Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20210528AJutrien. CERTIFIED MAIL May 28, 2021 NC Division of Water Resources - Groundwater Resources Section Attn: Michael Rogers 1636 Mail Service Center Raleigh, NC 27699 Subject: Injection Well Permit #WI0700012 February 2021— April 2021 PCS Phosphate Company, Inc.' Tank Farm Remedial Action System Beaufort Co. Please find the subject groundwater monitoring report attached. This includes the sampling and reporting requirements of the above referenced permit as well as the reporting requirements of the overall Tank Farm Remedial Action Plan. Enclosed are: a) Form GW-59 for injection well CIW7, b) MWTF1-CR, c) Form GW-59 for each of the fourteen withdrawal wells, d) piezometer level monitoring field sheet and e) the summary operational and maintenance report. Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, C D. Daniel Winstead III Senior Environmental Engineer Nutrien 1Jg00 '1c ` 1 1530 NC Hwy 306 South, Aurora, NC USA 27806 nutrien.com 1 Effective January 1, 2018, PCS Phosphate Company, Inc. is an indirect subsidiary of Nutrien Ltd. PCS Phosphate Company, Inc. remains the legal operating entity and permittee. Attachments pc: 12-07-02 (w/ attachments) W.M Ponton (w/attachments) T.E. Herring (w/ attachments) J. A. Casey (w/ attachements) R. B. Lee (w/ attachments) 2 PAPER ONL SUBMIT FORM ON YELLO re 0 ea y.d oz )k §B 0.z 4ze 0k� 00- ccu� Siz z m §U. k 2 § a 0 z er: W10700012 Expiration Date PERMIT Num FACILITY INFORMATION 0 0 Non -Discharge PCS Phosphate Co., INC - Aurora Division E z } § z a. o & o / 0 �) % k "E$ o § § ) ■ # # z •0 < .. 2 a) El CCI } } ] 0 00Lk 00 § k o § { Cul } j o. K a \ o j £) (DODO 1— (0oo Aurora, NC 0 0 \ us 112 § .. - § \ < E / a 2 ) ca 0 k 1530 Hwy 306 S Telephone#: (252)-322-8283 Danny Winstead Contact Person: k E co CU 0 } 0 z Tank Farm Remediation Well Location/Site Name: k f o \ 2 & E � § —■M .g= 0 2 ■ u. ) ■ en FIELD ANALYSES: Date sample collected: 04/20/21 } \ 0 \ E I Well Diameter: 2 ƒ 2 t 0 U z / 0 k \ k 3 < 0 k § � Screened Intery / co E Relative M.P. Elevatio ft. above land surface § Measuring Point is k ] E co cn § k % E / k 0 E To- § O \ } 0 O PCS Phosphate Co. / Environment 1,Inc < < / g 0 0 j C 2 � ƒ 4 EEEEEo < < cfz 0). E 8 8 zczz 0 la k°o ]Z e 2£0 )) as k E S%8 ' E 0) k §k ) Q) / § < < le" uoz NZ 6 a 0 )L �w E §2 . 0 3a /100mL Phosphorus: Total as P 00665 2.525 f k \ 0 0 (Note: Use MPN method for highly turbid samples) e E E \ G E 0 0 E 0 0 0 0 Cd - Cadmium 0 m Chromium: Total o § £ CO /fa) < >- 22S 0 fE 0 .0 k d k o [ < 2 0 o > g ■ 0 0 Kk z } 0 k k I 2 w- k k_ a_1 wƒ E a E E E E E Dissolved Solids:Total 70300 440 \ k k TOC oosso 6.1 Chloride 0094o 7.0 Arsenic 01002 N/A Grease and Oils 00552 N/A \ k I Sulfate 00945 22.1 Specific Conductance 00095 N/A G ) c 2 § G .0 2 2 / TKN as N 00625 N/A Attach Lab Reports): PAPER ONL 0 W } Z 0 2 0 F co m m W 0 0 iq W K m O F 3 0 � )'- a. Oz 9 r G Z 0 u) ca J W 48N a z J z 2 cc 0 Q 00 Zz 4- W W 0 CI Z W 2 K O 17 MAIL SE Z 0 ce Z �u- QI— D a LLI < Z a Z J 0 0 PERMIT Number: W10700012 Non -Discharge 0 0 0 d z aft a) To 0 o C a 0LLI 0 2 i 0 O C c 0 0 0 0 .0 Z E E a N W a) a) G t D- c - 0 - i, m FACILITY INFORMATION Facility Name: PCS Phosphate Co., INC - Aurora Division Permit Name (if different): Aurora, NC Facility Address: co co U z m 65 1530 Hwy 306 South Telephone#: (252)-322-8283 Danny Winstead Contact Person: No. of wells to be sampled: Tank Farm Remediation Well Location/Site Name: a O O _`cre � 0 .0 a) z 0 a 0 z 0 Z J a N FIELD ANALYSES: Date sample collected: 04/20/21 m 2 U Well Diameter: 2 O 0 2 0) co a) 0 Z M CS) O O R a) W O.: ca co CC Screened Interval: c 0 a 0) ._ O a) m E 0) Depth to Water Level 82546: 3.89 ft. above land surface Measuring Point is d U O Z 0 co } ID Field acidifi Z O Z 0 0 V) 0 N >- 0) ❑ z 0 a a' O LL z re O ag 0 J 0 ate) 0 PCS Phosphate Co. / Environment 1,Inc N 0 0 a (0 n N 0 0 0 0 C N N N c 0 C a)) c 0 U a c a) O c 0 0 a rn 0 O 0 m v v (1) o O � r ODJ o Z U U Ja. = < N � U 0 O 0.0 0 E d >. m g N a 0 2 0 O. r Z a) a) O cu 0 0 U > * ' O a a a a L _0 _0 _0 0000 E EE DTr) E E E E E= E>> E 3 3 E E= e Q Q a) Z Z C n 0 (D N EE0 0 co z c z Z O 6 (� o O O R Z Z —I :2 a) O — m v Z Z a A a E 0) J O J 0 N 0) 0 E z m 0 0 0 o ° < < N m Z Z > N (O o(n O o CO >z0 a00i CO U LL 0 N LL m 2 CD la EW z O 01 d 0 CD 0 Z 0 0 d (a O 0 0 a N o 7 `o O L a 0 0 t a J E O O Z 0 E C E Q Z Z Z z, z Z Z Z Z Z Z 0 (O IV 4 O M N 0) (D 0 m 0 0 0 0 0) 0) 0) 0 0 000 0 0 0 (- 0 0 0 0 E 7 7 _7 To a _2 7 3 2 iu E 1—o e v`�) a) m m U m E U LL a) o) 0) m ( U> j , a m m m co a E U 2 2 2 U L Y 0) C 0 2 2 CO J co J J ,J J J J t J 0) .E O) 0) of 0) p) 0) 2 0) E 0 E E 7 E 7 E= E ]issolved Solids:Total 70300 580 pH (Lab) 00403 5.7 TOC 00680 6.7 Arsenic 01002 N/A Grease and Oils 00552 N/A Phenol 32730 N/A Sulfate 00945 228.0 Specific Conductance cams N/A z (o 0 (a E E R H Y U_ Z Z •Z d Z O 0 0 H C a) W Z O 0 0 0 H N 7 C J y! co E o. to TKN as N 00625 N/A re LL 0) m (a co (41 a) a) m 0 c 0 c 0 a E (6 Rev. 05-02-2017 rn 5 SUBMIT FORM ON YELLO W 4 0 W W � W 3 � u_ a 0z j � A Z w n Q8N Q O. 0 a z x 0 < 3J Z W Z Z W z 0 01 W J 2 a) a) 0 o _U X W O O O 1- L 0) E 3 al Z t H us 5 0 ti W 0 FACILITY INFORMATION PCS Phosphate Co., INC - Aurora Division 0 0 60 0 N Aurora, NC -c co O 1 0 M 0 0 O U 0 60 N 0 Z (0 2 0 v a) o E M E E Z Z Q i 0 CO G) as u a u N 0 Telephone#: (252)-322-8283 Danny Winstead Contact Person: 0 0 Tank Farm Rem Well Location/Site Na E • J c 01 J (1) 0 .0. Y tVr>" 0 E N N re E CD w 5. 