Loading...
HomeMy WebLinkAbout20170239 Ver 2_FW_ U-3109A Turbidity Sampling Results 5-12-2021_20210604 Wanucha, Dave From:Parker, Jerry A Sent:Thursday, May 13, 2021 2:14 PM To:Wanucha, Dave Cc:Eason, Patty P Subject:FW: U-3109A Turbidity Sampling Results 5-12-2021 Attachments:U-3109A Turbidity Sampling Locations - May 12th 2021.pdf; Turbidity Sampling Results.docx Dave, Per our phone conversation, here are the turbidity sampling results. Jerry From: Harper, Aaron A <aaharper@ncdot.gov> Sent: Thursday, May 13, 2021 7:45 AM To: Howell, John <jhowell@ncdot.gov>; Hayes, John R <jrhayes3@ncdot.gov>; Chad Walsh <cwalsh@rkk.com>; Matthew Leveridge <mleveridge@rkk.com>; Parker, Jerry A <japarker3@ncdot.gov>; dmoore@rkk.com Cc: Archer III, Wright <warcher@ncdot.gov>; Eason, Patty P <peason@ncdot.gov>; Harris, David B <davidharris@ncdot.gov>; DeWit, Benjamin J <bjdewit@ncdot.gov> Subject: U-3109A Turbidity Sampling Results 5-12-2021 Good Morning All, Please see attached document outlining the turbidity sampling results from the U-3109A project collected on 5-12- 2021. Also attached are the EC plan sheets showing the approximate locations of the sampling locations. If you have any questions please feel free to call. Thank You, Aaron Harper, PE Field Operations Engineer Div 7&8 NCDOT Roadside Environmental Unit 919 776 2279 office 919 777 3038 cell aaharper@ncdot.gov P.O. Box 429 th 1530 South 7 Street Sanford, NC 27330 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2