Loading...
HomeMy WebLinkAbout20210927 Ver 1_PreFiling 30-Day Clock Reached Email_20210605Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, June 5, 2021 12:06 AM To: jason.hartshorn@kimley-horn.com Cc: Ward, Garcy Subject: Pre -Filing Time Clock has been reached for Project P134 — Perimeter Security Compliance, Slocum Road Entry Control Facility - 20210927 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Project P134 — Perimeter Security Compliance, Slocum Road Entry Control Facility that you submitted on 5/5/2021. The ID number for that project is 20210927, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. For internal use only: Transportation Project 1 DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210927 Version * 1 Washington Regional Office - (252) 946-6481 Garcy Ward Pre -Filing Meeting Request submitted 5/5/2021 Contact Name * Contact Email Address* Project Name* Jason Hartshorn jason.hartshorn@Kimley-horn.com Project P134 — Perimeter Security Compliance, Slocum Road Entry Control Facility Project Owner* Marine Corps Air Station Cherry Point Project County* Craven Owner Address: Street Address Environmental Affairs Department Address Line 2 PSC Box 8006 City State / Bovine / !Region Cherry Point North Carolina Fbstal / Zip Code Country 28533 United States Is this a transportation project?* 6. Yes C No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit r Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes ( No Do you know the name of the staff member you would like to request a meeting with? Rick Trone, Amy Chapman, and/or Garcy Ward Please give a brief project description below and include location information. * On behalf of our client, USMC MCAS Cherry Point, Kimley-Horn is submitting this pre -filing meeting request for the proposed Project P134 — Perimeter Security Compliance, Slocum Road Entry Control Facility. The project is located along portions of Alexander Road, Slocum Road and perpendicular to Slocum Creek within the MCAS Military Base in southeastern Craven County, NC. The area surrounding the project area largely includes the riparian corridor of Slocum Creek, with scattered USMC MCAS Military Base residential housing and commercial developments. The project proposes to widen Slocum Road from two lanes to four lanes and relocate the road to better comply with Explosive Safety Quantity Distance (ESQD) criteria regarding Public Transportation Routes (PTR) and provide an additional two-lane bridge adjacent to the existing two-lane bridge over Slocum Creek. Additionally, the project proposes to provide improved gate and inspection facilities by replacing an existing Entry Control Facility (ECF) at Slocum Road and provide a new ECF that will serve as the main entrance and exit point into and out of MCAS Cherry Point. The purpose of this project is to enhance the flow of mobilizing forces to the Aerial Port of Embarkation (APOE), provide proper inspection facilities for commercial vehicles entering the Air Station, enhance the service of ordnance deliveries to MCAS Cherry Point ordnance areas, and upgrade the entrance and traffic controls to meet current safety and security requirements in order to quickly and efficiently process inbound traffic on Slocum Road and stop unauthorized vehicles from entering MCAS Cherry Point. USMC MCAS Cherry Point has sought to avoid and minimize impacts to wetlands and streams within the Project while still allowing the development to remain operationally functional and efficient as well as financially feasible. Wetland and stream impacts are anticipated as a result of the proposed project but will be minimized to the greatest extent practicable. It is anticipated that the project will exceed 0.50 acre of wetland impact and we intend to request authorization under an Individual Permit. Please attach the documentation you would like to have the meeting about. P134 - Slocum JD Features REV 20210416.pdf 3.94MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature eZdzw. ` 7 el/t.etve Submittal Date 5/5/2021