0 U L z 0 5 re 0 u_ Z O Z J a 5 c FIELD ANALYSES: Date sample collected: 04/20/21 CC 0 LL U' O N 0 0 a E 1- aJ 0 .0 2 a) 0 Z N U .I o a C co c o v 0 0 . a a) VP a 0 0 Q Q c Well Diameter: 2 0) I� 0 Screened Intery Relative M.P. Elevatio a) 5 0 0 N o) c Q E as 0 0 N o ai 10, a (A O Q c a) 0 a) c 0 N ((0 0 ft. above land surface 0 Z 0 0) >- 0 a) a Lm Z 0 Z m W } a) w a a) 0 4) (OJ H (0 E a) E co 0 1- 2 re 0 LL Z re 0 0 CO J 0 M Certification No. PCS Phosphate Co. / Environment 1,Inc (4) 0 u) 0 E a' CO s- Z O 0 00 o J 0 0 c) (0 n: O N J O E .0 .0 .0 E E E Q Q 0 0 0 0 0 a) c N CL C N Z ce 0 c rn rn -en rn --en rn rn m rn rn m'ETD rn rn g E E E E E 7 E 7 3 E 7 3 E Ea 7 'w Q Q Z Z V) 0 (D (ND 0 0 z z co co N co o z N y z z O M CD O a uJ as (0 H `o a 0 O a O O CO 0 0 E a) d N 0 0 0 y0 Q Q 3 > (D W CO so O O CC) N Z O N m U LL co LL ca dW EW ya o O d U Q Q Q Q Q Q Q Q Q Q Z Z Z Z z z z z 0 0 0 CDN 0e7 V (D O D) O O O O o o I- 0 0 0 0 0 0 0 . E E E E m o (a 0 . > > o a d c .0 .V •� 1 O o a m U (aa E c.? ia) U Q 0 m 10 E 0 0 Q U 0 Cc Chrc Z Z O M D) 0 E U a) a) 0 :a 0 CO = Y z N O E y a) c 0) m 2 0) 5 CO (O N 0 a) c (a 0) m 5 c 5 Ni - Nickel 01067 N/A J C J ..... L J 0) E on o) rn CO co 0) g CO o) EEEEEE E ]issolved Solids:Total 70300 830 CO N (O 0) CI 0 0 00 CD 0 0 U O 2 a Chloride 00940 31.0 Arsenic 01002 N/A Grease and Oils 00552 N/A Phenol 32730 N/A Sulfate o0945 149.0 bpecific Conductance 00095 N/A TKN as N 00625 N/A J 0 H c O a J .0 Q a 0 O (A ate) w O d LL a) ca c m a) 0 m 0 0 0 0 0 d E (o 0 a m N a 1- '0 E Z N 0 O Q a N `o 0 o CD J z 0 )r W 0 N W W n -a K a) O •0 7 K X W N w 3F z i i__ c c 0 O z a ai Z c c 0 7 r 0 O O o o Z r p 2 .m N o y w c 0 a a a co a O 0 `y _Z O a) JW r` t` . W E c t Q O m Q ix J O o.z W O ❑i*. ❑❑ J Z= 0 W Q W O ¢ zrc p W II a ceu. d ti 0 z z 12 Z O W oo 2 u. ui 0 I- o 8 DI re E c 1- a m 6a) Z o Oa)Zrs Na I- mLi S• a C 0 d I ❑❑❑❑ W o a >- a z Z I- Z 0 02 CZ G ce >-0 1_ LL cc a/ ILI LLJ Z ZJ Mix a �V ti U co FACILITY INFORMATION PCS Phosphate Co., INC - Aurora Division CO O CO N O (O O M x O () c l N Na) E v CIS < Z w E co a_ u 2 2 0 2 0 ne#: Contact Person: T a J m J CO O c ()J CO } a) E N a) 0 '0 N 3gre0 L FIELD ANALYSES: mple r J U z 03 0 Z Z O cs d U O Z � Q zlz a) c ❑ 0 a) . aai C > E Li.,U aca N in >'PIS CD Q ( z 0 c Z O N ❑ O- O rn � co Ot U } a) E y O)❑ a c a , 0 m 2 ai 4- a) N :c a a) a E a 3 i 3 0 a) ft Z Measuring Point co} W a N O 0 H m 4 30 y LL cc EO co N a0 co Certification No. PCS Phosphate Co. / Environment 1,Inc J 0) E Q Q Z Z N 0 0 0 0 C N N N 0 0 8 0 U c N c 0 0 E O1 E o fn ai N L 0 0 LL 0 0 0 t w .c E E E J J J J J J J J J J J ..... CO a) o) o) o) 0) 'a) a) 0) a) a) 0) co a) a) E E E E E 7 E c c E c c E E 7 0 tl! Z c N O (O co z Z ca 0 u (� 12 V O N R Z co O v a a a > J O J O E o '• CD .c N 0, co <CD 4 N 16 Z Z N N (O o Lu CO co 13 O in o 0 Ts TZ O 0 U LL COCD LL a) ill aW w 2 CD (1 0 U /100mL Phosphorus: Total as P 00665 Q Q Q Q a a Q a Q a a Z N 0 a) a7 L a co 0 L a 0 0 Z 0 E E 4 4 Z r- O E (a m a) m Z a) E 0 0 U a) U Z r- 0 Z Z Z 0 0 0 Chromium: Total o Z T Z co 0 Y z Z N E= E E c E E o. E E Dissolved Solids:Total 7030o 590 pH (Lab) 00403 7.0 TOC 00680 5.6 Chloride 00940 49.0 Arsenic o1002 N/A GI Phenol 32730 N/A Sulfate 00945 75.3 (Ammonia Nitrogen; NH;as N; Ammonia Nitrogen, Total) z r6 O E U Z 0 U 0 m J Z (0 U a) LL 0 -0 0 N 0 N 0 CU 0 N N 1/4 0 0 0 c 0 o c N a r a C a) n o Z N N 03 0 a 0 v > m .y a Z 0 CC W 0- SUBMIT FORM ON YELLO 0 0 W of 3 O z a D 5 2 N jrs O. N a d z Q z = O S 2 0 c z W V W 0 er: W10700012 Expiration Date PERMIT Num a 2 0 2 re H O fx ry� Q 0- V W 111 U Z oa Og 0 0 0 FACILITY INFORMATION 0 5 L Non -Discharge 0 0 m W a z 0 0 m O 0 z O 0 N is Q 0 L d U a o a) E E z z lL d aa) To O rn c -o in O - ICJ E. rei O O v= f- o Z ip 0 o o 2 2 '., '� a Z a Q .. W c t m IX 12 CD CD -J O O ❑ 0 ❑ ❑ a7- W 0- 0 m 0 cu o d 1— U 00 w oo VG W co LL a o m m `1) O 3 cn a } ❑ ❑ ❑ ❑ 1- Aurora, NC 0 O (0 0 M 2 O Facility Address: 0 00 N 0 F w c w o 0 N Telephone#: (252)-322-8283 Danny Winstead Contact Person: co No. of wells to be sampl Tank Farm Remediation Well Location/Site Name: a _ m ,_ J O O — !Z <} E E aoi FIELD ANALYSES: Date sample collected: 04/20/21 Z O E o Q {f O W Z — o L Z 0 a a -cc UJ ❑ U N CV 0 0 0 a E 1- 0 pH 00400: 6.8 units Spec. Cond. 00094: 862 a= (0 a O m 0 Z Well Diameter: 4 in. Screened Interval: 31.0 ft. Relative M.P. Elevation: N/A Depth to Water Level 82546 ft. above land surface Measuring Point is 0)) U 0 z W } 10 0 O V Z O cc