- \ '� i J L .� G \ ' )1 \ l \ 1 I BANK--m•L \ ',?,,\\�\e \ \ \ 1 � //) � \ \ \/� � � � � �� �, i ry TABILIZATIO� \ �\\ \\ � _ �6£,. i L i /� ( •�ZZ� I �22 I " I \33e\\\ \�3 U' 30 / i E PROTECTI N �FILC�SCOUR 1110Lz� / _ ` m ��_ \ \ _\\_� ` r C • -` \ 23 � �1 \ r .�,11 /E I 23 0 CLA \w _ /2��� Z��� \ ti�� IV \ \ I I \ \\ \ \22 4••R�RI-1C- et''' \ / 'W ( --- 6i4/1(1 \ Z kills \ • \ — �_ �\ - \ ` �23@ �O / 1 �/ /, .•N�— L-2 ���@ A 28FBL� �\ \ \\23 2 1\\ �\ 22 a ` �\ \_ 2\� \ . a CLAS�B- RIP \ F \ — �- — \ \ \ \ 33° ,..,..,„ ..,.____ ��� _ sue�R-, I .. N I ?\ ,# — ;& ► __ — - _ `f�-+[m/I;; /�e\��+ i�l�� � �� v�V ��� 0 fib C ' ' 6\1 Liralligriariellialt"61k Mein CsC\I ME ' i- --------------- ohilnit` ,' \ N TB N _ 11t �el 11,A1111M/ AW6�=fg NM _MN ----Ti33\291 — --------, ______•-2_3 .0-`•-__ / /�^ ■ -a„ X 4pl, . Is.;sz- �� i i\tag' i ig of r_ . W.:‘,14 It.tttaX_I &_.*740. AL.?",_ ,..Aill,). ' 6.4"111"rig., irde.„: _ ' / qii / 7- - — -- -- — -- ---7- 3 z2�.m 15 's. • �. vi _i _71. 1.. p.)1110,--. 1o/�° CLASS B RIP .�e Pw A �!��. ., 7_ � ` g� , �� a = �..i �' 1. RC IV // "wmrdzi.:A. _ . '' ''P' r► `r- --‘ 4' E � tr•��_ �� 02 � � / ti r p6 m°azz \ 6t1,�' \ \ 1 ,� SS B, RIP�2A' \ \ tii - N �+ ti ti / \ at ��II R „..._ . _ - N / �� \ SURFACE WATE�� \ / �22 \ \ ;- \--/ MECHANIZ��er �\ \ \ \ IMfjACT\ /\ //P7\ A (,?, I U�FA�E�� •\� 23e 1 CLEARING 0,-: ' fr• _.‘ zz\ -N \ \ TB �•LZZ \� ' \\ 4)/ ` \ e 2[EI®1PORARY IMPACTS IN \_ I / S B #P RAP \ m°Lzz `,.•� \ \ / Pi;\\ \ c".tk\ \ SURFAC WATER ) \ / F DENOTES FILL IN �/ �W\O\S�/ \\ \ \\\ z- — t\ CAUSEWAY ` �� -` L � � / WETLAND 00 0� / ' \ TEMP RY IMPACT I�I SEE DETAIL \\@ �, \ z/ \�% SURF TER I ijc// \ \ \ \\ \ —S/\I1 C3 � ti � 1 \� �� ;,,, � � � DENOTES MECHANIZED ',, '0 � ,\ \ '� ,p) IN \1\ N ��, TBN �\ � . CLEARINGo/ (-) I 1 1 d '<< Li \,,; j I I/ N � ,� ,-�0•17zz / \\� 1yi:Sj1)\ �� ` \ \ c� \\ DENOTES IMPACTS IN m ���� _ I \ ) \\ c ti,c.,:` / SURFACE WATER i / I I 226 c� \mj \ I \ �� ) \ DENOTES TEMPORARY .�/ 22 --\\ e. / \ ( S\ IMPACTS IN SURFACE WATER WO II'� KP D DETAIL (NOT TO SCALE) EXISTING BRIDGE DECK INTERIOR BENTS WORKPAD (TYPICALLY I'-CLASS B RIP RAP) (25 tons) 2' N,WoS. ELEV=219.4' \o T 0 0 0001 h00000 0 0, FLOW 00 aOo Doc 00 • ROCK CAUSEWAY (CLASS II RIP RAP) STREAM BED NCDOT QUANTITIES OF ESTIMATES DIVISION OF HIGHWAYS VOLUME OF CLASS II RIP RAP- 1875 cy ®NTG® E'Y ®UNTY AREA OF CLASS II RIP RAP- 595 SF (0.0I cc) P]'OJECT: .135 (SF-61®190) ESTIMATE 2915 TONS CLASS II RIP RAP h I'G. 190 ON SR1110 OVEI' CLAI',KS C['E]EK 7//11 ENLARGEMENT SITE 2 PERMIT DRAWING SHEET 8 OF 11 SURFACE WATER \� IMPACTS 41 FILL IN WETLANDS \ F 8,4,,-4120 is -r-- 1 _± v WI IMil.Mitipl 1 N f\ -_ F-- r--) .1710711111111111111111M111111111/ ' ' - -- ' . yL 1�1 1INPrreINEW--L--—WIrTAB-2I-GM1- \ /i \30'eleee60' 30' 3i111 t -- ®dd GRAP CALE 0 -.1111111111 re F 15" jc F = o ,� T 044 ` r TEMPO RY IMPACTS IN S MECHANIZED ���� •�� SURFA ER CLEARING (\/ 0\iikii ''`) N..