HomeMy WebLinkAbout20100349 Ver 1_Certification of Completion_20130227l0 -o3�{q
RrEVER
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P. E. John E. Skvarla, III
Governor Director Secretary
DWQ Project No:
10 -0349
Applicant: Miller Family Limited Parnership V
County: Wake
Project Name: Kelly Road Widening & Improvements
401 Water Quality Certification Issued Date: May 28,2010
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
Webscape Unit, NC DWQ, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned
to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
Applicant's Certification
I, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, Hugh J. Gilleece, III , as a duly registered Professional 8707 (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the construction such that the construction
was observed to be built within substantial compliance and intent of the 401 Water Quality Certification
and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: 1 Date: 2.. -L
Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit 9W
1650 Mail Service Center, Raleigh, North Carolina 27699.1650
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 FEB 2 7 2 0
Phone: 919. 807.6300 \ FAX: 919.807-6494 \ Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
IVA
./
TALBERT & BRIGHT
q D - o o4o V a.
March 11, 2013
401 /Wetlands Unit,
NCDENR — Division of Water Quality
1650 Mail Service Center
Raleigh NC 27699 -1650
RE: Beaufort- Morehead City Airport Authority
Runway 8 -26 Extension
401 Water Quality Certification
DWQ No. 1990 0040 V2
Pursuant to the requirements of 401 Water Quality Certification No. 1990 0040 V2, we are
forwarding herewith the Certificate of Completion. Construction of the runway extension is
complete.
If you have any questions regarding this matter, please call.
Sincerely,
John M. Massey, PE
Project Manager
ENGINEERING & PLANNING CONSULTANTS
jW/;S
Mr.-i #r, . r_4
MAR 12 2013
4810 SHELLEY DRIVE WILMINGTON, NC 28405 9107635350 FAX 9107626281