Loading...
HomeMy WebLinkAbout20210990 Ver 1_SR 1527_Wetland Impact Summary Sheet_20210604Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Bank No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Stabilization (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) SITE #1 dewatering for pipe 0.002 SITE #2 dewatering for pipe 0.002 TOTALS*:0.00 0.003 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *Rounded totals are sum of actual impacts NOTES: Site 1: 65 square feet Site 2: 65 square feet Revised 2013 10 24 SHEET 1 OF 1 6/2/2021 NEW HANOVER COUNTY NC DEPARTMENT OF TRANSPORTATION 3.206511 WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS