HomeMy WebLinkAboutNCG500129_NOD2021PC0383_Compliance Evaluation Inspection_20210608
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
June 08, 2021
Chuck Ahlrichs, President
Northbrook Carolina Hydro II LLC
Email: cahlrichs@nbenergy.com
SUBJECT: NOTICE OF DEFICIENCY
Tracking Number: NOD-2021-PC-0383
Permit No. NCG500129
Bryson Hydroelectric Project
Swain County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Bryson Hydroelectric Project on
May 25, 2021. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NCG500129. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following deficiency(s) was noted during the inspection:
Inspection Area Description of Deficiency _________________________________________________________________________________________________________________________________________________________________________ Effluent Sampling Failure to sample as General Permit requires in Part 1 - Sections B. (3.) and (4.).
_________________________________________________________________________________________________________________________________________________________________________
Upstream / Downstream It is unclear where the downstream sampling point is located and if that location provides
Sampling representative samples. _________________________________________________________________________________________________________________________________________________________________________
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. To prevent further action, carefully review these deficiencies and address the causes of
non-compliance to prevent the recurrence of similar situations.
If you should have any questions, please do not hesitate to contact Lauren Armeni with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4500.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
Kyle Kroeger, Co-President
Chris Sinclair, Vice President, Business Development
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NCG500129 21/05/25 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Bryson Hydroelectric Project
310 Dam Rd
Bryson City NC 28713
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
09:30AM 21/05/25 20/12/11
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
10:00AM 21/05/25 25/11/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Chuck Ahlrichs,14550 N Frank Lloyd Wright Blvd Ste 210 Scottsdale AZ
85260//480-551-1771/4805511991
Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Effluent/Receiving Waters Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Lauren E Armeni DWR/ARO WQ/828-296-4500/
Stephanie A Williams DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
6/8/2021
6/8/2021
6/8/2021
NPDES yr/mo/day
21/05/25
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Lauren Armeni and Stephanie Williams conducted a compliance evaluation inspection to ensure the
facility is operating in compliance with General Permit NCG500000. Jimmy Millsaps and Jimmy
Williams (Operations and Maintenance) were present during the inspection.
The Bryson Hydroelectric facility consists of two Francis turbine generators which are cooled by water
that is piped to the them. Each turbine generator has an oil catch pan that catches excess oil and
automatically drains into a tank in the basement. Once the oil in the tank reaches 6-inches, an alarm
is triggered and the oil is manually pumped into a drum that is taken to a recycling center.
The following deficiencies were noted during the inspection:
1. Effluent sampling has not been conducted as required in the General Permit, Part 1 - Sections B.
(3.) and (4.).
2. It is unclear where the downstream sampling point is located and if that location provides
representative samples. It is recommended to provide a map that outlines all sampling locations at
the facility.
Based on the above deficiencies, the facility is in non-compliance with the requirements outlined in
the General Permit.
NCG500129 17 (Cont.)
Page#2
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
Permit:NCG500129
Inspection Date:05/25/2021
Owner - Facility:
Inspection Type:
Bryson Hydroelectric Project
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
The Bryson City Hydroelectric station includes two generators and two outfalls.Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Page#3
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
Permit:NCG500129
Inspection Date:05/25/2021
Owner - Facility:
Inspection Type:
Bryson Hydroelectric Project
Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
A copy of the NPDES General Permit will be provided with this report and should be
distribted to the facility.
Comment:
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
The contract lab used for sample collection and analysis is Kace Environmental.Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Failure to sample as the General Permit requires in Part 1 Section B (3.) and (4.).Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Flow is calculated based on megawatt output.Comment:
Upstream / Downstream Sampling Yes No NA NE
Page#4
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
Permit:NCG500129
Inspection Date:05/25/2021
Owner - Facility:
Inspection Type:
Bryson Hydroelectric Project
Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type,
and sampling location)?
It is unclear where the downstream sampling point is located and if that location
provides representative samples.
Comment:
Page#5
DocuSign Envelope ID: B16D7399-BB6D-4D2C-B0F8-4386ACBB2B33
-r ..
