Loading...
HomeMy WebLinkAbout20100349 Ver 1_Certification of Completion_20130227l0 -o3�{q RrEVER North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, III Governor Director Secretary DWQ Project No: 10 -0349 Applicant: Miller Family Limited Parnership V County: Wake Project Name: Kelly Road Widening & Improvements 401 Water Quality Certification Issued Date: May 28,2010 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the Webscape Unit, NC DWQ, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, Hugh J. Gilleece, III , as a duly registered Professional 8707 (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 1 Date: 2.. -L Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit 9W 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 FEB 2 7 2 0 Phone: 919. 807.6300 \ FAX: 919.807-6494 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org IVA ./ TALBERT & BRIGHT q D - o o4o V a. March 11, 2013 401 /Wetlands Unit, NCDENR — Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 -1650 RE: Beaufort- Morehead City Airport Authority Runway 8 -26 Extension 401 Water Quality Certification DWQ No. 1990 0040 V2 Pursuant to the requirements of 401 Water Quality Certification No. 1990 0040 V2, we are forwarding herewith the Certificate of Completion. Construction of the runway extension is complete. If you have any questions regarding this matter, please call. Sincerely, John M. Massey, PE Project Manager ENGINEERING & PLANNING CONSULTANTS jW/;S Mr.-i #r, . r_4 MAR 12 2013 4810 SHELLEY DRIVE WILMINGTON, NC 28405 9107635350 FAX 9107626281