LL Z re PCS Phosphate Co. / Environment 1,Inc N 0 U 0 U 0 as N 0 E 0 0 a U E a) o CL II 2 ID o L O li re O o CO Z CO 11 ' 2 U Q ik w a 0_ } s El U^ r a) 0 E A N 0 Z 0 m U IY 0 N J O t t t E E E E E E E E o E 7 o lib m o E E z o W Z O 1D E� 0 z z o c N 0 f.) O -0 CO C CD O Z 0 c )p 0 0p H E E 0d N i F H 0 N o d Q N Ws Z N > Lc) 0 F- 0 NZO Z 0 c 0, CD W aW 02 (0 Na Nitrate (NO3) as N oos2o N/A Phosphorus: Total as P oosss 0.147 Z 0 E m m m Z m CD E 0 a) U co U Z 0 Cd - Cadmium o Z Z 0 0 Chromium: Total o Z Lo 0 0 0 � C a O O_ - o U a) Z Z o 0 0) r o N O 2 = Y J J N 0 o J 0— s 0 o rn •E rn rn a, co a, rng o) E = E E 7 E 7 E Y E )issolved Solids:Total 70300 551 O n m 0 0 d 0_ TOC 00680 5.4 Chloride 0094o 47.0 Arsenic o1002 N/A Grease and Oils o0552 N/A Phenol 32730 N/A Sulfate oo945 48.3 Specific Conductance moss N/A 0 v 0 0 y a) co C rn m gen; NH, as N; Ammonia Nitrogen, Total) z o 0 Y z 'z -J E TKN as N 00625 N/A Z U O c 0 W J Z N U 0 H m LL a, 0) c 0 0) 0 U 0 a) 0 N a 0 0) a d 0 c J z 0 re w 0- 0 W z 0 2 0 LL H CO CO CO W a! Oeic 0 re r Q 0 z � Z � SS w w Q a 8 N a z z F O 0 z LL z0 Z z W w 0 w 0 LU W y 0 Z OC 0 H Z ce I- O a a. e Z 0a 02 re 0 00 0 0 o U %a 0 a W N 0 O 0 1- O a E z H w a ✓'+ease Print Ctea FACILITY INFORMATION Non -Discharge PCS Phosphate Co., INC - Aurora Division Facility Name: 0 0 O •E 0 O 0 0 .� z m o `a) 0 m it ce J O O ❑ .J ❑ ❑ w 0. 0 0 W w 0. LL 0 0 0 a a z - 0 co N Aurora, NC 0 .0 c I� 0 0 CD IX ❑ ❑ ❑ ❑ t w as m 0 0 0 0 o co U z r if 0 20 O M y 0 o L o 0 O 0 co a) v z < E auca 0 0 CO 00 O 0) N w O O. 0 Danny Winstead Contact Person: Water Source Heat Pum Tank Farm Remediation Well Location/Site Name: o) I J co ' w a) E _g0 `1 a� 16L a) •- E N U L z 0 re O LL z 0 z J a co FIELD ANALYSES: Date sample collected: 04/20/21 U r O 0 0 Q E H .y 0 0 L 2 O CO 0 0 0 01 0 o c.-,usC 0 m c o oo U o ES a) o O U O Q n 00. 0 Q a z (0 �I Cal c Well Diameter: 4 a) O Z o a= w aE 0la sri z E c 0 w o Wa) m J 2 a) m z 0 op-0 J _00 W 0 o- 0 ft. above land surface m N N N O 0- (7) c vJ m a) d U 0 0 0 0) o) c Q E a) N 4- a) a ca a) O. O z ❑ co i 0= U 0 a LL Z z co w } a) 0 a�O.r 0 0 a)0 0 H ce CO) IJ- 0 z E 1•I ) 0 at Certification No. PCS Phosphate Co. / Environment 1,Inc 0 0 N ao 0 0 a N (0 a) H U) 7 o L n d) 0 L 0- -J E O O N D 0 0 0 U 0 c a) N c 0 0 a -• O E 0 N V 0 m •v_ 0 O L_ 0 LL U J a 2 co- U 0 0 7) Z 0 # # 4k c) a -o a a >- .0 .0 .0 L ❑ E E E E Lab Report Attached? co m 0 0 Z 0 0 0 -J c E >' E 3? E>> E E? 3 Z 40 0 ar) a) L n 0 0 L a 0 0 7issolved Solids:Total 70300 3000 Z O E 7 m m m Z O) 0 0 E 7 0 as U as 0 Z Z 0 CO Cd - Cadmium 0 Chromium: Total 0 Z Z CS! LO O 0 Z Z 0 0) 00) r o U 7 N N N 2 0 a = Y Z Z tO CT) 0 0 0 E 0 CCO C O 2 g rn c Z o a) U_ z Z co o J ca J J J J ,J J L J J co E 0 E E m E m E g E E 0 H g m 0 5 z 0 .4: 0 Q Q Q Q Q Q co v v z Z z N- z z. co O O N N O )!1 N 0 y O COac2. CO ZIT, 0 O In M 0 O) ry 0 0 0 0 0 M 0 0 0 z 0 a) U M a) c0 c g 0 O 0 'c m m 0 O c c a v a 0 a v) r E c. o To Ho a hl )h 51 si TKN as N 00625 N/A J w 4) 0 as c a) T2 a) c a) 0 0 0 0 a. E m m O a 4) a m a N N n z N O < 0 a N o w CD 0 a J Z 0 re W a a 0 } Z 0 2 O LL m m xpiration Date PERMIT Number: W10700012 CILITY INFORMATION Non -Discharge PCS Phosphate Co., INC - Aurora Division Facility Name: L 0 W 0 a Z co co N rr.. OO co o 0 2 Permit Name (if different): Facility Address: 15: a) m co 0 Z 2 L 1530 Hwy 306 S N Telephone#: (252)-322-8283 Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Name: a E XJ - R O 0 ��� y } N E N `) z O 2 0 LL z 0 Z J a 2 FIELD ANALYSES: Date sample collected: N/A U Z 0 0 a E a 0z C = T I 00 O z v 6 0co v U 0 0 0 N 0 0. co O c Well Diameter: 4 N C09 0 R C ft. above land surface 0 0 Measuring Point is 8 co a) a a Z O Z Q 0) Z i o) ❑ C Tr. N m c o z N a) a) O a 0a v m 2 E 0 LL o. �z a1 ▪ Ere O w • 0 CD 0) E • E Qm o co > cc) PCS Phosphate Co. / Environment 1,Inc z Pb - Lead o1051 N 0) 0 0 0 c N N Other (Specify Compounds and Concentration Units): a' a S. z g u • - V # J it w a = a >13 - ❑ _ 2 U 0 U E L v5a y a 0 s 0 Z y O ▪ w • U O • W J > • 4 O 0 0 L L L E E E J J J J ........ J J �0) m0)0) 0) u) -811 "a) -Eh -En E E E E E= E 0 3 E= 0 E E aa, 3 7 y Z Z O o O O Z C Z z o ° R c as -8 0N M o n O O -0 gip? Z 03 o a) O - 0 2 a R 0 0 Z Z CN0 0 0 • 0 a a) CO ly6 C R o Hc Ul 0 2 L o a T 0 L a Z 0 E E Q Z 0 O E R m co. m Z O T E 0 co U co U Z N 0 Cd - Cadmium o Z Z Z 0 V 0 0 0 Chromium: Total o 0 0 a O a — O U LL U Z N T 0 a) as 0) Z c0 0 Y 0 Z 2 J v) J 6 J J J J J J 2 J J O O) 'C -Enm 0 a) 0) 2 coQ - E= E E= E= E. E E Z m 0 co .0 2 a Z Z 0 0 ID Of 00 U Q) O0 `0 U 0 O O 0 .c d N M 0 0 C a) a N 0) 0 a; CO in 0) 0 8 C R 0 v 0 O 0 0 w 0 a) a LI] TKN as N 00625 N/A z v7 U 0 0 0 F c W -J C 0 E cc dLL O a) c a ca 0. 