Loading...
HomeMy WebLinkAboutWQ0039769_Regional Office Historical File Pre 2018ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA C LPEPPER terun .0treL/Of February19, 2018 Maria Stroupe, Town Manager Town of Dallas 210 North Holland Street Dallas, NC 28304 Subject: Permit No. WQ0039769 To wn of Dallas Long Creek Apartments Phase 2 Wastewater Collection System Extension Permit Gaston County Dear Ms, Stroup:: In accordance with your application received January 26, 20-18, and additional infonriation received February 15, 2018, we are forwarding herewith Permit No. WQ0039769 dated February 19, 2018 to the -fown of Dallas (PenDittee) for the construction. and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall he considered a part of this permit and is therefore incorporated therein by reference Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must he made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance With 15A NCAC 21 .0403 or any individual system -wide collection system permit issued to the Pertnittee, It shall be the responsibility of the Perminee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may, result in penalties in accordance with North Carolina General Statute §143-215,6A through §14.3-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicator), hearing upon written request within 30 days following receipt of this permit. This request inust he in the form of a written petition, conforming to Chapter 15013 of North Carolina General Statutes, and filed with the Oilice of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Slate of S'agth Caroli,na El -corm -mental 1a1I Wilier Resources ; Water Qualify Regional Operintoris Moocesville Regional Office j 61.0 'East Center Avenue, Sttil.0 301 1 Moresville, North CarJr.,lina 281. 15 70.4 663 1699 If you need additional intbnnation concerning this matter, please contact Ori Tuvia at (704) 235-2190 or yia email at ortjuvixliEnedenr. toy) Sincerely, by W. Core) Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDFQ cc: Jim Chandler (RE„) (E-cop)) Mooresville Regional (Mae Files Water Resources Central Files PLR( S (E.-copy) Page 2 of 8 EnVIr-Ornnenl'alQuth STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTNIENT OF ENVIRONMEN'TAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Dallas Gaston County for the construction and operation of approximately 83.5 linear feet of 8-inch gravity sewer to serve 8 one bedrooms units, 48 two 'bedroom units, 24 three bedroom units and an office as part of Long Creek Apartments Phase 2. Development, and the discharge of 22,130 gallons per day of collected wastewater into the City of Gastonia existing sewerage system, pursuant to the application received January 26, 2018, and additional information received February 15, 2018„ and in conformity with 15A NCAC 2T; the Division's Gravity Sewer .Minimum Design Criteria adopted February 12, 19.96, as applicable; the Division's 'Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently .filed and approved by the Department of Environmental Quality and considered a part .of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitationscontained therein. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ authority the Environmental Management Commission Permit Number: WQ0039769 Permit Issued: February 19, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Town of Dallas is hereby authorized to: -11 Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Long Creek Regional Wastewater Treatment Facility in accordance with Permit Number NC0020184. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1.5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable,. unless specifically mentioned herein, Division approval is based on acceptance of the certification provided by a North .Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 22,130 GPD, shall be made tributary to the subject sewer system until an application for permit modification tbr an increase in flow has been submitted to and approved by the Division. [I.5A NCAC 02T.0304 (b)1 II. STANDARD CONDITIONS 1. This permit is not transferable, In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. 