HomeMy WebLinkAbout670007_Compliance Evaluation Inspection_20210526Division of Water Resources
Facility Number FM -0 Division of Soil and Water Conservation
Other Agency
Type of Visit: ® Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
lZeason for Visit: (!) Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: ) County: Region:
Farm Name: � V C ("'A-e Y' C� [ \ CA S 0 i Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: - -� fa At-e-1— Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Integrator:
Phone: q (() ztq too ("'o
Certification Number:
Certification Number:
Latitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
;Non-Layer
ayer
Design Current
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure 0 Application Field ❑ Other:
a. Was the conveyance man-made?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes EfNo ❑ NA ❑ NE
❑ Yes ❑ No NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No ❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
[-]No NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
No ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
El Yes
No ❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: b7 - Date of inspection: 2
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes EfNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No 61AE] NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:_
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 3
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes IZNo ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 0,N ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes �Ko ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes []A<o ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
/ No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
[:]Yes
No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
2<09
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ YesF
toEl
❑ NA
❑ NE
16. Did the facilityfail to secure and/or operate per the irrigation design or wettable
P
❑ Yes
NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
Zo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
Wo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
[:]Yes
YNo
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes / No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ERrNo ❑ N ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: (-; ` - Date of Inspection: S z l
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �;NXo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ N ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No L lit' ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ZNo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes s No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
`
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes ( No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes Q<o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes EZ No ❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
," �
Phone: 10 5,
Date: S—hc
, Z
21412015