1- h O a o T U E U) APER ONL SUBMIT FORM ON YELLO W D O W m re d) 0e u- a oz j � n r y W ct to U N aD s 0 J z z O 0 0 u. z — z W W LL 0 O w I- 0 W � z w Clin r- n 0 o 0 X w N 0 O 0 0 E z H 5 re W a 0 c 0. m N_Z R 0 re 1- 0 re �W re IJJ Z Q Z a 0 re (U 7 FACILITY INFORMATION Non -Discharge O •0 0 2I 0 0 Z 0 0 0 L o. L a O 0 a Facility Name: 0 0 w 0 a z O O 0 N Aurora, NC 0 0) 0 0 0 1 O i. as a) 'O fd 0) 2. a 0 Q Z E 3 a (i 0 (0 0) 0 0 O 0 0 0 0 Z 1530 Hwy 306 South N U Telephone#: (252)-322-8283 Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Name: J c 0„" O — _seJ } d E N N z 0 Q 2 cc O LL z 0 Z J 0. 5 FIELD ANALYSES: Date sample collected: N/A 0 m 0 Z 0 003 a E Z c 0) 0 0 a 0 Z 0 v U o Li 0 0. cn Well Diameter: 4 co 8 o 0 ES 0 (0 `o 0. 0 a¢ Z ci O Screened Interval: 36.42 ft. Relative M.P. Elevation: 9.95 0 Q 0 N as 0 .0 dEcp. 1a 0) z a ili LO E v w W W N CO J 2 r Z 0 m o J 0 .c w N 0. o ft. above land surface a0 0 Measuring Point is 0 Z co w } w 0 (0 z O a 5 CC O LL Z 0 H 0 Certification No. PCS Phosphate Co. / Environment 1,Inc 0 0 'O co J Q 0. 0) 0 0 U N N Other (Specify Compounds and Concentration Units): Lab Report Attached? 0 0 0 0 L L L L EEEE15 E E E E E 0 E -a, 0 E 0= E E= a 0) Z N aj O i+ O Z o c N o c0i ca J C a) c A •0 O W 0 d s_ .0 O N N 7 Q To Z Q > Z O o N. Z 0 (0 0 c ni n s O: N E (On 2 0O. Z CO0 0 0 (0 0 Z a) Z O O Z 0 0 w (0 (0 H 0 0 0 0- co O Z N O .0)) (0 L 0. 0 0 0 O 0 Z 0 O .co co (0 0 Z 0 O ) E 'U (0 0 (0 0 ZZZZZZ O O 8 8 00) OM) O 0 0 I,-0 Ts „ c Z E 0 0. 2_ ` � 0 0) 0 E U (i 2 m 0 0 E 0 = a _cY Cd - Cadmium o Z r- 0) 0 E O as 0) 0) 2 z O 0 0 0 z 2 0 J (p J ..... t J J O1 •C co 0) m 0) p) O) 0) O) E 0 E E 0 E z E. E E 0 m 3 Q L < Z s z 0 0 0 o O M N. r E .(0 Fo- d H g; E c w z N O 0 N Z 0 O O d 0. Z m 0 0 0 Z Z CO 0 0 0 0 0 N 0 M O d a Z v 0 O 0)) (o 0 Z m 0 0 0 C as a C O 0 0 0 0) La 0 r m Q m a E z 0 0 co •c O E ¢o Tij E H 0 0 Z (0 H Z 0 0 (0 1- c 0 W J z 0 0 (0 0 H a) c 3 0 a C 0 N N cO 0 0 0) E re 5- LL m O (0 c (0 2 (0 0) C 0) C 0 0 0 0_ @I (or Authorized Agent) J Z 0 w W CC a Q W r Z 0 0 u_ 03 m m W K Q ti c a a 0Z z U ) N J w 7 o0. a Z Z O a w z 0 e > z z z II- 0 O w F 0 w > -2 w y 0. a 00 r- r• co 0) 0 0 U r: W 10700012 Exp PERMIT Num ti 0, 6 a z_N 0 1- z et H 0 rL a . cp a imUJ z u-I Oa za. H c.i �pJ_ Q 00 LL Non -Discharge PCS Phosphate Co., INC - Aurora Division Facility Name: 0 O ijEnDD z' N To 0 0 o H c Z o 0 0 , 0 f0 Z o 0 m ce re O ❑ 0 0) a 0n 0 c 0 0 Q 0Q Q •• 17 C L_ ru OEl El a 0 0 0co Permit Name (if different): co co n Aurora, NC w 0 CO CO 1 O 0 0 a :0 LL O 0 m m C O 0 CO 0 Z y O M o x 0 CO CO M a � E M a) 13 0 N O L a) Z Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Name: a J W O •c Y 7 Q CeE m L N FIELD ANALYSES: U pH 00400: 6.6 units Temp. 00010: 27.6 Spec. Cond. 00094: 4737 µMhos c '7 aD N E as 0 )) 6'ci6.4 o a) 0 Z N 0 0 0 0 `o 0 ft. above land surface (O In n N N co a) 0 • a) c a Cr) 0 L 0 2 ID 0 Occ (n w cc) } O ❑ y dw c 0 _CI N N0 N 0 0 N 0- 3 E 0. A N 3 0 0 a) 0 E >0 Z 0 re O LL Z re O O m 0 M Certification No. PCS Phosphate Co. / Environment 1,Inc 7 N 0 a co J L a 0) O 0 C N N (0 a a a a >- t t t 000t E E E E J ..... J J -J J E E E E E 7 E c o E c c E E 0 Q n) Z O N a) a+ t0 0 a) ZcZ cn O c 0f 0`o c) 9 Z J C•) 'z 0 c OS '0 0 0) a) a 7 0 L 0) 0 Q > W laj I0 O ro N, Z 0 m c m N W 0- W 02 a) 0a 04/20/21 to 05/11/21 Q Z 0 0 0 Nitrate (NO3) as N a co l0 0 LL LL 0 0 0 Phosphorus: Total as P 00665 23.600 Q 10 l0 H E 0 0 0 Q Q Q Q Q Q Q Q Z 0 0 a) N L a co 0 L 0. 0 L 0 (Note: Use MPN method for highly turbid samples) Z 0 E .c m N m Z m E 3 •0 m U N U Z 0 Z 0 Z Z Z 0 0 0 Cd - Cadmium 0 Chromium: Total 0 0 0 J J J J J J L J •C 0) 0) a, CO 0) 2 01 E 7 E E 0 E 0 E . E Dissolved Solids:Total 70300 2900 pH (Lab) 00403 6.6 TOC oosso 4.3 O 13 13 13 Q Z 0 0 O 0 0 O 0 0 g 0 .0 U a) ¢ Q 8 N O a c N as as m 0 a o co n m 0 C a 0. CD 8 0 w Q 0 as ) a c 0 U 0 0 a) 0_ Z 0 0 Y 0 Z Z -J 0) E r TKN as N 00625 N/A VOC Removal% N/A 0) E J 0) E Influent Total VOCs: N/A For Remediation Systems Only (Attach Lab Reports): i5i1ffirlEiMogaaR envItvalla IR-certified laborator . I am aware th N km o 0 a Q z 0 cc w a Q SUBMIT FORM ON YELLO 0 m 3 c 0 O z a 2 rno) wU Q O ace J z S 0 w zrc g Z W W W u. 0 W F 0 ti d U m Z re o 1- Z �u- re Ca 0- re W � QZ Q D 0 OC O 0U FACILITY INFORMATION Non -Discharge PCS Phosphate Co., INC - Aurora Division ai E cc Z :0 c0 w r:ii a o)� cow co O _1 co Q CI O. DODO z (O 0 n N 0 z m 0 Q 0 CO O 0 M 2 O iri N a a > :0 co w 0 0 0o c c 0 0 0 0 coo N 0 Z P F 0 0 2 o co Telephone#: (252)-322-8283 Danny Winstead Contact Person: No. of wells to be sampled: Tank Farm Remediation Well Location/Site Name: a J N O C _seW N E y d FIELD ANALYSES: Date sample collected: N/A Well Diameter: 4 E �Iza 0 o Q O W z c z .c zo n a...10 v)3 U 0 a z 0 0 Q z 0 c0 0 U 0 N CO c Nr P- .