Loading...
HomeMy WebLinkAbout20130048 Ver 1_Certification of Completion_201303131a, Do4 g FWA irCREWR mAf North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, PE Dee Freeman Governor Director secretary DWQ Project No.: 12 - o o W g County: W a ke Applicant: To w n a Ap e x Project Name: -_tazx Barbeo a Read Wn r L,K e, Date of Issuance of 401 Water Quality Certification: Fa b r u a � v g t Z o l 2. Certi>Ilcaate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent; or the project engineer. It is not necessary to send certificates from all of these. Applka Ws Cerr#Lvd an hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be bulk within substantial compliance and intent of the 4Q1 Water Quality Certification and Huffer Rules, the approved plans and specifications, and other supporting Materials. - Signature: Agent's Gzr*lca don L . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If th Is project was designed by a CerdfledProfessional I, 5+cM t tY I Fe r 1.1 it as a duly registered Professional _ Cn q �ee(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized - observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used In the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: . Date I I Z – 13 1880 Nd sanrloe Caft RalelAh, NOM COOM 27M1650 Lacdon. 512 N Salbbury St Fbor 9 Re fth North CamIne 27604.1170 Phwa 91W43011 FAX 919 074494 An Equd OPP"%AftMdMAdm Em ftw Registration No. Z 17 i 6 T h�AR 1 3 2013