Loading...
HomeMy WebLinkAbout20170239 Ver 2_U-3109A NOV_20210604 Wanucha, Dave From:Eason, Patty P Sent:Friday, June 4, 2021 4:58 PM To:Eplin, Tamera; Wrenn, Brian L; Vinson, Toby; Coco, Julie; Ansel, Douglas R; Turney, Kimberly; Chapman, Amy; Wanucha, Dave; Deborah Reese; David.E.Bailey2 @usace.army.mil; Kaid, Latif; Keeter, Ronald L Jr.; Harris III, Philip S; Archer III, Wright Cc:Harper, Aaron A; Johnson, Daniel H; Parker, Jerry A; Harris, David B; Howell, John Subject:U-3109A NOV Attachments:U-3109A EC Plan Cover Sheet.pdf; U-3109A Turbidity Sampling Locations - May 12th 2021.pdf; U-3109A EC Plan Sheets C&G Phase.pdf; U-3109A EC Plan Sheets Final Phase.pdf; Site 13 Inlet 1.JPG; Site 14 Clean Up 2.JPG; ROW Taking.pdf; Right of Way Taking.pdf; JS Between Site 13 and 14.JPG; Turbidity Sampling Results.pdf; U-3109A NOV Response.pdf Attached is the NCDOT Division 7 response to the NOV recently received along with supporting documentation referenced in the response letter. You will receive two emails due to the size of the attachments, this is one of two. Additionally, the response letter and all attached documents will be sent certified mail hard copy. Please let me know if you have questions or need further. Thank you. Patty Eason, PE Division Construction Engineer 336-487-0000 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1