'the approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 021.0104; G.S 143-215.1(3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A„ NCAC .2T th Divisin s ,Gravityer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01 10] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .011.0] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with. an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A. NCAC 2T .0403. If an individual permit is not required, the .following performance criteria shall be m.et: [15A NCAC 02T .0108(b)i: a. The sewer system shall be effectively maintained and operated at alt times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. Page 4 of 8 b. A map of the sewer system shall be developed and shall be actively maintained, c. An operation and maintenance. plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventor and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every dal,/ (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f A general observation of the entire sewer system shall be conducted at least oncc per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with I5A NCAC 2R .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution. of grease education materials to users of the collection system by the permittee or its representative. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary. to 'prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintainedin the full easement width for personnel and equipment accessibility. j, Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. An' process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wa.stewater transport, such as mechanical or electrical failures of pumps, line blockageor breakage, etc.; or b. Any SSO andlor spill over 1,000 gallons; or c, Any SSO and or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to. the Division of Emergency "Management at telephone number (800) 858-0368 or (919) 733-3300, Page 5 of 8 Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence., This report must outline. the actions taken or proposed to he taken to ensure that the problem does not recur. Part 1,1 of Form CS-SSO (or the most current Division approved form) can .also be completed to show that the SSO was beyond control. [G,S, 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall he scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State.. [15A NCAC 021,01.08(b)1 Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall he considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions.. ;If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined, as the design drawings that are marked up or annotated with after construction information and show required buffers,. separation distances, material changes, etc. h. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy„ wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in, force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pimp stations' storage. capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c, Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary -form, Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacit) design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria, Requested modifications or variances to the Minimum Design Criteria, will he reviewed on a case -by -case basis and each on. its own merit. Please note that variances, to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction., After -construction requests are Page 6 of 8 discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .01. 16] Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis, Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T,0•105(01 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection. facilities. [1.5A NCAC 02T .01161 10. Failure to abide by the conditions and limitations contained in this permit; 1.5A NCAC 2T; the Division's Gra.vity Sewer Design Criteria adopted February 12., 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-21 5.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities,. andlor referral of the North Carolina -licensed Professional 1:.ngineer to the licensing hoard. [15.A NCAC 02'1 .0104; 15.A. NCAC 02T .0108(h-0] 11 n the event that the wastewater collection facilities fail to pertbrm satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .011.0; 15A NCAC 02"I .