HomeMy WebLinkAbout20210927 Ver 1_PreFiling 30-Day Clock Reached Email_20210605Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, June 5, 2021 12:06 AM
To: jason.hartshorn@kimley-horn.com
Cc: Ward, Garcy
Subject: Pre -Filing Time Clock has been reached for Project P134 — Perimeter Security
Compliance, Slocum Road Entry Control Facility - 20210927 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Project P134 —
Perimeter Security Compliance, Slocum Road Entry Control Facility that you submitted on 5/5/2021. The ID number for
that project is 20210927, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
For internal use only: Transportation Project
1
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210927
Version *
1
Washington Regional Office - (252) 946-6481
Garcy Ward
Pre -Filing Meeting Request submitted 5/5/2021
Contact Name *
Contact Email Address*
Project Name*
Jason Hartshorn
jason.hartshorn@Kimley-horn.com
Project P134 — Perimeter Security Compliance, Slocum Road Entry Control
Facility
Project Owner* Marine Corps Air Station Cherry Point
Project County* Craven
Owner Address: Street Address
Environmental Affairs Department
Address Line 2
PSC Box 8006
City State / Bovine / !Region
Cherry Point North Carolina
Fbstal / Zip Code Country
28533 United States
Is this a transportation project?* 6. Yes C No
Type(s) of approval sought from the DWR:
I— 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
fJ Individual Permit r Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes ( No
Do you know the name of the staff member you would like to request a meeting with?
Rick Trone, Amy Chapman, and/or Garcy Ward
Please give a brief project description below and include location information. *
On behalf of our client, USMC MCAS Cherry Point, Kimley-Horn is
submitting this pre -filing meeting request for the proposed Project
P134 — Perimeter Security Compliance, Slocum Road Entry Control
Facility. The project is located along portions of Alexander Road,
Slocum Road and perpendicular to Slocum Creek within the MCAS
Military Base in southeastern Craven County, NC. The area
surrounding the project area largely includes the riparian corridor of
Slocum Creek, with scattered USMC MCAS Military Base residential
housing and commercial developments.
The project proposes to widen Slocum Road from two lanes to four
lanes and relocate the road to better comply with Explosive Safety
Quantity Distance (ESQD) criteria regarding Public Transportation
Routes (PTR) and provide an additional two-lane bridge adjacent to
the existing two-lane bridge over Slocum Creek. Additionally, the
project proposes to provide improved gate and inspection facilities by
replacing an existing Entry Control Facility (ECF) at Slocum Road and
provide a new ECF that will serve as the main entrance and exit point
into and out of MCAS Cherry Point.
The purpose of this project is to enhance the flow of mobilizing forces
to the Aerial Port of Embarkation (APOE), provide proper inspection
facilities for commercial vehicles entering the Air Station, enhance the
service of ordnance deliveries to MCAS Cherry Point ordnance
areas, and upgrade the entrance and traffic controls to meet current
safety and security requirements in order to quickly and efficiently
process inbound traffic on Slocum Road and stop unauthorized
vehicles from entering MCAS Cherry Point.
USMC MCAS Cherry Point has sought to avoid and minimize impacts
to wetlands and streams within the Project while still allowing the
development to remain operationally functional and efficient as well
as financially feasible. Wetland and stream impacts are anticipated as
a result of the proposed project but will be minimized to the greatest
extent practicable. It is anticipated that the project will exceed 0.50
acre of wetland impact and we intend to request authorization under
an Individual Permit.
Please attach the documentation you would like to have the meeting about.
P134 - Slocum JD Features REV 20210416.pdf 3.94MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
eZdzw. ` 7 el/t.etve
Submittal Date 5/5/2021