Loading...
HomeMy WebLinkAboutNCC203592_Modification Review_20210607Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/7/2021 8:31:57 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 6/7/2021 8:37:04 AM (Construction COC ADD TO FILE Review- NCC203592) The task was assigned to Georgoulias, Bethany A. The due date is: June 10, 2021 5:00 PM 6/7/2021 8:32 AM Y . Ta4M1 w, NORTH CAPOLINA EnYlrenmemf& Qnalay Certificate of NCC203592 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Overhill Farm Solar Power Plant Address Glenn Road, Clinton, NC County Sampson Latitude 34.9820 Longitude -78.3188 Permittee Listed Strata Solar Development, LLC Legally Responsible Markus Wilhelm Individual NC Reference No. NCG01-2020-3592 E&SC Plan ID SAMPS-2021-001 Original NOI 30027 Tracking No.* Date COC Issued* 08/25/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed f Multiple Reasons (List) Addional IVbre information (e.g., new Site Contact details). If lots are being added, please include specific lot nuabers. Explanation You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised E&SCApproval, (lose -Cut Doc, etc.) Documentation 2021-05-04 EC Approval Letter-Overhill.pdf 130.69KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowinglyrenders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto e)ceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Markus Wilhelm Title * Manager Organization* Strata Clean Energy Holdings, LLC Date * 06/07/2021 Email Address* bniemann@stratacleanenergy.com Errail for confirmation Telephone Number* 919-960-6015 Contact nun ber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email dillons@bapa.eng.pro (Optional) Additional errail for confirmation Original Permittee jspaeth@stratasolar.com Email Original Site Contact hstamper@stratasolar.com Email Review Date 06/07/2021 Rescinded Since Submitted? Request Date 20210607 Formatted Review Date 20210607 Formatted