- 0 0 m 0) N c N N N 0 Z c 0 n 0) c co) 0{ a) E 0 .0 Depth to Water Level 82546: N/A Relative M.P. Elevation: ft. above land surface co Lo N c 0 d 0) 3 0No (1) 2 z O z m w } Field acidifi Z } c Q y E as c O .0 N N N .0 CO) a m 0. N E a m a)d E 3 0 0 N oN) E E 17) co 0 0 co Certification No. PCS Phosphate Co. / Environment t,lnc z 0 0 a J0) Q 0) 0 0 0 N c N Other (Specify Compounds and Concentration Units): E E E E E n E E 3 13) E E>> Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q flj Z c aj .2 0 Z0 �'z C O c N o c)0 co Rz J O ) u Z a c m d N N O) E 0 N 3 0 0) z Q mz Q Q .. M z c, W O0 N Z 0 Z 0 co U CZ m re N W ~ E 02 CO N Joa z 0 0 N N N H 2 0 a 0 a E E o o O o A Q z to 0 To 0 li LL 2 E 0 O U Z 0 0 u: l0 L a N 0 0 O r 0 Z 0 0 E 7 •E Q Q Z 0 0 E 7 m m m Z 0) 0 E 7 U W U m 0 Z 0 Cd - Cadmium o Z 0 Chromium: Total o Z Z v 0 g 0 0 � c O O_ U )i 0 0 Z Z 0) o 0 0 E a) 7 N N C 0) 2 g co c t E E E E 7 Ec. E m TL E E .13 0 Q Q z z z o w o M f0+ to E to a I- LL o c z N O > U 0 N N Q z 0 O O d 2 a Q z o co co 0 Q z v 0 4) a 0 Q 0 O 0 c N Q Q N 0 0 0 a c ns o) N CO N 0 Q M CN) 0 a Q C 0 O .N. m U Q Z o 0 Y U_ z •z TKN as N 00625 N/A 0. cu l0 -J 0 ii 0 co) J Z 0 re w IL 0 0 w } z 0 0 1 H co m w us ❑ c 0 4(73 X w N_ O O O O_ 1• V 3 Z a W a FACILITY INFORMATION o O Non -Discharge PCS Phosphate Co., INC - Aurora Division co w a z TYPE OF PERMITTED OPERATION BEING MONITORED CO CO N. Aurora, NC w 00 CO CO CO 2 0 LO a) 0 a) o E E a) 0 Z z ld 0) ca Q U a) LL 0) 0 0 0) •0 o o c c O R O O U Q E E C t 0❑ Ii ❑ ❑ Q 1 N 0 c 11 ❑ 01 O coa) i0 ❑❑❑❑ O N c 0 O U CO CO N 0 z (9 1530 Hwy 306 S Telephone#: (252)-322-8283 Danny Winstead Contact Person: urce Heat Pu m a) a) 0. E 0) a) 0 y 3 O 0 z Tank Farm Remediation Well Location/Site Na J ai c J Ca O _ Y 0 — 00) 0 L Z _O 2 re 0 a O Z J a co FIELD ANALYSES: O N 0 o U a) U a) 0. E as a) a) c Well Diameter: 4 E 2 W cc w CO 2 Z ❑ 0 J 0 TD 0 z (00 d 0 O C o m 0 c0 0. O Q Q Z (1; ft. below measuring point Relative M.P. Elevation: ft. above land surface CV Q) N Measuring Point is 0 0 w } ❑ w U CO 0 LL z 0 z PCS Phosphate Co. / Environment 1,Inc J z 0 0 CO J Q. Zn - Zinc 01092 N/A co O 8 0 U a 0 l6 0 c 0. — 0 C) 0 N V eL II d 0 _co Ou. re a o Z m g❑ 2 U a = a ❑ U O 0 E a e a V w O a 0 0) f O n 0, U 0 0 0 0 L L L 0 a) a) E E E O co re U 7 J J J J== J—I_ - J-J - J J E E E E E a E a a E a 7) E E 7i15) a W VJ Z c aj O m E . 0 co s- Z . Z a) 0 c 08 N z co J c N cOi •0 c a) d � J O J O N O E d 0 (0 o 3 < < N m z z N0 O 0 CO f0 O O T.) NZO N (0 LL c Ix u, LL a) W E W E m?3 U J0a TORY INFORMATION Nitrate (NO3) as N 00620 N/A /100mL Phosphorus: Total as P 00665 24.400 Z 0 0 l0 L 0. 0 0 L 0 O O Z o_ 0 E 0 E Z 0 0 E as m Z m E 'U 0 U as U Z 0 Z 0 Z Z 0 0 Cd - Cadmium 0 Chromium: Total o 0 0 `m 0. O 0. 0 )i 0 Z Z 0 000) 0) Is. 0 U N y 0 0 = Y Z 0 O U0 _ z Z J y J J J J J J 2 J ` E 0 E E= E= E E E )issolved Solids:Total 70300 1600 pH (Lab) 00403 6.5 TOC moo 8.2 Chloride 00940 54.0 Arsenic 01002 N/A Grease and Oils 00552 N/A Phenol 32730 N/A Sulfate 00945 536.0 Specific Conductance 00095 N/A 0 F 0 m C as O Z N co o O z � c c m O o EZ E E Ho TKN as N 00625 N/A O) E 0. co .0 co t U a a, c O y Y y c O A v d re LL 0) O) 0 co 2 0 a) a) 0 c O 0 0 a E f0 APER ONL 0 SUBMIT FORM ON YEL CO 0 w ae 1/1 u. • a Oz ti c • r w w agD a d z zo f 2 �o^ z z W w O w Z U z a w 0 0 w 17 MAIL SE Z 0 H z o ce H O Satre V a. w. a/ LLI Z oa 02 re 0 00 (0 0 o 0.13 _ 0 X w 0 0 is E ▪ a) 3 co Z co 2 0 a z F' 0 0 0 U a FACILITY INFORMATION o., INC - Aurora Divisi d (0 a 0 L a U a E as Z co u_ u_ 0 ca w 0 a z 0 W re 0 1- z 0 0 z W z 0 w a 0 0 W 1- H g W a LL 0 uJ a 1- Aurora, NC w O N o co 0 0) a) 0 a) E as 0 a Facility Address: 0 N 0 0) '0 O .0 c c E 0 .� O a E E c .0 0 E a (0 • 8 a) uJ � LL 0 • (0 (0 N 0) is 5 DEED O :a op : a N 0 z 1530 Hwy 306 South (252)-322-8283 0 O L a a) H Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Na _ oI 0 `.5c x uJ J v) } m E m 4=7CI Iro E w U_o X z 0 Q Q: 0 LL z 0 z J a 2 FIELD ANALYSES: Q z N O a) 0 4) a E (0 0 a) a) 0 0 a O a' w z 0 J J L a a) 0 U co _ o Z 2 0 a E 1- co Z a • O O < O Z c O O O CD cr c Well Diameter: U a) a m O 0 Screened Interval: 36.58 ft. Relative M.P. Elevation: 9.95 ft. below measuring point o Q MIZ W co N N N CO 0 L a CD O ft. above land surface (0 N Measuring Point is I0 0 as 0 u0) _ c m Z O 51 (0 o) 0 z m L a a) :( 0 0 O 0 z 0 Q 2 0 LL z 0 0 J PCS Phosphate Co. / Environment 1,Inc -J rn • E a Z z - N 0 0 0 0 (0 0 N .0 3 Other (Specify Compounds and Concentration Units): J a 2 vi 0 U .0 N 0 z Q re 0 re a re z• ° g . x r. U H0 Q Xt ❑ 0 L 0) E a 0 (0 O) 0. N Lab Report Attached? 0 0 L 0) E n m 0 0 a 0 L 0 E 0 0 L 0 E a 0 L 0 E E • E EEE7 E 7 z E o z E E 7 7 a a Q Q Q Q Q a a a a a a a a vi Z c of O (o E .— Oo z . z O c .O-. z J G • Lc 72.5 z 0 c co 0 co Loth 0) E 0) d 11 3 0 .0 W 0) 0) Q To Z Q > co z H o TZ0 (0 U c (/) a) W 0 aw 02 o g 0a. z 0 0 0 z N CC 0 z (0 Z -J E co) O z co 0- 0 N 3 `o L a (0 0 L a J E O (7 Z N 0 0 (0 L a 0 0 0. 0 0 J 0) E Q Z O O E (0 0 m c Q Z 0) 0 E 7 0 (0 U (0 0 Z 0 Z M O Z Z 0 0 Cd - Cadmium o Chromium: Total o O a) a a 0 U 0 O c O a) u_ Z Z 000) 0)) N. E0 U '0 M N 00 0 rn a° = Y Z 0 0 0 Z 'z N ..... t = J EEEEOE E Q Q Q Q Q Q Q 0 O W Q 0o • m 0 z asE c m O o EZ f0 • E F0- 0 0 O .0 a) 2 a Z 0 CO 0 U 0 Z c co 0 U 0 0 0 0 O 0 Q N O 0 0 c a) a) 0 a) d 0 00) M O c 0) L a N 0) 0 0 w 0) 0 0 c as 7 0 0 U 0 M Q Z TKN as N 00625 N/A Q Z co O E 0 0 >> a CC L. 0. 