HomeMy WebLinkAbout20170239 Ver 2_U-3109A NOV_20210604
Wanucha, Dave
From:Eason, Patty P
Sent:Friday, June 4, 2021 4:58 PM
To:Eplin, Tamera; Wrenn, Brian L; Vinson, Toby; Coco, Julie; Ansel, Douglas R; Turney,
Kimberly; Chapman, Amy; Wanucha, Dave; Deborah Reese; David.E.Bailey2
@usace.army.mil; Kaid, Latif; Keeter, Ronald L Jr.; Harris III, Philip S; Archer III, Wright
Cc:Harper, Aaron A; Johnson, Daniel H; Parker, Jerry A; Harris, David B; Howell, John
Subject:U-3109A NOV
Attachments:U-3109A EC Plan Cover Sheet.pdf; U-3109A Turbidity Sampling Locations - May 12th
2021.pdf; U-3109A EC Plan Sheets C&G Phase.pdf; U-3109A EC Plan Sheets Final
Phase.pdf; Site 13 Inlet 1.JPG; Site 14 Clean Up 2.JPG; ROW Taking.pdf; Right of Way
Taking.pdf; JS Between Site 13 and 14.JPG; Turbidity Sampling Results.pdf; U-3109A
NOV Response.pdf
Attached is the NCDOT Division 7 response to the NOV recently received along with supporting documentation
referenced in the response letter. You will receive two emails due to the size of the attachments, this is one of
two. Additionally, the response letter and all attached documents will be sent certified mail hard copy.
Please let me know if you have questions or need further.
Thank you.
Patty Eason, PE
Division Construction Engineer
336-487-0000
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1