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from. complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining. other permits which maybe required. by the Division or any other Federal, State, of Local government agencies. [G.S. 143-21.5..1(b)1 Page 7 of 8 FAST TRACTTRACKSEWER ENGINEERING CERTIFICATION PERMITTEE: TOWN OF DALLAS PERMIT #: WQ0039769 PROJECT: LONG CREEK APARTMENTS PHASE 2 ISSUE DATE: FEBRUARY 19, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition '7of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt, Send the required documentation to the Regional Supervisor, 'Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERM TFEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name. Titic Signature ENGINEER'S CERTIFICATION' Date .as a duly- registered Professional Enaineer in the State of North Carolina, having been authorized to observe periodically, 0 weekly, j 11111 time) the construction of the project mune and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed tobe built within substantial compliance of this permit; 15A NCAC 02T, the Division of Water Resources' (Division) Gravity, Sewer Minimum Design Criteria adopted February 12, 1996,.as applicahle; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1., 2000, as applicable; and other supporting materials. North Carolina Professional Engineer'sSeal w/signature & date: Final Partial (include description) Certification Continents/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 Division of Water Resources State of North Carolina Department of Environmental Quality Division. of Water Resources 15A NCAC 02T .0300 FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number rIC,9 110 be completed M DWit itern must be completed or the pplicating will be returned 1. APPLICANT INFORMATION: 1, Appl.ic.ant's name: Town of Dallas (company, munici -HOA, uttlay etc) 2.Applicant tpc Jndividual LI Corporation 0 General Partnership Federal fJ State County El Municipal Signature authority's name: Maria Stroupc per Title:. Town Manager 4, Applicant's mailing ,address: 210 N. Holland Street City, Dallas State: NC Zip 28304- .5.. ,Applicants contact information: Phone number: (704) 922-3176 Email ,Address: mstroupe@dallasne,net Ej Privately -Owned Public Uttht El Other V), C OSNIRIVOM 2,0 II. PROJECT INFORMATION: Project name: Long Creek Apartments Phase 2 2„Application/Project status: S Proposed New Permit) 0 Existing 'Permit/Project If a modification, provide the existing permit number: WQ00 and issued date If new construction but part of a master plan, provide the existing permit number WON 3, County where project is located: Gaston 4, :Approximate Coordinates (Decimal Degrees): Latitude:, 35,321-ongitude: 5. Parcel ID (if applicable): 223655 (or Parcel ID to closest downstream sewer) 111, CONSULTANT INFORMATION: 1 Professional Engineer: Iim Chandler License Number: 026466 Finn: Timmons Crow Mailing address: 5410 Trinity Rd, Suite 102 City: Raleigh State: NC: Zip: 27607- Phone number: (919) 866-4507 Entail Address: iim.chandier@timmons,com IV. WASTEWATER TREATMENT FACIISIN (WWTF) INFORMATION: 1 Facility Name: Long, Creek WWIP Permit 'Number: NC00201 84 Owner Name: City.of Gastonia RECEIVING DOWNSTREAM SEWER INFORRTR»I (if different than WWII): Permit Number(s): WQ Downstream (Receiving) Sewer Size: S inch ide Collection Sy,„$iem Perno WQ(S0001 7 Owner Name(s): Gastonia FORM: FTA 04-16 Page 1 of 5 VI. GENERAL_ RFQL°IRF..N1EN lathe Applicant is a Privately -Owned Public t:tilit If the Applicant is wr Developer of lilts t w,. If the .Applicant is to 1191r1L, l'inp ,i,t} t)wner ° r Crian of w,crr,tecciter. (c.he,e. n Residential Owned 0 ReSidenti:rl Leased r1 Sche.11._ preschool Food ,and drink tac°ilities liusi Nature of wastewater : 1 Qt) ". ; Domes [J Retail (.. 11 Retail with Medical ,` dent Church D Nillrsin%t. Horne Has a now reductikrtl hccn approved ander 1, 5 Ufl1111d1"I ZC w4":;1S. ter Owatel" generated h\ t}r+„;)f let: [ stnblishrnent "Type (sec 11 °I',._t11 1-1(1)1 h n;Sinas,. if Public Convenience rtw.e drld Neeessdy twit lfached? A z=. he+d? Ala- le114) Flow "n t1, of L.i1)atsl Flow 1,91u GPI) f S.E,:ft) GPI) GPI) r;i+'l) Itr si,g1steb.yatcr &sign dwelling:, proposed unknown non-residential deweit"Ipale._`ril uses; .„?IahItc access t iciInles Ind residrnat:nil property located south or east of the AtIaritic Intracoastal 'Waterway to he aced waeati:on repttafs as defined genera It include fur. P1.) (pc1 I \ sly permitted se Connect to t1'IYr°r line IL GRAVITY SEWER ,DESIGN CRITERIA Of Applicable) - 92T .,0305 & MI)( ((ravitv Sewersit Summarize gravity sewer to he permitted Size (inches) Length (feet) Material 8 835 C900 PVC Section It & Untie WC for Permitting of Gravity Sewers contains information related to design criteria Section 111 contains information related to minimum ,slopes (or gravity sewer(s) Oversizing lines to meet minimum stupe requirement is not allowed and a violation of the MDC STA.'110N DEstcNi CRITERIA (If Applicable) --,02T ,0,305 & MDC (Puy StrE.,nsiforee Nlainslz COMPLETE FOR EACH PUMP STATION INCLUDEP IN THIS PROJECT imp station number c)r name: 2. Approximate 'rites (Decimal Degrees): Latitude: liongitude: 3, Design flow of the pump station: milliOnS gallons per day (firm capacity) ,4. Operational point(s) or the pump(s): gallons per minute 1l et total dynam c had Summarize the force inain to he permitted rtOr tins Pomp StarUini Size (inches) 1 Length (feet) 1 Material ,•• '-.. .