Loading...
HomeMy WebLinkAbout20120900 Ver 2_Notice of Completion_20210602 Cube Hydro Carolinas LLC 293 Highway 740 PO Box 575 Badin, NC 28009-0575 1 June 2, 2021 Chonticha McDaniel NC Department of Environmental Quality Division of Water Resources 401 & Buffer Permitting 512 N. Salisbury Street, Suite 942-E, Raleigh, NC 27604 Via E-Mail Subject: Yadkin Hydroelectric Project (FERC No. 2197) 401 Water Quality Certification Implementation and Compliance Dear Ms. McDaniel: The purpose of this letter is to inform and update the North Carolina Department of Environmental Quality (“NCDEQ”), Division of Water Resources (“DWR”) on the status of Cube Yadkin Generation, LLC (“Cube Yadkin’s”) construction of the planned improvements and upgrades that are required by the North Carolina 401 Water Quality Certification - #4035 (the “Certification”), which was reissued by NCDEQ to Cube Yadkin on February 3, 20171. Any capitalized term used but not otherwise defined in this letter shall have the meaning ascribed to it in the Certification. As explained in greater detail in the Improvements and Upgrades table set forth below, Cube Yadkin is hereby providing NCDEQ with written notice that “all of the improvements and upgrades required by [the] Certification are complete[]” (Certification Condition No. 11.F) and is therefore proceeding with immediate cancellation of the Surety Bond, which Cube Yadkin has maintained in accordance with Condition No. 11.A of the Certification. The chart references each Notice of Completion Cube Yadkin filed in connection with each required improvement and upgrade. For the avoidance of doubt, Cube Yadkin intends to continue maintaining the Monitoring Bond in accordance with Certification Condition No. 11.A because there are ongoing monitoring requirements. For your convenience, the status of Cube Yadkin’s monitoring efforts is summarized in the table of Monitoring Obligations set forth below. Improvements and Upgrades Condition No. Update/Status No. 11 Surety Bond / Monitoring Bond Secured 2017-2021. NCDWR approved the reduction of the total bond amounts in 2018. No. 12A FERC Approval for DO Enhancements Complete. All required FERC approvals have been received. 1 The Certification was originally issued to Alcoa Power Generating Inc. Yadkin Division on October 23, 2015. Cube Hydro Carolinas LLC 293 Highway 740 PO Box 575 Badin, NC 28009-0575 2 Condition No. Update/Status No. 12B Installation of Upgrades to Generators at High Rock and Narrows (Unit 3) Complete. Through-the-blade aeration has been installed at each of the three turbines at High Rock. An aerating turbine was installed and commissioned at High Rock Unit 1 by April 2019. The aerating turbine at High Rock Unit 2 and High Rock Unit 3 were completed and commissioned in February 2020 and December 20202, respectively. In late 2017, two draft tube air valves were installed on Narrows Unit 3. No. 12C Cone Valves at High Rock, Tuckertown, and Narrows Complete. Dedekind cone valves (1 each) were installed at High Rock and Tuckertown. Monitoring was conducted to test effectiveness of the cone valves and report was filed with FERC n 4/30/2018. By letter dated 10/7/2019, NCDWR approved the use of the linear cone valves at High Rock and Tuckertown to satisfy the requirements under Condition 12.C. The installation of an aerating valve at Narrows has not been required because the DO standard has consistently been met since license issuance (99-100% compliance). No. 12D Assess Need for Installation of DO Enhancement Technology at Falls Complete. The Falls 90-day report was included in the 2018 Annual DO/Temperature Monitoring Report submitted via email to NCDWR on 3/1/2019. The report concluded that no additional DO enhancements at Narrows and/or Falls are necessary at this time. No. 12E Upgrade Tailwater DO Monitoring Equipment Complete. DO/temp monitors collect data from each of the four tailwaters May 1 – November 30 annually. No. 12F Update DO Monitoring Plan and QAPP Complete. Revised drafts of the Plan and QAPP submitted to NCDWR in February 2018. NCDWR approved the Plan and QAPP by letter dated 4/18/2018. No. 12I Notices to the Division Ongoing. Provided as needed and noted herein. No. 13C Shoreline Management Complete. Stakeholder meeting on 4/6/2017; FERC approved modifications to SMP appendices on 10/23/2017; updated SMP filed with FERC on 9/24/2018 and was approved by FERC on 2/4/2019 2 By email dated December 17, 2020, Cube Yadkin notified NCDEQ that Cube Yadkin completed the installation of the through-the-turbine dissolved oxygen enhancing technology at all three High Rock generating units, and all three units are operational. Cube Hydro Carolinas LLC 293 Highway 740 PO Box 575 Badin, NC 28009-0575 3 Monitoring Obligations Condition No. Update/Status No. 8 Sediment Removal at City of Salisbury Water Supply Intake Ongoing. In cooperation with Cube Yadkin, Carolina Sand Inc. mines sand at the intakes (most recently spring of 2021) and within 1,000 ft upstream and downstream of the intakes continuously. No. 10A Fish Tissue Sampling Ongoing. Fish tissue samples were collected from Narrows Reservoir during Fall 2017 and a report with the results was submitted to NCDWR on 2/2/2018. Per its 2/20/2018 response, NCDWR did not require addition immediate sampling and required additional sampling on a 10-year interval, with the next sampling scheduled to occur in 2027. No. 10B Priority Pollutant Discharge Monitoring Ongoing. Monitoring was conducted annually 2017-2020. Results were provided to NCDWR by email on 11/6/2017; 10/3/2018; 9/23/2019; and 10/4/2020. Data was also filed with FERC. Five years of monitoring are required, at a minimum; 2021 is the fifth year. No. 10C Narrows Sediment Sampling Ongoing. Sediment samples were collected annually, and annual reports were filed with FERC and NCDWR on 12/6/2017, 10/3/2018, 11/1/2019, and 10/21/2020. Data was also filed with FERC. Five years of monitoring are required; 2021 is the fifth year. No. 12G Optimization of Electrical Generation for DO Enhancement Using Information from Upgraded DO Monitoring Equipment Ongoing. Cube Yadkin has implemented a new program in the High Rock PLC to control the DO valves for the 3 units at High Rock. The program monitors the downstream DO levels at High Rock and Tuckertown, along with water temperature, to determine how high to offset the High Rock DO output to raise the DO levels discharged from High Rock high enough above the required level to allow the DO enhanced water to maintain its DO level in Tuckertown Reservoir until it is discharged at Tuckertown Dam. No. 12H DO Annual Report / Provide Data Quarterly / Every 5 Years include in Annual Report Assessment of Placement of DO Monitors Ongoing. Annual reports have been submitted to NCDWR on 3/1/2017; 3/1/2018; 3/1/2019; 3/1/2020; and 2/26/2021. The reports were also filed with FERC. DO/temperature data has been provided to NCDWR on quarterly basis since 2019 (when the license became final and non- appealable). Cube Hydro Carolinas LLC 293 Highway 740 PO Box 575 Badin, NC 28009-0575 4 Condition No. Update/Status No. 13A Project Operations / LIP Ongoing. The LIP Stage is calculated the first of every month and provided to NCDEQ staff and posted online at Low Inflow Protocol – Cube Hydro Carolinas (cubecarolinas.com). Thank you for your support and collaboration as Cube Yadkin has worked to construct and implement the various project identified in the Certification. Please contact me at (804) 739-0654 or jody.smet@eaglecreekre.com if you have questions or need additional information. Sincerely, Jody J. Smet, AICP VP Regulatory Affairs Eagle Creek Renewable Energy Cube Yadkin Generation, LLC