0) 0) m c m 2 a) c a) 0 0 0 0 0 E (0 0 0 a (0 0 0 N d a 0 (Ca m E z w co 0 5 0 U a Rev. 05-02-2017 0) 0) z 0 w a O >- z 0 2 0 LL H 2 m co y 4 E as Y U m LL CO 0 O N O 0 0 O 0 Z 2 N a COo a a) co 0. E N N a 0 m To 0 0 z Z 0 Q re 0 LL z 0 z J a 2 z a) a) 0 N 0 a) 0 E 0a N a) 0 z 0 0 0. E H co 0 w Z c c `Cr if " N N E W 2 Z 0 0- J CI I O z 0 W } a) U a) a a) 11J z m ❑ O_ y E cco y O C 0 m a a a) a 0 _a0 p2 a) m n E co) a CO O d E O a) a) E E > as z O H ce 0 LL z_ } Q O g -J E 4 .0 s .0 E E E a a Z z 0 0 0 0 0 o 13 0c N J J ..... -1 J J E E E E E= E ifo -a, 3 E co -a, 7 E E -a, a ui C Z 0 a) ip 8 a3 *- Z C Z ca 0 CO O o -. N o O adz 0 C.)Z 0 c to d o W � E N a 0 L N N ;¢ > O Q t� 4. H o O >. z 0 CO C.) c CO ce CL EW N 0 oa Z Z Ol W CO 0 0 CO a) a3 in a) 0 0 .0 Z y O L a J J E E o o o o Z co To 0 t LL 2 E 0 0 U Z 0 O E C E a a TO E To o co CO Z O O E 7 • m Z O 0 E 7 0 a) 0 co 0 co co 0 Z 0 Z O Z O Z W 0 0 0 0 0 N- U rn csc cn 73 CO 0 Ca as 0 0 co ch 0 co co 0 an co co To uJ 0 o. co 42 0 ce u. 1/24 co co 0 0 0 (0 o. o. ca Rev. 05-02-2017 SUBMIT FORM ON YELLOW PAPER ONL 0 0i W K � 111 3 0 0 z a > r. Z� n W N as z J z = 2 O f J 0 0 z Z z o W Z 0 w 2 la CL en n_ J a 2 ru 0 n m 0 O 0 a x O O O O a E z f. 2 w a. FACILITY INFORMATION X U 5 t Non -Discharge PCS Phosphate Co., INC - Aurora Division O co W ❑ a Z 0 a) r6 0 0) c a 0 o 2 CZ m CO 0 c c _ o Z lei O 0 o .0 Z 0 a) Q .. w 13 CT) E E C 2 co CZ CZ CO O O ❑ 1 1 ❑ ❑ QH W E a a O m 0 LLJ o 2 1- a 0 a y N 0 X ii ❑ CO O. 0 co co rn 11.1 0. ❑ ❑ ❑ ❑ O 0 O n 0 z 0 0 7 O CO CO O 0 0 c 0 O U CO 0 N 0 Z 0 Telephone#: (252)-322-8283 Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Name: :LE _6 O 'c Ix _1[ FIELD ANALYSES: Date sample collected: N/A N 0) za O ; v E Q I W M IX 8 Om J z a) m Oz.c� Z ❑ acu o O.—I0 • — Q wJ a) y rn��❑ U M 0 O E H cn Z c v 0 I 0 Q o Z O a U 0 O a) a to Well Diameter: Screened Interval: o c o o a a 0 Q Q Relative M.P. Elevation: ft. above land surface Measuring Point is O Z 0) w } 0 a3 a co Z c 0 ISI (73 o) 0 0 Q to Z } 6 ❑ c d E $3 E 0 a) a m .0• 0 a 0. 7 O. B a) 0 3 E (1) E > f/) z 0 0 LL Z 0 m J Certification No. PCS Phosphate Co. / Environment 1,Inc Other (Specify Compounds and Concentration Units): ik 4k it ik a)In 0 0 0 0 >- .c .c .c .c 0 E E E E Lab Report Attached? 0 U O E E E E E 7 E o c E o c E E 7 m Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q W Z c N .2 m E +' o Z Z to co O c N oo u O Z C .O z a R a a) J J o O O 0 ea co W a g 3 E O w L o Z 0 CO O Nitrate (NO3) as N z )0 as as L n cn L O. O L 0 z O 0 E c c Q Z O E m m z O) E oe 0 co 0 Z O z M z za z 00) 0 0 0 0 n E To c .7 O r1 2 0 E I—o d 7 7 E 03 U V o U 1 0 z 0) co N as a0 z co 0 E M a) c 0) N rn z co O YY Z Z rn M+ L J E g E E D E D E g E E Q Q Z 0 0 0 a a Q Z 0 0 Q 0 U a 0 O 0 Q 0 0 O 0 C N Q Q z N N y O co a) N d 0 Q O 0 a) a Q V 0 O y Q TKN as N 00625 N/A Influent Total VOCs: N/A 0 E LL a) O) as l6 2 r(0 a) c a) 0 c 0 c 0 n. E R e( O SUBMIT FORM ON YELLOW PAPER ONLY Phone: 919-807-306 o Z O H Z o re H U. aCe Cara ww LIJ Z CI 4t ZCL O (9 U a) a) 0 o 0 a) D L_ •X 0 w N_ O O 0 E °1 01 Z t I-y co 2 0 LU w 0 a lazz TYPE OF PERMITTED OPERATION BEING MONITORED a' N a 0 v 0 7 'S U) O C 0 O C c m O O V 'd as a 0 N a .. c L ❑ CI ❑ ❑ a CD C L- 0 al CO fn DODO Rotary Distributor Water Source Hea Please Print Clearly or Type FACILITY INF PCS Phosphate Co., INC - Aurora Division Facility Name: Permit Name (if different): Aurora, NC 00 V) CO O Facility Address: U Z Er 2 1530 Hwy 306 S N Telephone#: (252)-322-8283 Danny Winstead No. of wells to be sampled: Tank Farm Remediation a J m J co p = u1.1 N i N E y N X FIELD ANALYSES: Date sample collected: N/A Oa E C EQas ci 2 Less) Z N :: 0 w J 0 m . O C z 2 a) o a c z 0 a. o c 0 J a) d J 0 s 7 c 2 -I a) i 0 0 co owm U w 0 a� 0 0 a E Z 7 l 00 a z o U O (-5 I 0- a U) ft. below measuring point ft. above land surface a E LC) d Z O z U) w } U V Q U) Z e) ❑ a N N C o Q ate) N 473 .0 0 a � a) 0- 3 E a m 3 E 0 a) a) E E c7) co 0) Z 0 cQ G 0 LL z CC 0 0 J 0 Certification No. PCS Phosphate Co. / Environment 1,Inc a9 C N O .173 r Z� c o 0 �o J 0 0 crl 0 0 0 N N a) 4. 0 a1 a) 7 Q > Z O 0 N Z O k.co0 CIS a)w aH E la N g.O. oa Other (Specify Compounds and Concentration Units): a o m ❑ J' Q S i Q cri 2 a ❑ 0 0 0 E w Ur L R a 0 r 0 Z y 0 0 dfla O U) Z 10 0 d cc 0 > J Z vi 0 O a� rn rn rn rn as -a, rn -a, -a, -8) 0) -6) Its -a, -a, E_ E E E E E 7 E 7 7 E 7 7 E E 7 7 w v' 0 co O 0 z m 0 -74 a) Z Nitrate (NO3) as N Z Z Z Z coco 10D O 0 O O o r 0 0 a w E E N N 7 7 CO a C a3 0 0 7 m a Q 0 iri o ( m o O 7 g Q s a 0 0 cn J J O O 0) O O E z Coliform: MF Fecal 31616 Z M 0 0 H 0 0 0 (Note: Use MPN method for highly turbid samples) Z co' 0 E 'C) co 0 0 0 Z Z Z Z Z 0 0 0 0 L L L L EEEE Z Z Z Z 1. V N lD 0 I- n CD n 0 0 0 0 0 0) 0) 0 0 0 0 1, 0 0 O 0 OC O. O` 7 7 7 N N U a - U ii g CO> 0) z o m 0 0 = a 2 2 z 01 c Cd - Cadmium 0 Chromium: Total o co J y --o) 0) 0) m 2 O) 0) E 7 E E 7 E 3 E. E E Z Z Z 0 0 0 N. 0 O To to 0 F- I- fA = ,v_ fl. O U) N 0 N n Z Chloride 00940 Z Z Z Z Z O O N CO 0 0 0 O O M O O U N) 0 O+ m a) N " a7 Q C d 7 co u0 c a) 0 y 0 0 I.Uti_ U a) a 0) TKN as N 00625 N/A J Z N 0 O 0 c 0 0. Q.' a J a 0 rn 0 CO cc a- LL a) N C m 2 a) 0 0 0 0 0. E .co n `D c v m a r H c to 0 E c 0) a w N O 'c. N°' E d Rev. 05-02-2017 SUBMIT FORM ON YELLOW PAPER ONL w 0 m • co a 3 c U. ~ oz j n Z N wco N▪ A a a J Z ZO w O g LL aC z Z z w w LL 0 O w 1- 2 n xpiration Date: PERMIT Number: W10700012 0 a h NZ_ a LL o Q F_ Z r2re r LL G O reW I— Ill Z 0 00 FACILITY INFORMATION U D Non -Discharge PCS Phosphate Co., INC - Aurora Division a] O 0 n Aurora, NC w O co co 1 o c d a • N O a) d E W Q E '0 aui N 00 C 0 0 U 0 CO 0 Z 0 1530 Hwy 306 South N Telephone#: (252)-322-8283 Danny Winstead Contact Person: co N 0. co a) .0 O O O O Z Tank Farm Remediation m Well Location/Site E c IX J - ap o 'Q Y a) E NN z 0 0 LL Z z J a co FIELD ANALYSES: Date sample collected: N/A U Z 0 00E' a E 1- w 7 0 0 2 0. c Well Diameter: 4 Z 0 0 0 c m 10 U c C) 0• 0 c/a) O c 0 o. c O co a) E N n Relative M.P. Elevation: ft. above land surface M Measuring Point is c N as a) a Q z 0 z co W } PCS Phosphate Co. / Environment 1,Inc J Ta Z 0 0 a as J L 0) 0 0 0 N c N Other (Specify Compounds and Concentration Units): la 0 00 0 0 s s s . E E E E J J - J E E E E E 7 E 7 3 E 3 7 E E Q Q Q Q Q Q Q Q Q Q Q Q a Q a y z z O `0 m :0 EU R O 0 (a z C Z z 0 0 m f0 s a 0 0 s 0 O 0 J O 0 0 O 0 E ca m m m 0 O E 0 To 0 <a U z 0 Cd - Cadmium o z 0 00 m O O 0 Z Z O 7-01 .Nu _cE EEa E m Ea. E E E e Q t Q Z . z 0w0 - 0 m E �o Z N� E o co w ? N O U (0 O Q Z 0 0 0 2 0. Z O U 0 Z 0) 0 0 a) `O s 0 Q 0 O 0 0 a) Q Q Q co O a) s a Q R 0 0 w Q TKN as N oos25 N/A C Removal% N/A -J U 0 O 7 W J Z U 0 m m SUBMIT FORM ON YELLO W 0 W Co Co Q c 3 LL ~ E Oz G ? Nis N a Z Z ZO LI W Q jj� 00 mat 11 z z W W 0 w Z 0 re a W 17 MAIL SE Z 0 1- Z I- 0 I — Da 16 W ILI Le LIJ Z og Z a re 0 00 ase Print Ct a FACILITY INFORMATION Non -Discharge PCS Phosphate Co., INC - Aurora Division Facility Name: t 0 0) w a Z ra 0 C 0 O O c O 0 0 N N w E E m O ❑ 0 W O. 0 cc a LL H CO 0 W Aurora, NC .0) 0 O c0 0 C.1 S 0 N N ma) a Ca Q E d LL a) a) 0 0 C 0 0 o. C L_ J 0 ❑ ❑ eL a a) a) S a) 0 m co us o s DODO r O cc a) 0o a O 0 N 0 Z L 1530 Hwy 306 S Telephone#: (252)-322-8283 Danny Winstead Contact Person: Tank Farm Remediation Well Location/Site Name: m e o nX W N } Ew cuE 30 c.) -c z 0 a 0 z 0 z J a 01 FIELD ANALYSES: Date sample collected: N/A Cn co 0 Z 0 0 a aE) Z 0 0) l0 0 Q O Z 0 a U 0 U a 0) Well Diameter: 4 o 8 o Ca `o a 0 Q Z O ,C coop 0 N C o a) is c a W C a m 2 co d' 0 Z 0) 0 C Z a a) C en as co Ey O co a) � O as Z ❑ 0 N Measuring Point is 0) w } L t0 0 Ca a z >- 6 El a E N = C 0 N a) aa) a 0 -13 a d 7 N 0. 2 8 0 E 0w E > 0) z 0 1- 0 LL Z CC 0 0 CO PCS Phosphate Co. / Environment 1,Inc J of 3 E a a Z z N 0 0 0 0 C0 _ N 0 LL N Other (Specify Compounds and Concentration Units): a ( re z Qm ❑ � c.i it Q 0 0 t d E c es N a) a W v D 0 'a r t t t E E E E ❑ Lab Report Attached? 0 3) rn rn lb ) on a) 'a) co a) rn co co a) a) E E E E E a E>> E o 3 E E a o N Z Z • a '- N m o 0 O C as N ICI 0 u O O Az Z a a) 0 O— io Z 0 C l0 0) E O 0 y 01 O E t) a) d 0 s N W CD a> z z > v) 0 Z W o 0 O O C7 Tz0 m ca 0 uy 0 W LL ix g a) ill 0.W E N 0 y oa U Z LOf) 0 a) as L a N 0 L a O 0 Z 0 0 E m as' m Z rn O E U To 0 as 0 Z 0 Cd - Cadmium 0 Z o Chromium: Total 0 Z Z 0 0 0 0 c- c 0. O a — 0 ci a 0 Z Z 0 0 rn N-0 eal m m 0 , S Y Z Z rn 0 0 0 E a) 3 N C C Oa) C 0 0) C Z m 0 a) Z Z N J ) J J J J J J L J J of 0� 0) 0) a) a) a) 0) a) 0) E E E a E 3 E a E E O 0 0 03 S a O co 0 0 0 a) a 0 0 t 0 a 0 0 O 0 C a) N a a a 0 M 0 C a) L a a O O 0) w a 0) O 0 0 0 0 0 0 0 0 0 0. TKN as N 00625 N/A z A E m > J Z CA 0 c m w -J (0 0 0 % C c a .0 L 0 2 Q A c 0 d 0 0 a) E LL n 0 0) a N co a 1- C m a) Z N ate) N O oO1 E CD a Rev. 05-02-2017 z 0 LU a_ SUBMIT FORM ON YELLO 0) o 7 1 urA r O O n °zr rn7. w o ag u' a z J z S Zw us se re 00 z >zF z z w w LL 0 O w V w rc ww 0 co o 'E •y Q O O U 0 c (6 Nz I.L 0 H z 0 F O G o. Q. w W Q Z oa za. 00 0) (0 0 o 5 0 w N L E rn as z ca re LLI O. z° 0 co w a z N 3 O 0 c 0 0 o 7 O C c _ O z f0 o 0 0 0 M 'r 'R a Z a a Q .. W 00c t Ca a a' co O H u w a a O m 0 o a) w 0 H .c 0 •u1 O ce ii a 5 ❑ (n a 0 m m w O cosz co cn IZ ❑ ❑ ❑ ❑ F- �sJ(( O O QY S NN 0 g (0D U L FACILITY INFORMATION PCS Phosphate Co., INC - Aurora Division co Z i U co LL S N m C 0 U Aurora, NC O co O (0 Telephone#: (252)-322-8283 Danny Winstead Contact Person: No. of wells to be sampled: 18 Tank Farm Remediation Well Location/Site Name: a z 0 O LL z 0 z J a FIELD ANALYSES: Date sample collected: N/A n co 0 0 Z 0 0 Q E m Z c rn IO Q o 0 0 0 0_cn 0 Well Diameter: 4 0 N O Screened Interval: 0 OQ 0) c .7 (D (0 E O 0 7.7 E IQ O (NI Z 0. sr W N w J z t > y o J 0 L MI 0 O_ o Relative M.P. Elevation: ft. above land surface O ('7 Measuring Point is (`0 a) Q d z O z ❑ cn ICJ U (o 0) O. E as N 0 0 0) L 0) :( 0) a E a m 3 0 E PCS Phosphate Co. / Environment 1,Inc Other (Specify Compounds and Concentration Units): a o 2 C.1 H o a_a 'O 0 0 0 E s cti N a 0 °`3 0 0 0 n 0 0.00 0 > 0 00 0 0 L L .c L E E E E VOC Remo -J U rn rn as co o, rn .5) 'a) rn "Eb a) 15) E E E E E 7 E 7 a E a 7 E E a 7 w Q a a a Q a Q a Q Q Q Q Q tl! Z Z 0 To- ERo0 p C.)0-. (0 CO 0 o 0 O O �Zz (0 0 Z Z 0) O (0 (.i 0) 1 7 O L N Q Q iv z z > (0 (D Z M Ili O (n N 0 0 m 0 LL C N u CO tow g o_ E t w £ o oaa C.) J J E E 0) Co, O E sr O m .0. 