HomeMy WebLinkAboutSW6210601_Design Calculations (Riprap)_20210603DATE
DESIGN PHASE
5-14-21
PRELIM
ROJECT NAME
P OJ
rGraceland
PROJECT NO
CONSTR x
c Subdivision
1656
REVISION
RECORD
-I
L LOC
OCATION
BY
lHoke County, North Carolina
CEK
OTHER
(SPECIFY)
CHECK
CSB
Storm Outlet Structure
FES No.=
FES-10
Pipe Dia=
30
in
Q10=
30.22
cfs
Qfull =
57.20
cfs
Vfull =
11.64
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-25
Pipe Dia=
18
in
Q10=
4.95
cfs
Qfull =
7.36
cfs
Vfull =
4.16
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.53
V/Vfu I 1 1.01
V 11.8 fps
3
10 in
15 in
1
22.5 in
20.0 ft
7.5 ft
22.5 ft
Q10/Qfu I 1 0.67
V/Vfu I 1 1.07
V 4.4 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 1 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR x
Subdivision
1656
REVISION
RECORD
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER
(SPECIFY)
I
ICHECKED BY
CSB
Storm Outlet Structure
FES No.=
FES-28
Pipe Dia=
18
in
Q10=
6.42
cfs
Qfull =
7.43
cfs
Vfull =
4.20
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-43
Pipe Dia=
18
in
Q10 =
9.82
cfs
Qfull =
9.21
cfs
Vfull =
5.21
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.86
V/Vfu I 1 1.12
V 4.7 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Q10/Qfu I 1 1.07
V/Vfu I 1 1.13
V 5.9 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 2 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR x
Subdivision
1656
REVISION
RECORD
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER
(SPECIFY)
I
ICHECKED BY
CSB
Storm Outlet Structure
FES No.=
FES-48
Pipe Dia=
18
in
Q10=
6.04
cfs
Qfull =
7.52
cfs
Vfull =
4.25
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-51
Pipe Dia=
18
in
Q10 =
2.70
cfs
Qfull =
7.43
cfs
Vfull =
4.20
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.80
V/Vfu I 1 1.11
V 4.7 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Q10/Qfu I 1 0.36
V/Vfu I 1 0.91
V 3.8 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 3 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR / x /
Subdivision
1656
REVISION / x /
RECORD / x /
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER / x /
(SPECIFY)
I I
BY
ICHECKED
CSB
Storm Outlet Structure
FES No.=
FES-55
Pipe Dia=
18
in
Q10=
3.53
cfs
Qfull =
7.43
cfs
Vfull =
4.20
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-59
Pipe Dia=
18
in
Q10 =
3.39
cfs
Qfull =
7.43
cfs
Vfull =
4.20
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.48
V/Vfu I 1 0.99
V 4.1 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Q10/Qfu I 1 0.46
V/Vfu I 1 0.97
V= 4.1 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 4 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR / x /
Subdivision
1656
REVISION / x /
RECORD / x /
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER / x /
(SPECIFY)
I I
BY
ICHECKED
CSB
Storm Outlet Structure
FES No.=
FES-68
Pipe Dia=
24
in
Q10=
11.24
cfs
Qfull =
12.63
cfs
Vfull =
4.01
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-73
Pipe Dia=
18
in
Q10 =
4.59
cfs
Qfull =
11.21
cfs
Vfull =
6.34
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.89
V/Vfu I 1 1.13
V 4.5 fps
2
8 in
12 in
B
18 in
12.0 ft
6 ft
14.0 ft
Q10/Qfu I 1 0.41
V/Vfu I 1 0.94
V 6.0 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 5 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR / x /
Subdivision
1656
REVISION / x /
RECORD / x /
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER / x /
(SPECIFY)
I I
BY
ICHECKED
CSB
Storm Outlet Structure
FES No.=
PO-75
Pipe Dia=
36
in
Q10=
31.64
cfs
Qfull =
52.73
cfs
Vfull =
7.45
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
PIPE 2 OUT
Pipe Dia=
18 in
Q10 =
1.43 cfs
Qfull =
8.30 cfs
Vfull =
4.69 fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.60
V/Vfu I 1 1.05
V 7.8 fps
3
10 in
15 in
1
22.5 in
24.0 ft
9 ft
27.0 ft
Q10/Qfu I 1 0.17
V/Vfu I 1 0.72
V 3.4 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 6 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P OJ
ROJECT NAME
rGraceland
PROJECT NO
CONSTR / x /
Subdivision
1656
REVISION / x /
RECORD / x /
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER / x /
(SPECIFY)
I I
BY
ICHECKED
CSB
Storm Outlet Structure
FES No.=
PIPE 3 OUT
Pipe Dia=
18 in
Q10=
1. 13 cfs
Qfull =
13.92 cfs
Vfull =
7.87 fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Length
Storm Outlet Structure
FES No.=
FES-35
Pipe Dia=
18
in
Q10 =
6.42
cfs
Qfull =
7.43
cfs
Vfull =
4.20
fps
From Fig.
8.06.b.l:
From Fig.
8.06.b.2:
Zone
D5o
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Zone
D50
DMAX
Riprap Class
Apron Thickness
Apron Length
Apron Width @ Outlet
Apron Width @ End
Q10/Qfu I 1 0.08
V/Vfu I 1 0.59
V 4.6 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Q10/Qfu I 1 0.86
V/Vfu I 1 1.12
V 4.7 fps
2
8 in
12 in
B
18 in
9.0 ft
4.5 ft
10.5 ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 7 OF 8
DATE
DESIGN PHASE
PRELIM
5-14-21
P ROJECT NAME
OJ CT
rGraceland
!
PROJECT NO
CONSTR
/ x /
jvIs
Subdivision
1656
REVISION
RECORD
/ x /
/ x /
I nrA
LOCATION
BY
Hoke County, North Carolina
CEK
OTHER
(SPECIFY)
/ x /
CHECKff�
,CSB
Storm Outlet Structure
FES No.= TSB4 OUT
Q10/Qfu I 1
0.63
Pipe Dia= 24 in
V/Vfu I 1
1.06
Q10= 23.80 cfs
V=
12.6
fps
Qfull = 37.70 cfs
Vfull = 11.99 fps
From Fig. 8.06.b.l:
Zone
3
From Fig. 8.06.b.2:
D5o
10
in
DMAX
15
in
Riprap Class
1
Apron Thickness
22.5
in
Apron Length
16.0
ft
Apron Width @ Outlet
6
ft
Length
Apron Width @ End
18.0
ft
Storm Drainage for Spread.xIs LATEST REVISION: 6/3/2021 2:10 PM PAGE 8 OF 8