Loading...
HomeMy WebLinkAbout670046_Compliance Evaluation Inspection_20210428Division of Water Resources Facility Number - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: oV Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ft) Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: ® Departure Time: County: Farm Name: 1.0 ilti� �c. Y w� l fit" _ Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Integrator: Region: Phone: 1, 1 C) 3 L( O ®'­0 t Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer I I :::::] Non -Layer Non-L Pullets Other Poults Design Current Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow DischarjZes and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ENo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No [] NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes [:]No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ENo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E/No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: 1 - P i jDate of Inspection: Waste Collection & Treatment ,—�� 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No HINA ❑ NE Structure 1 Structure 2 Structure 3 Identifier: -:0- k Spillway?: Designed Freeboard (in): 7/0 Observed Freeboard (in): '— Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes �oEl ❑ NE ❑ Yes [ ro ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 21ro ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes � ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need // El Yes [�]'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Yes Ea::�o ❑ NA ❑ NE ❑ xcessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus - ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes L� 1 ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per -the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes N�Zou ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes / No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes [_No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ W ekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:]Yes No ❑ N ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: jDate of Inspection: Lj / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [3'NO ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes To ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [5 N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ ❑ No 'NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E]<o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes DNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes / No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) / 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA Q'1�E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes N ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes / No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). y f j6 'ITS jy' C, NJCS Pj�� �5_V \ � C.vr `c�—C_� i S 92 (C f o. c�. �3 mow.,., c� cy Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 "e'_ U e Phone: �� (� 3 S S C� Date: Z Z� 21412015