• 1 i 1 $ 6. Power reditibility In accordance wdri 115i\ SiCAC 1I1,030,501.111r, ,tanooy pcorver source or pump with aulomatic rict1v3tiiin and telemetry - 15A NC AC 02T M30501)(1:031: :Jo Recrised (dr all pump stations with an average daily (low grQater than eqUal tO 15,000 grii Ions per (.1ay Ntust be. permanent .to r...tr if the pump station has an average daily flow ihan 15,000 gallon per day: [1.i Portable powcr otrree with rnanual quick-eunnection reccotacie and teleirietry - 15.A NCAC 02-1 ,030.5(Ira 1)W) Or Portable pumping unit with Flogged emorgency pump connecCon and telemetry- - 15A. NC:AC 02T .0305(11)(11 s.tuill he demonstrated to the Dividon that the portable source is owned or corniIicted by the applicant (draft agreement) and is compatible with the station, lithe portznile power source or pump is dedicated to iple pump stations, an CValuation of ail the pump stations' storage capacities and the rotation sche.dule of the portable power source or punip, including, iravel tiireframes, shall be provided in the L%_,,Ise of a ITIUltipk: Station power01 1ORM: PTA Oct- 1h Page ,3 of IX. SETBACKS & SEPARATIONS— (0213 .0200 & 15A NCAC 02T .0305(fl); Does the project comply with all separations found in LC Q:L9t1:4_o) • 5A NCAC 02T.0305(t) contains minimum separations that shall beprovided for Setback Parameter* Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water over sewer including in benche h ntal) Z Yes DNo 10 feet Reclaimed water lines (vertical - reclaimed over sewer) Reclaimeds (horizontal - recla' ed over sew Any private or public water supply source, including any wells, WS-i waters of Class I or ass 11 unded rese v .rs used as a source of drinking water **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundatlo Any basement Final earth grade (vertical) 1.8 inches 2 feet eet 0 feet 10 feet 5 feet 10 feet 36 inches (52eNtLAi',..`0...3,030; contains alternatives where separations in 02.T 030.1.) cannot be achieved, **Stream classifications can be identified using the Division's St Siirfatx Water CI,assiticationwehpAgg .> If noncompliance with 0IJ)3051ti,kir,i,o, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Ej Yes D No NIA • See the Division's draft separation requirements for situations where separation cannot be meet. • No variance is required if the alternative design criteria specified is utilized in design and construction ;i.'• As built documents should reference the location of areas effected Does the project comply with setbacks found in the river basin rules per l,,5A !L!Q Ves No Ej NIA • This would include 'Trout Buffered Streams per :15AN(IA c 2E3,0202 4. Does the project require covera.gelauthorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? ' Information can be obtained from the IUI&t3ffliereemitting,_qrailch Z Yes {-,:j No Does project comply with cif2„1 a) 0,5iclk) (additional permitsicenficaons)? Z Yes D No Per I 5A NCAC 021 j)i 9,5:1Khrfq, directly related environmental permits or certification applications are being prepared, have been applied foror have been obtained. Issuance of this permit is contingent on issuance of dependent perinits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per ISA. NCAC Q27"040.2, "high-prioritysewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to strea.mban.ks that is subject to erosion that undermines or deteriorates the sewer. Yes IjNo N/A If yes. mctude an attachment with details for each line, including type (aenal line, size, material. and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FT A 04-16 Page 4 of 5 X. CERTIFICATIONS: Does the submitted system comply with 15A NCAC 02T, the Monintim,acjga CI-J(A11,1911J11,,: 1,sapliunIt411ftuml:511;*mp. (1,41,Y111_99)„,.1uld the ciraY1tYSeWer„Mintlitlito Ye..,t„fnt„) as applicable? Z 'Y'es No f No, CO mplete and submit the Vartance/A ternative Design Request application (VADC 10-14) and supporting documents for review, A oprovaI of MK:request is. required prior to submittal oldie Fast Track Application and supoorting,documents Professional Engineer's Ceititkanon