Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0023510_Regional Office Historical File Pre 2018
Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality January 20, 2004 Mr. Stephen L. Smoak, President Acorn Holdings, LLC 212 Morning Mist Way Woodstock, Georgia 30189 Subject: Permit No. WQ0023510 Acorn Holdings, LLC Acorn Business Park Wastewater Collection System Extension Iredell County, North Carolina Dear Mr. Smoak: In accordance with your application received on January 6, 2004, and additional information received on January 9, 2004, we are forwarding herewith Permit No. W00023510, dated January 20, 2004, to Acorn Holdings, LLC for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any, individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that not meet 1)15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Mi Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted -June 1/ applicable, unless specifically mentioned herein. Division approval is based on accepts certification provided by a North Carolina -licensed Professional Engineer in the applicatio/ the Permittee's responsibility to ensure that the as -constructed project meets the appl criteria and rules. Failure to comply may result in penalties in accordance with North 0 Statute §143-215.6A through §143-215.6C, construction of additional or replace/ collection facilities, and/or referral of the North Carolina -licensed Professional Engi board. Mooresville Regional Office 919 N. Main Street, Mooresville, NC 28115 DENR Customer Service Center Internet http:lfi2o.enr.stat/ Telephone (704) 663-16/ Telephone 1 877 623-6748 Mr. Stephen Smoak Page 2 January 20, 2004 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Acom Holdings, LLC for the construction and operation of approximately 429 linear feet of 8- inch gravity sewer to serve 160 employees as part of the Acom Business Park project, and the discharge of 4,000 gallons per day of collected domestic wastewater into the Town of Mooresville's Rocky River WWTP (NPDES No. NC0046728) existing sewerage system, pursuant to the application received January 6, 2004, and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall become voidable unless the agreement between Acom Holdings, LLC and the Town of Mooresville for collection and final treatment of wastewater is in full force and effect. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes 143-215.6A to 143-215.6C for violation of or failure to act in accordance with the terms and conditions of this permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1508 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Sonja Williams at (704) 663-1699. Sincerely, for Alan W. Klimek, P.E. cc: Iredell County Heatth Department Mooresville Regional Office, Water Quality Section (WVVTF Permit No. NC0046728) Dan Brewer, Chas.H. Sells, Inc. Water Quality Central Files NDPU Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is riot required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 21_ .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at !east three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by_ documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by .the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733- 3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Forrn CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Forrn CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 20th day of January, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION forAlan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number W00023510 Fast Track Engineering Certification Permit No. WQ0023510 January 20, 2004 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension. • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION El Partial ❑ Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, El weekly, ❑ full time) the construction of the Acorn Business Park, Iredell County project for the Pemiittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE 919 N. MAIN STREET MOORESVILLE NC 28115 The Perrnittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. pppipOF NORTH CAROLINA COUNTY OF Iredell Permit No. V\1Q Oa 2 3 S 10 DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (di) and entered into this 26 day of November, 2003 , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Acorn Holdings, LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Iredell County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as Acorn Business Park (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the Acorn Business Park Owner's Association (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Quality has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. rrynli z,cAr il,Ihro „ 1 „F� rae DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and ppurtenanbes thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for, special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit may require as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, .E., Direc Division of Water Quality ollZalzoo4- (Date) ACORN HOLDINGS ,.LLC., Name of DE . EL • PER (Signatur �TEI�/�EnJ 2 . rev%Di4 rL- f "'SiacN T Print Name and Title fI-28-o3 (Date) FORM: DFV 02/03 Page 2 of 2 RACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 1 USE THE. TAB KEY TO MOVE FROM FIELti TO FIELD! Owner.: a, Acorn Holdings, LLC Full Legal Name (company, municipality, HOA, utility, et Stephen L. Smoak, President Application Number: (to be completed by DWQ) Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) The legal entity who will own this system is: Individual ❑ Federal ❑ Municipality ❑ State/County Private Partnership ❑ Corporation El Other (specify): 212 Morning Mist Way Street Address GA State h. 770-655-9800 Telephone Project (Facility) Acorn Business Park Brief Project Name (permi Contact Person: W...,._ ._. 