„..s... �e� \\\ 12e? / il - � N ( WOODS STY \ \�� \33\ r B J\ 6 \�\ JS ���TB X ra C rB )is---------..„,*_Ay----( __ co\ i TB m \Te JS— z m m NOW OR FORMERLY En DUKE ENERGY PROGRESS INC 0 7000 ' o 126, / F DENOTES FILL IN DENOTES IMPACTS IN / WETLAND SURFACE WATER : * * DENOTES MECHANIZED 741 DENOTES TEMPORARY m * * CLEARING IMPACTS IN SURFACE WATER (---,-- , D ENLARGEMENT SITE 2 PERMIT DRAWING SHEET 9 OF 11 SU FRFR A 4 .A\�; ° ate\ \� \ ,„....„,_ „,„......,......,_,.. ________ \� \\ \ \\\„_=.. ...„,_______,„ \\ I �\\\,\�. PAC ty \ \ \ �FNTD \\ \\\ \� \6 czz\ �m I . t Ile' �z- - - ------4-iez- — ---- 2,35- 36 ----- A,, '---,,, „_22-----__ \ \ 3 \ 3 1 d'?� ` tzz — ,�z _ _� 23�\ \ ° \ 8�_\�\ m1�z . � \ 4� f E. lrGi� e6z v v V AA \\ Sag 4VAii,: vv IR ✓``ems■:■-.�i mffrAriEl �� \ �Z9 \ 231 \ ��� \ Aar mumminnienr liOlingala C\I N--) N.- -14 �L �MI - � ���1WIIWilr- . 3 m �231°�\ \ �IBZ���� \ \ \\\\ \3 B \ \\ s �_ '\ V.. .A°). \ Ilakrx,451607,41,-: arst'''''Ilivki!vir•Lah71-4.T4P.I_v_rtrAwaltar=,,,rft---.'- 111-, ,-----ang iggincian, ii------ _,. ._____: - litill" It _ perms ��1.9 �� O `! • W),‘ �L.', AD C e. 9_ ! •: ram - F4 \ \" \ n _ �ti ` \ \�� �2 g mon m TEMPO RknAkRRAC --.II CA% TD�4 \ 22--1° \ \ \ \\ \ MECHANI -- /4 C\ \� _ O N SURFACE ER \ \ ��e �9 J CLEARING :+� r 11 i O �` � \ \ - - ---- ...,.._ .6) 84104-- \ /\ �� \ f�\ \� zzz 22�•;: -C 2, .e°e,?0 `1 O`Vkt„lb \�� , 219.0 - IA* < \ c' -j: ------- -----, ,--, ----' ' ti V le!\.e ------- * * \i" \1 •bzz c 4 i (74 sik -''' ' / V\i\ A ,-))\ „....._,N. ...., ‘-'\, ,/i ,,,, r53 t .:', ..7, '' '------ \'- i --_'----\, - - / 1/ N \ \* __.----"N, ',9 \ \ /-----\ \''4, \ D\ \ \, (\- 1\) 0 j : ti \ \ ` \\\m \� 22 I 1� e \ J \� ) \ / .--- / ) \ \ / N ' (\ \\ ?\ ( S------C , .-;-e;zi.. 4,.`\;\ \ z--- -- ,_._. c\* 8 zp , ., ,ti \ \ �� \ ZZ / ( ) \ S6 \\ /Y \')') . --, -,-,------ .4.5-__ N e. ° .rii rn V.,',,, l ( , /\ i\ '- \V ��y\ \ NOW- OR FOROERLY \2z9° \ I `�\ l �\ < N---_, \ DUKE ENERGY PROGRESS IN�� /\ \ \ff \ Y� N F F DENOTES FILL IN DENOTES IMPACTS IN \ _� e� o \� \ / WETLAND SURFACE WATER 7 N\ m �\ NI I / \ N °', �J / N\CNN �J I\ \e°` N N� * * * * DENOTES MECHANIZED DENOTES TEMPORARY \ 29 \ \ 7 m �c\\ titi� \�°ems CLEARING7/// IMPACTS IN SURFACE WATER —��� m��/m N m �� \\ goy\\ \ \� m P m _ I I I I I I1 I I I I I I I I PROJECT REFERENCE NO. SHEET NO. ENGINEERING /7BP.8.R.135 5 ,.... CIWETLAND AND SURFACE WATER IMPACTS PERMIT ROAENGINEERDWAY DESIGN HYDRAULICS 3220 GLEN ROYAL RD.RALEIGH,NC 27617 TELE 919.788.0224 FAX 919.788.0232 I INCOMPLE E PLA\NS NC LICENSE#P-0189 ISO NOT USE FOR /W ACQUISITION _y_ ,... ..i. ,,vd, Nrs DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED u P1= 101-35.00 PERMIT DRAWING $ C = 30' K = /3 SHEET 10 OF 11 VQ(NJ QN I I I 1 II II END GR • ' ' W -Y- ST +OOAD EL = 23/ PI= 11+30.00 N EL = 231J2' VC = 120' 240 _ K = 21 - -- � � _ 2�0 � (+109714C - Li 220 _ 210 _ 10 11 12 13 14 BEG/N , I1 , i 1 I 1 BRIDGE HYDRAULIC DATA -L' ST ll*1 .00 —DESIGN DISCHARGE = 4300 CFS EL = 2 .90 DESIGN FREQUENCY = 25 YRS ' L. FT DESIGN HW ELEVATION = 231.7 BASE E —BASE FREQUENCY = 6000 = 00 CFS YRS PI= 11+75.00 BASE I-1W ELEVATION = 233.3 FT EL = 257.70' OVERTOPPING DISCHARGE= 4600(+/-1 CFS VC = 100' OVERTOPPING FREQUENCY= 25+ YRS 270 K 125 mph —OVERTOPPING ELEVATION = 231.5 FT 270 DS 11 ` 1 $„'�! END G"ADE DATE OF SURVEY = 7/24/18 260 (-•.4ocb4' P1= 14+0500 ;fig to EL = 23455' -L- STA 2/�6OD0 E[ - 23420' WS.ELEVAT ION 260 /. VC = 360' .-I.-o N"� M AT DATE OF SURVEY = 2/9.4 FT /ice"CIS K OS-330 mpn 8 W W ch 5_ PI= 20+30.00 •250 did inW% EL = 230.40 2SO co a 8 VC = 230' 1... ct K = 64 �. x OS = 40 mph 240 B m W ,\ 240 �� EL=221.4 /' (MIN.) 230 I I r T�r ' (-/phi (4 29231x 230 Iiiiiiii 220 „li �,:a i. 1 220 FILL SC OUR HOLE I W/CLA IS II RR I I 1 BANK STABILIZATI JN . f II RIP RAP �CD 3ANK 1..:1 SLOPE y,�4 LIZATION 210 — BM I ELEV = 236J2' STAB I I I P NWS =219.4 210 U+,� N 532.581 E I.689104 ti —L— STA 13+38 30'RIGHT TEMP.CAU:EWAY FOR PLAN, SEE SHEET 4 ,n3Aa BM TIE NAIL IN 8"OAK IN TEMP EACTS WATER ��(1 200 I I I I I I 200 SS- 4 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size /Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- STA 16+55 BRIDGE < 0.01 0.02 85.8 126.1 **TEMP. CAUSEWAY 30.2 2 -L- STA 17+19 TO ROADWAY < 0.01 0.08 -L- STA 21+22 TOTALS*: I < 0.01 0.08 < 0.01 0.02 86 156 0 *Rounded totals are sum of actual impacts NOTES: Bridge: Permanent SW impacts due to bents locations on channels banks and bank stabilization utilized for protection. NC DEPARTMENT OF TRANSPORTATION **Temp. Causeway: Temp. impacts due to causeway are included w/the Temp. impacts reported for the bridge. DIVISION OF HIGHWAYS Roadway: Permanent Wetland impacts due to the proposed grass shoulder widening. 4/7/2021 MONTGOMERY COUNTY SF-610190 WBS: 17BP.8.R.135 Revised September 2014 SHEET 11 OF 11