Loading...
HomeMy WebLinkAbout670001_Compliance Evaluation Inspection_20210507Division of Water Resources Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: -0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: (n uidow P'Owner Email: Owner Name: Mailing Address: Phone: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish t ZkY` l Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Phone: q 10 —CA Q Oil Integrator: Certification Number: Certification Number: Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No WNA A ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) [:]Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [2rN ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 ,� 21412015 Continued Facility � Number: '' - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2ruCcture 3 Structure 4 Structure 5 Identifier: 1 � .3 46�- Spillway?: Designed Freeboard (in): —10 3 5— Observed Freeboard (in): 3--1 & Z ,i,, CCRV& 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? E]I<o ❑ NA ❑ NE ❑ No &NA ❑ NE Structure 6 ❑ Yes [:]4o ❑ NA ❑ NE ❑ Yes E4TNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? es ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Q,ilo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [3No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E]/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ONo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes []/No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E2/No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑,1Go ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes dNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes dNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. oes record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Lr No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No FZ<A ❑ NE Page 2 of 3 21412015 Continued Facility Number: jDate of Inspection: S % 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [3/No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. ❑ F ' re to complete annual sludge survey ❑ Failure to develop a POA for sludge levels Non -compliant sludge levels in any lagoon �� I CZA - `" ' List structure(s) and date of first survey indicating non-compliance: ��,„t 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes dNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No E3 A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes �No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ /No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes jNo o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE ❑ Yes [3"No ❑ NA ❑ NE ❑ Yes DNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA [/1E Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). c% ,�,�� l s G �.� ` U at 0 L4.7 S i15P o-*X- Reviewer/Inspector Name:"y" 9— Reviewer/Inspector Signature: Page 3 of 3 Phone: 4 (o S Date: 21412015