., �'�..
a '..
��
�l.
;� .�#,� .
� ��
'iy3
�� � � � ¢sue!/;/,
i/� /
•, � ri,
y�6
. «:
wa
r'
J '.
�.
►i
_ �_�;-o �
��
u
ter^
mwmmwa
_ _A
ac `'
t 4.�
F
iiF �_ ' 1►�+ it '
(-i
• x
aA
• r apt' "�,� .
tat
ar.__-ks
.. vjr�L.
al
\1
r
• . • 1 ;Por
Ap
,-`r
�;` ,.ti.�_{; to - Jf ` ✓r. a ;"f l
All
' o-' �, "•,, .�f` r'� '" , r7 Y�
}D��
. � Fj,2Pc.a}�.: " � ' V,.:W.7r, �"y tr r
r _ in i'r e :r F .. �' kyk . s Y. F' Tee
R
'lei Al
i` „' >-.,x�•,: \tr ft is `� * .Y �•'
`F .�c+ "
ff
LL r. q't r r*'M,.Y. 'r;'E Lam" • .
-
,-
NAOMI
w
Aftgji
.. . >r.
r let,
me
kr
IN
AN
Neel,AllI r % It
00
rrer
''
be ell, e
IN A
I A AN Le
Alto
Ate
i
Y
ip - . -
�J'L All
IN " `-r s .t
bI
IN
.We
ol
All I
ArtA; 'Nev
ANA,A
r.A._All
IN I
AM ANN
AM
L sr�% .. - s
IP
r K... off
r'1•/ .` F "1, n�. s t., r• �� # lt�r rYs}�,,
f s� it i AM
Of fro
[ ",'r ,
M
of
Td
tfPC
ifr a!
!� ,�.,� ry r�d,'r �
all, Pro
ow', P411
71
:311171, Plot I .�f kIet 1l 14
litBe poic . x n+: �i s w fl' P b q
:'1} '` ,o.yv .p. Af'4ke .i'.,y 7� r h
I Par
Lj.Z-•.� yji _ E 'i'7 . r iT y. M �- '`✓,i"- �.�" <� �;`
i
Y e ti.,{MI' a f.,-� 4 , r,' .' rµ`frtof
` w K
a.
\ :'� , x::. - c` tin `�•t
�7tk
y�
r
• - } i T P ..ate !+"IV I
iro
It
PC
TT'"PIP,-
0 Imp
r I If
T� S t.
,a _ PIP IPC
ar
�K
off
ww
Pro H
or FF
it
lk
t' e
I I I
..
A.
} r�,. d y d r'I 1 _
a is
N�4� 7 _ yPoe
a6f� C 41 1 L
if
y,
14
fal
' 1 I
P.
for
VP
•ate �_; - _ - _ _ —__. Tr
1 F �
I � Aot
I
'a�'i17t
4�f, �.
3
t�l
�'
�n
q.
�W
-l�J
-1
•��
n
1
I',
7-
-��C
r F
:
T
,
�
`
c
� I'�
w'ii
� ��.
1 Y�
�� �/ �!I,` 1 I
^� � ti
r �•p � y ��J
^�'� �
�i7 a� .}�.? �
wit � '.+'-t'��0.��, +rt Y'Y�� r,� - M.�
. 'fir _ 'LY �N �1 � •k ?R � r
�9" lE y t ��� � ! V��
� �� - r\
,,
r
t 1 ,,. i
�.
u
2
Weather '
Temp I Rh
Tail Race Condition
Spillway condition
Leaks /Seepage/ Erosior
Intake/Trash Rake Condltioi
Trash Rake Operation,
it Race Camera u eraiw� �a�
Coolin Fans
Foreba Level
Tainter Gate Position
Meter reading Un_�t 1
Meter readin Unit2
48V DC System
:111
Condition
Condensate Drains
Governor sysI III
tem
III
Tank pil1evel
Gov re ssureTank Pressure
Gov pressure Tank Level
Gov ReseNoire TemF
oire Tank
Gov Resery Gov Cow
Comments
Meter
Location Bryson
Total