Loading...
HomeMy WebLinkAbout20070156 Ver 4_Monitoring Report_20130208A� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director February 8, 2013 Mill Run Development Group II, LLC Mr. Chip Little 335 N. Queen Street Kinston, NC 28501 Re: Cutter Creek Plantation - Mussel Run Headwater Restoration Stream and Neuse Riparian Buffer Restoration Project Year 5 Qualitative Monitoring Report and Site Closeout Greene County DWQ #07 -0156 V4 Dear. Mr. Little: Dee Freeman Secretary On October 2, 2012, Anthony Scarbraugh and Amy Adams with the Division of Water Quality (DWQ) visited the above - referenced site with William Wescott and Emily Greer with US Army Corps of Engineers, Christian Preziosi, Kim Williams and Corey Novak of Land Management Group and Chip Little and Glenn Keefe with Mill Run Development Group for the purpose of evaluating buffer areas on the site. At the conclusion of the on -site meeting in October 2012, the DWQ staff determined the southern reach originating at Ormandsville Road to the confluence of the stream to the west does not meet the criteria of Intermittent and Perennial Streams and Their Origins (V.4.11, 2010). Therefore, the mitigation credit associated with the reach will not be available for Neuse River Riparian Buffer Credit. DWQ requested an on -site inventory be completed to determine the Neuse River Riparian Buffer Credit. On October 12, 2012, DWQ received the requested information and determined that 102,000 square feet of Zone 1 and 68,000 square feet of Zone 2 was the credit available. The replanted areas appeared satisfactory during our site meeting, and the originally - planted areas were very dense and woody vegetation was robust and diverse. A closed canopy has formed over most of the stream, and deep- rooted woody vegetation appears to be providing good bank stabilization. Quantitative monitoring of the riparian buffer areas appeared to be meeting performance standards and therefore no further vegetation monitoring is required and the buffer mitigation project is considered closed out. 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -6300 \ FAX: 919 - 807 -6492 Internet: www.ncwateroualitV.orq An Equal Opportunity \ Affirmative Action Employer NorthCarolina Naturally, Mill Run Development Group II, LLC Mr. Chip Little Page 2 of 2 Thank you for your efforts and cooperation which have resulted in a successful riparian buffer mitigation project. Please feel free to contact Anthony Scarbraugh at (252) 948 -3924 or me if you have any questions regarding this project or our comments. Sincerely, Amy Ada_, Regional Supervisor Surface Water Protection Section Washington Regional Office cc: William Wescott, Corps of Engineers Washington Regulatory Field Office DEMLR, WaRO DWQ Webscape Unit Kim Williams — LMG Inc., PO Box 2522, Wilmington, NC 28402 File Copy 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919-807 -6492 Internet: www.ncwaterguality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarohna naturally