0 LL Z (0 0 a0+ m 0 co 0 0 L 0 0 0 0 a e T 0 E z a 5, E m 0 0 U Z O E E a Z 0 E 0 m (a co Z 0) E 0 as U m 0 Z 0 Z 0 Z Z CV L0 0 0 Cd - Cadmium o Chromium: Total 0 0 0 s- c O d O — U ti 0 Z Z 000) 0)) C.-o U N M r a. rn = Y Z 0) as c a 0) Z O 0 N d c CO 0) a c Z co Y 0 Z 'z (0 J co J ..... t J J 0) 'C 0) 0) 0) of 0) g 0) 0) E 7 E E 3 E 3 E t. E E Q O O M n (0 H (D 0 0 a 0 co Q m O O O .0 0) 0_ Q o 00 co 0 0 Q 0 00)) 0 0 `O 0 Q N O O 0 U 0) Q Q Q O (+) n M 0 c 0 a Q 0 0) 0 co co Q H z 0 Q S Z Z 0 co 0 z 0- c cc. rn EZ Q 0 g TKN as N oos25 N/A J z N 0 0 :0 0 c c 0) d E re LL U) 0) 0) O3 m 0 0) 0 0 c a° E (0 0. O C a a m a 0 N m n 0 0 Z N c N O ce o a N ce oai - D) a SUBMIT FORM ON YELLOW PAPER ONL z0 0 w o w � W a c 3 � F c 0 z 13 (7) -wn Q8N a O. z Jzo i 0 p W zz 0 W Z 0 2 0 0 617 MAIL SE Z 0 2 ix z H 0 <O No. WN Ce C.) Z pQ Za 00 Please Print Cle FACILITY INFORMATION Non -Discharge PCS Phosphate Co., INC - Aurora Division Facility Name: o 0 cTs v c 0 a o = LY m 0 0 c c _ _ 0 Z 0 O 0 0 0 0 v Q a) Z_ a) m .c W aE) aE) c t O co cc ccJ O O ❑ ©❑ ❑ Q- W E a a O is 0a) w = H _ a) - re Il W c a R 0.33 U. CD 0 v) 0 CO 13 d LLI EL ❑ ❑ ❑ ❑ z O co Aurora, NC 0 U N 0 z i 1530 Hwy 306 S Telephone#: (252)-322-8283 Danny Winstead Contact Person: a0 0 0) a co 0) 0 N 3 0 0 z Tank Farm Remediation Well Location/Site Name: oi c N } m E N x z 0 a 0 LL z z_ N FIELD ANALYSES: Date sample collected: N/A z5O U z 0 0 0 a E a o U m a cn 0 < z cC 000 N Well Diameter: 4 0 ft. below measuring point u, N CO a) Ca r a 0 ft. above land surface CD 10. Measuring Point is 0 Z N W } a= 0 0 as 0 a) Q Lu Z >- 6 ❑ E o. d c 0 CD 0 0 4) l0 8 a) N 0. E V) ate`) E z 0 0 LL Z rt 0 CD o fn Ca 0 0 Certification No. PCS Phosphate Co. / Environment 1,Inc J Cr)CO E Pb - Lead 01051 Other (Specify Compounds and Concentration Units): v a v v .0 .0 .0 .00 EEE E E co E cc) E 6 E>> E 3 0) E 3 Z o CD N 0 E CO c Z 0 cc o V O z J .6 0 71 Z a c a) a m 0 O s) )o E 0) 0) .O O .0 (A N ;¢ To Z . M Z W o i Z 0 coU cCD re 0 W a F- a) 0a z csi co Z 03 0 z a) Z J E O O (D (0 M U LL LL E 0 0 U z co a 0 a) (6 N O .0 O_ (0 0 .0 a J E O O z 0 0 ti ci m .0 0_ 0 0 .0 0. 0 .0 O z 0 0 E (0 m N z 0 E .) (0 U as U z 0 Cd - Cadmium o Z z z 0 0 0 Chromium: Total o 0 0. 0- 0 U 0 0 0 LL Z z 0 n 0) 0) n 0 d w 2 0 = Y z 0) 0 E •N a) c 0) a) 0) 2 z 0 0 U_ Z Z W J N J J J J J -IL J J m 'c co m m O) 8) O) 0) O) E E E 7 E 3 E c. E E 0 0 v 2 0. Q O co 0 0 0 0 a) a 0 U 0 0 O U c a) 0 (N+) 0 c 0) a 0) 0 0 as 0) 00)) O 0 c 0 0 U = () a 0) N (0 Z as Z F- O. .0 .0 2 c 0 d a 5) N 0 c as lam. a) c m 0 0 0 a° E (0 a r `o c 'C w m 0. co s5 H 0 N Z N N O < 0 LYo` o N 0_ Date: Time: Tech: PCS Phosphate�,Co., Inc. - Tank Farm Remediation System Quarterly Monitoring /5/z // c25-1/.44//e/o74,-/1/2 System Gauge Pressures SWW-1 N/A SWW-7 N/A CWW-1 N/A CWW-7 N/A File: 12-07-02 pc: TLB Reference L Point MSL ;vel Rel [o MSL Ditch 12.91 >Jr Barge Slip 10.59 Water Level Control Tank ek = MSL Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. y Spz-1 10.47 c":1' e X�� Cpz-1 10.51 //0'1/� _ _ Spz-2 11.21 CP• S' ? 6 - Cpz-2 10.25 //'4/ "0 7 Spz-3 11.87 C���• g#' L t b ' Cpz-3 11.12 ,/Q,�J� ®- .6 '7 Spz-4 11.45 '// /0 /� S�5� CPW 9.65 /7;. 9 " / 3/ Spz-5 11.45 r � / �L5 MWTF-1A * 14.35 - .. �S. / /440 Spz-6 11.23 7- 7�r .5 ` -i MWTF-1 B * 14.36 •• �1 /49. 41 Spz-7 11.59 U/-li 1 " `//G MWTF-1C * 14.44 9'---• E/� •,,% ' / Spz-8 11.57 ,,k/e' ecfy - MWTF-2A 14.05 ', 4 4,9 9 Spz-9 11.01 ,5-:-.00 / 9. MWTF-2B 14.02 / .0c(� g 9 / 6 Spz-10 12.16 %' / 5-- �, 14.08 !-„'„ Cn - SPW 9.95 ®/ ��7 G 2- lib' WMWTF-2C MTF-3A 12.21 tom/ •2Z2 GO/ MWTF-3B 12.18 'X O ram -5 W MTF-3C 12.19 /?. 9/ �-7,✓ ' 7s_ Revised 7/29/02 * Riser length added to TOC elevation 1/24/97 D:1Data\Forms\Well Fonn\Tank Farm Remed Wells.xls PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE.INJECTION AND WITHDRAWAL WATER WELLS February 2021— April 2021 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Infection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL February 245,220 0 245,220 7.1 15.0 March 343,356 0 343,356 7.7 15.0 April 276,031 0 276,031 6.2 15.0 TOTALS 864,581 0 864,581 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM February 172,628 1,243,475 1,416,103 54.6 March 162,759 872,376 1,035,135 66.3 April 164,121 1,169,300 1,333,421 56.2 TOTALS 499,508 3,285,150 3,874,658 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps SWW- 1: SWW-2: SWW-3: On 3/5 replaced pump. SWW-4: SWW-5: On 3/5 replaced pump. SWW-6: On 2/3 replaced counter. SWW-7: On 2/5 pulled pump. 4 Croatan Formation Withdrawal Well (CWW) Pumps CWW-1: CWW-2: CWW-3: Pump down 15 days in March. Repaired April 1. CWW-4: CWW-5: CWW-6: CWW-7: 5