678-445-6230 Facsimile ion: efer to this name Steven Bailey - Chas. H. Sells, Inc. - Project Manager e. Woodstock City 1,g. 30189 Zip Code acomsmoak@aol.co E-mail 2b. I redell County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application b. (704) 662-0100 Phone Number 3c. sbailey@chashsells.com E-mad Project is ►yt! New ❑ Modification (of an existing permit) If Modification, Permit No.: Owner is ❑ Public (skip to item 8(3)) Private (go to Item 2(a)) private, applicant will be: 2b. If sold, facilities owned by a (must choose one ❑ Retaining Ownership (Le. store, church, single office, etc.) Leasing units (lots, townhomes, etc, - skip to Item 8(3)) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) Town of Mooresville ❑ Public Utility (Instruction III) El Homeowner Assoc./Developer (Instruction IV) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a, Rocky River WWTP 4b. NC0046728 Name of WWTF WWTF Permit No. Town of Mooresville 5b. 8" Owner of Downstream Sewer Receiving Sewer Size The origin of this wastewater is (check all that apply): ❑ Residential Subdivision 0 Car Wash ❑ Apartments/Condominiums ❑ Institution ❑ Mobile Home Park 0 Hospital ❑ School ❑ Church ❑ Restaurant 0 Nursing Home Office ❑ Other (specify): Permit Number of Downstream Sewer 100 % Domestic/Commercial Volume of wastewater to be permitted in this project: 4,000 gallons per day If the permitted flow is �� -.__._ �,.._......a.. zero, indicate why: ❑ Interceptor Line - Flow will be permitted is subsequent permits that connect to this line E Flow has already been allocated in Permit No, ❑ Rehabilitation or replacement of existing sewer with no new flow expected % Industrial % Other (specify): FTA 02/03 CK APPLICATION for GRAVITY S P STATIONS, AND FORCE MAINS PAGE 2 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below, Values other than that in 15A NCAC 2H .0219(1)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(1)(3). Offices: 160 employees X 25ga1/person =4,000 gpd 0. Summary of Sewer Lines to be Permitted (attach additional sheets if necessa Size inches Length (feet) ENTER TOTAL LINE LENGTH IN MILES' Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID as shown on plans) Design Flow (MGD) Operational Point GPM @TDH._....._ Gravity or Force Main (pull down menu) Gravity Power Reliability Option (duat line feed, permanent generator MATS, portable generator w/autodialer, wet well storage) Mae sthetsewest er version), complyGrayitywiththe_._.. e_ n_._. • systemMinimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? ►" Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 3. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes No 0 N/A Sedimentation and Erosion Control Plan? Yes ❑ No 0 N/A Stormwater? El Yes 0 No ® N/A FTA !17/ff CK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 11. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02103 z 1 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as 0 I necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality F— I regional office (see instructions for addresses) OR indicate the following: a ® A Watershed Classification is not needed because all parts of the project are at least 100 feet away from any down 0 slope waterbody; AND, ® A Watershed Classification is not needed because the design does not depend on wet well storage as a power I reliability option for any pump station near a Class C down slope waterbody. JLocation ID Name of Waterbody Stream' Waterbody C.)I on Map Waterbody County River Basin Index L Classification LL Submit the 8.5" x 11" topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification: l attest that this application for Acorn Business Park has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a' Class 2mide e am which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 pepitigr1. la. Signing 'OIjai Signature' 2. Professional Engineer's Certification: /o-/S--D 3 Date 1 attest that this application for Acorn Business Park has been reviewed by me and is © accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting Q documentation to the best of my knowledge. l further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force LL: Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my Id. signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. W Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false 0 ; statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a I fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. CI I .2a. Dan E. Brewer, P.E. i Professional Engineer Name 2b. Chas. H. Sells, Inc. Engineering Firm 2c. 128 Overhill Drive Suite 105 L Address 2d. Mooresville . City 2e. NC 2f. 28117 State Zip 2g. (704) 662-0100 2h. (704) 662-0101 '21. dbrewernchashsells.com Telephone ; Facsimile E-mail „,%%°410 CAR0''''' ,1111 ill 111 f, Q. 582 r%f09- Seal,Signature & Date FTA 02/03 01/19/04 Permit Number WQ0023510 Program Category Non -discharge Permit Type Fast Track Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer sonja.wiltiams Permitted Flow 4000 Facility Permit Tracking Slip Status Project Type In review New Project Version Permit Classification Individual Permit Contact Affiliation Facility Name Acom Business Park Location Address Owner Major/Minor Minor Region Mooresville County fredell Facility Contact Affiliation Owner Name Acom Holdings, LLC Dates/Events Owner Type Non -Government Owner Affiliation Stephen Smoak 212 Moming Mist Way Woodstock GA 30189 Scheduled Oriq Issue App Received Draft Initiated Issuance 01 /06/04 Regulated Activities Public Notice Issue Effective V 2tJ/D 4- RequestedlReceived Events Commercial or Industrial. other Wastewater collection Outfall NULL Additional information requested Additional information received Expiration 01 /07/04 01 /09/04 Waterbody Name Stream Index Number Current Class Subbasin TOWN OF MOORESVILLE PLANNING & ENGINEERING DEPARTMENT November 24, 2003 Chas H. Sells, Inc. Mr. Steve Bailey 128 Overhill Dr. Suite 105 Mooresville, NC 28117 Re: Acorn Business Park Flow Acceptance Letter Steve: Derek Slocum, El Civil Engineer Town of Mooresville P. O. Box 878 Mooresville, NC 28115 (704) 799-8017 Fax 662-7039 The Mooresville Town Board had previously approved the above -referenced commercial development and agreed to provide potable water service to and accept the sewer flow from the Acorn Business Park. The Town of Mooresville Water System Management Plan was submitted approximately July 30, 2000, was approved and assigned WSMP No. 00- 01958. Mooresville's Water Filter Plant PWS ID# is 01-49-015. Both water and sewer systems are owned and maintained by the Town of Mooresville. Wastewater will be treated by the Town of Mooresville's Rocky River WWTP, NPDES Permit No. NC0046728. This development's expected input into the WWTP is 4,000 gpd. It is your responsibility, as the engineer of record, to certify to the State that construction has been completed in accordance with the approved plans and specs. The Town will conduct periodic inspections during construction and will hold a final inspection prior to accepting the utility lines into the Town's system. Two reproducible (mylar) copies of the "As -Built" drawings along with your engineer's certification should be submitted to this office prior to acceptance by the Town. We look forward to working with you on this project. Civil Engineer CC: Wilce Martin, Utilities Director Consulting Engineers, Surveyors & Photogrammetrists January 6, 2004 NCDENR, Division of Water Quality 919 N. Main Street Mooresville, NC 28115 Reference: Fast -Track Application Package Acorn Business Park Mooresville, North Carolina Ladies and Gentlemen: PRINGiPALS sTEVCN V\/ SMITH. PE. SUSA.N K. EASNACHT, PE MOSE D. HUONOOORE, P.E. THOMAS NOVELLINO,C.P. SENIOR ASSOCEIAT- TS )AN E BREWER, PE K)EL H. PATTERSON, III, P.L.S JAN 0 6 2004 EPT OF E R MOORESVILLE RE 4 1 Please find attached one copy and one original application titled "Fast -Track Application for Gravity Sewers, Pump Stations and Force Mains" for the above referenced project. Also included in the package is a check for $400 for application fee, one original and two copies of the operational agreement, two copies of the flow acceptance letter and an 8.5-inch by 11-inch quad map. I also included a copy of the Secretary of State's Certificate of Authority for Acorn Holdings, LLC. If you have any questions or require additional inforrnation, please contact us. Respectfully submitted, Chas. H. Sells, Inc. Steven L Bailey Project Manager Cc: Mr. Stephen L. Smoak, Acorn Holdings, LLC 12B ON vrhill Drive • Skeii elOe; • VI NC 28117 • '11 Pl • Fax: 704.06-2,0101 • ,ivwm_eieeilisells..eimi AN 1DCAI, \IT ALT Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality Coleen H.Sullins, Deputy Director Division of Water Quality January 7, 2004 CERTIFIED MAIL RETURN RECEIPT REQUESTED Stephen Smoak, President Acom Holdings, LLC 212 Moming Mist Way Woodstock, Ga 30189 Subject: Dear Mr. Smoak; Retum of Permit Application Package Acom Business Park Wastewater Collection System Extension Iredell County, North Carolina The Division of Water Quality's Mooresville Regional Office is unable to accept the enclosed application package for review for the following reason: ✓ A North Carolina -licensed Professional Engineer did not sign, seal and date the Professional Engineer's Certification in Item V of the application. Please note that the item listed above must be completed prior to resubmitting the permit application package for approval. Your application is being returned as incomplete in accordance with 15A NCAC 2H .0208. The success of the fast -track approval process depends upon the receipt of complete and accurate applications. Please make the appropriate corrections and resubmit the application_ The review process will then begin upon receipt of the completed application. Note: The application package and check were returned to the project's listed engineering firm, Chas. H. Sells, Inc. Please be advised that construction and/or operation of wastewater collection system extension without a valid permit is a violation of North Carolina General Statute 143-215.1 and may subject the Applicant to appropriate enforcement actions in accordance with North Carolina General Statute 143-215.6. Civil penalties of up to $25,000 per day per violation may be assessed for failure to secure a permit required by North Carolina General Statute 143-215.1. If you should have any questions regarding the acceptance of your application, please do not hesitate to contact me at (704) 663-1699. Thank you for your cooperation. No Enclosures cc: Sincerely, Sonja Williams Consultant Dan Brewer, Chas. H. Sells, Inc. (Application + Check No. 1015 enclosed) Mooresville Regional Office 919 N. Main Street, Mooresville, NC 28115 4421 NCDENR Internet http:lfi2a.enr.state.nc.us/ Telephone (704) 663-1699 Fax (704) 663-6040 DENR Customer Service Center An Equal Opportunity Action Employer Telephone 1 800 623-7748 50% recycled/10% post -consumer paper CHAS. H. SELLS, INC. TRANSMITTAL Consulting Engineers,. Surveyors & Photogrammetrists 120 Overhill Drive, Suite 105, Mooresville, NC 28117 Phone: (704) 662-0100 Fax: (704) 662-0101 To: Sonja Williams Date: 119104 Company: NCDENR, Division of Water Quality Project Acorn Business Park Address: 919 N. Main Street CHS# 036264 Mooresville, NC 28115 Hand Delivery FOR YOUR: Q Approval 0 Use ❑ Information 0 Review & Comment 0 Record ❑ Distribution WE TRANSMIT THE FOLLOWING: COPIES DATE DESCRIPTION 1 117104 Sealed Permit Application Package & Check for $400. fit; ;;i';11. OF ENVIpc! u AM i4NA7,,' r:' i. RP, i r. L_Ir]L:LFILv.0,1 'i ' ONAL L JAN, 0.9 2004 Itar ,.93 ? ITECT YS REMARKS: Katy Short Name CE4: