Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6210601_Design Calculations (Culvert 3)_20210603
Culvert Report Hydraflow Express Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. Thursday, May 27 2021 PIPE 3 Invert Elev Dn (ft) 190.95 Calculations Pipe Length (ft) 74.00 Qmin (cfs) = 1.13 Slope (%) 1.76 Qmax (cfs) = 1.13 Invert Elev Up (ft) 192.25 Tailwater Elev (ft) = (dc+D)/2 Rise (in) 18.0 Shape Circular Highlighted Span (in) 18.0 Qtotal (cfs) = 1.13 No. Barrels 1 Qpipe (cfs) = 1.13 n-Value 0.012 Qovertop (cfs) = 0.00 Culvert Type Circular Concrete Veloc Dn (ft/s) = 0.96 Culvert Entrance Groove end projecting (C) Veloc Up (ft/s) = 3.02 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 191.90 HGL Up (ft) = 192.65 Embankment Hw Elev (ft) = 192.78 Top Elevation (ft) = 194.79 Hw/D (ft) = 0.35 Top Width (ft) = 47.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 8 Ow (t) 195JOD 194JDO 193.00 192.00 191 JDO 190JOD PIPE 3 H a Depth (t) 275 1.75 075 -025 -125 -225 189JDO i i i i i i i i i i i i i i i i i i i i -3.25 0 5 1 15 2 25 a a5 4� 45 5� 55 so 85 7 75 8 85 a 5 - CircularCulvert - HGL Embank Reach fft!