James (Jim) Chandler micm that this app {Professional Engineer's name from Application Item 111 1 has been reviewed1„)y Inc and is accurate„ complete and consistent with the information supplied in the plans„ specifications, engineering calculations,. and all her supporting documentation to the best of my knowledge,1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations ud Porte Mains (latest version), Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that have reviewed this material and have judged it to be consistent with the proposed design. NO11E1 hi ccordance_ with CrCIICVAI Statutes 14,3-215,6A and I.43-215,6B, any person who knowingly makes any fake statement, representation, or certification in any application package shall he guilty of a Class 2 misdemeanor, which may include a fine not to exceed $1,0,000, as well .as cavil penalties up to $25,000 per violation.. North Carolina Professional Cngineer's seal, signature, and date: SEAL. x, 026486 ip Applicant's Cern tauon per 1 SA NCAC 02T ,0106(15), Maria Stroupe, Town of Dallas, Town Manager ISignature Authority's name & title from Application Iteni 1.3.) attest tha,, this „:_mplication for has been re V -wed by me and is iiiectirz'ile and complete to the best of rny k 1ede 1 nderstaud thai 11 equired parts of this application iire not completed and that if all required supporting documentation and tittaehments are not included, this application package is subject in being returned as incomplete, I understand, that any discharge ,ofwastoc iter from this non - discharge system to surface ‘Ailters or tlie land will result in nt inunediate enforcement i,iction that may include civil penalties, injunctive (the', crr iit prosecution, I will rnake no claim against the Division LAW,iiter Resources should a condition of das permit be violated. 1 zilso understand that if all required, parts of this application package are not completed and that if iill required supposing 1116)ra-wit-NI and attachments are not included, this application package Will be returned to me as incomplete, NOI F — In aceordance with General Statures 1.43-215,6A and 143:21,5„6173,, any person who knowingly makes any false statement, representation, or certification in any application package .shall be guilty or a Class 2 misdemeanor, which may include a (Inc iwt to cxcced $1!0,000a: well as civil pettal(ies up to $25,000 per vOolatiory Signature- 1r - Dale FORM FTA 04-'16 Page 5 of 5 PROJECT A TI Project Name Long :, Phase 2 Location: 1478 Lower Dallas 1iWy, Dallas, NC Owner, L ielopere Co Med Group, L.1.1 P.O. Box 2494 Gastonia, NC 2053 Long' 'reek Apartments, 1 Fred Mills, J., P.C. Box 6171 Raleigh, NC 27628 1'1rct�re. 1 -755- 155 TimmonsCiroup Jim Chandler, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Phone: 1 - 66-4 51 PROJECT DESCRIPTION AND NARRATIVE e proposed project i inside Dallas low jurisdictional litttit and . The scope of th project will include 6 apartment buildings and The proposed public sewer extensionex ension provide dornesuic service subdivision on a .731-acre tract of land in Dallas, NC. Development Flow date, "3 ,1 0 gpd bedroom houses 1u .. dunit bedroom houses r,240 ,earls unit (24) 3 bedroom houses ( 360 gpd.°'unit Cienetwal Business and Office Facilities E pd unit located along Lower Dallas community building, ong Creek P1ias USGS MAP — Gastonia North Quadrangle North Carolina — Gaston Co. - VICINITY MAP NOT TO SCALE - 3, 2918 Stroupe, Town Manager town of Dallas 210 N. Holland Street. Dallas, North Carolina 2; t)34 Subject: Sewer Flow Acceptanee — Long Creek Apartments Phase 2 Revised Dear Ms. Stroupe: Two Rivers Utilities has existing sewer tines in the vicinity of the proposed Long Creek Apartments Phase 2, The proposed development includes the construction of 80 apartments with. an average daily flow of 22,130 gallons per day. Two Rivers Utilities does have the willingness and capability to provide sewer service to the Long Creek Apartments Phase 2, `l''he wastewater from this project will be treated at the Long Creek. WWTP, NPDES Pert it Number NC0020184. The permitted capacity of the Long Creek WWTP is 16 MOD. The Average Daily Flow for .2017 is 6."7 MGE). There is capacity available to provide wastewater treatment for the Long Creek Apartments Phase 2. i'hc commitment to serve is contingent upon the project complying with all local and state regulations. (704) 866-6777 if you have any qu Director 'Two Rivers Utilities ns car need additional information. C: Bill Trudnak, Public Works Direettr, Town of Dallas Michael Bynum, Division Manager, TRU Engineering Stephanie Scheringer, Division Manager, Wastewater Treatment Jim Chandler, Timmons Group P. 0, Box 1748 Gastonia, N.C. 28053 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Trackit Acceptance for Sewer Extension Applications WISE 04-16) Entity Requesting Allocation: Town of Dallas Project Name for which flow is being requested: Long Creek Apartments Phase 2 Mare than one FTSE may be reqteiredfor a single project Ole owner the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow • Complete this section only if you are the owner of the wastewate a. WWTP Facility Name: Long Creek WWTP b. WWTP Facility Permit #: NC0020184 e, WWTP facility's permitted flow t plant. All are in MGD 16.0 d. Estimated obligated flow not yet tributary to the WWTP 1.656 e. WWTP facility's actual avg, flow f. Total flow for this specific request g. Total actual and obligated flows to the .facility h. Percent of permitted flow used 6.5 11. Complete this section for each .pump station you are responsible for along the route of this proposed wastewater flow,. List pump stations located between the project connection point and the WWTP: (A) (3) (C) (D)—(B+C) (E)-(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Finn Flow** CUrrell t Avg. Tributary Flow Plus (Name or Capacity, * (Firm I pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MOD Flow Capacity*** * The Firm Capacity ofauy pump station is defined as the maximum pumped flow that can he achieved with the largest pump taken out of service. ** Design Average- Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf.) not less than Z.S. *** A 'Planning Assessment Addendum shall be attach d. for each pump station located between the project connection point and th.e WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Long Creek Outfall ,Downstream Permit Number: Unknown Page 1 °fa 04-1 6 t ttilaticatStaten the volumevi tie of gas tceiving wastewatet cause any capacity r it a r aute to the tic-cub/in tat: der ti f) tra the, "hest of my kncissici that the addition of project has been evaluated along the route to the ad that the flow from this project is not anticipated to nitaary sc e t° overflows rat° overburden any downstream pump station Herat plant taratl r trrarrraaal itccrrrrstati.e s, given the implementation planned tinprovera arts identified in the plaimmg assessment where applicable, "1"Isis ysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and If attached planning assessment aadd ndums for which 'he responsible party. s form it di ates aecept9nre of dale wags at e` tfar , Page '' rat • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. TRANSMITTAL TO: NCDENR-Mooresville Regional Office Date: 01/23/18 Job #:39509 Water Quality Section 610 E. Center Avenue Mooresville, NC 28115 EJ ENCLOSED PLEASE FIND: WE ARE SENDING UNDER SEPARATE COVER: COPIES f DATE 2 NUMBER 2 6 Project: Long Creek Phase 2 Reference: Copies Sent To: n N RIDWR DESCRIPTION Fast Track Sewer Application Project Narrative USGS map Vicinity Map Flow Acceptance Form Check for $480 THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once, 2 1 1 PylCORTA-;,\P, COMMENTS: Feel free to contact me with any questions at 919-866-4944 ordexterhoweijmmonscorn. Thank you, Dexter Howell Project Manager SIGNED: orrt Trinity Road, Suite l co c7) |Infrastructure Perm Number W00039769 Cent& Files APS Permit Tracking Shp SWP 2/19/2018 Program Category Non -discharge Status Pretend. TYPe Active New Project Parana Type Version Permit Classification Gravity Sewer Extension, Pump Stations., & Pressure Sewer Extensions 1,00Individual Primary Reviewer barry,love Coastal Sl'Hull' Pero-atter:I Flow 22,130 Eratelbrer Permit Contact Affiliation Papally Name Long Creek Apartments Phase 2 Location Address Major/Minor Minor Facility Contact Affiliation Region Mooresville 'County Gaston Owner Name Town of Dallas OofesiEverds Owner Type Government - Municipal Owner Affiliation Rick Coleman Mayor 210 N Ho and St Dallas NC 28034274 Ong Marie 2/1912018 Apo Received 1/26/2018 „GedirellatieCitAbtertridia „fg . . • Draft diatalea Scheduled issuance Earwig Notice issue 2119/2018 .itltairipteratedirRiercerverd Etereartat. •• Effective 21190018 Expiration Apartment coniplex Adaltional information requested 1,29/18 Condominium Addittunal information received 2t15118 Subdivision Sifamming pool backwash bleasteLveler collection tidatereedY Name Strearnlede111umber Current Class Subbasin