Loading...
HomeMy WebLinkAbout20201510 Ver 1_B-5624 Utilities_20210603Submitted 6/3/2021 0 50'25'50' SCALE: 1"=100' 100' SHEET 3 OF 4 PERMIT DRAWING DATE: 03-11-2021 REVISIONS SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/99B-5624 100 NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 40 50 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$60 70 80 90 100 90 80 70 60 50 40 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 915 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 NC COA No. C-0890 SUNGATE DESIGN GROUP, P.A. 21 22 23 24 25 NAD 8 3/NA 2 0 0 1 FOR -LDET- SEE SHEET NO. 2B-2 UO3 SEE SHEET UO4MATCHLINE -L- POT STA. 21+00.00SITE 5 SITE 3 EOI FO MARKER WOODS WOODS THE NATURE CONSERVANCY 150.00'EXISTING R/W EXISTING R/W THE NATURE CONSERVANCY NC 211 - GREEN SWAMP RD NW BST VARIES (TYP) 27'25 (-L-)+00.00+23.002 GTD EXISTING GROUND PROPOSED GRADE (-)0.5862%PS4'PS4'12'12'C C C F F F F F F C F F DEEP MIN. ROLL PIPE @ 5' 3X1.25" SDR 11 INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC HH ATMC AT&T ABANDONED HH EXISTING AT&T HH TO INTERCEPT EXISTING ATMC HH TO INTERCEPT HH TRENCH OPEN TRENCH OPEN TRENCH OPEN HDD DRILL HDD DRILL HDD DRILL MCNC BOREBOUNDARYWETLAND ATMC BOREBOUNDARYWETLAND AT&T BOREBOUNDARYWETLAND AT&T ATMC TRENCH OPEN HDD DRILL HDD DRILL TRENCH OPEN TRENCH OPENHDD DRILL INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC 4'X4'X3' BORE PIT HANDHOLE PLACEMENT 3'X3'X3' BORE PIT & ATMC FROM EXISTING EOP AT&T 5'X 6' BORE PIT 8' Submitted 6/3/2021 0 50'25'50' SCALE: 1"=100' 100' SHEET 3 OF 4 PERMIT DRAWING DATE: 03-11-2021 REVISIONS SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/99B-5624 100 NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 40 50 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$60 70 80 90 100 90 80 70 60 50 40 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 915 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 NC COA No. C-0890 SUNGATE DESIGN GROUP, P.A. 21 22 23 24 25 NAD 8 3/NA 2 0 0 1 FOR -LDET- SEE SHEET NO. 2B-2 UO3 SEE SHEET UO4MATCHLINE -L- POT STA. 21+00.00SITE 5 SITE 3 EOI FO MARKER WOODS WOODS THE NATURE CONSERVANCY 150.00'EXISTING R/W EXISTING R/W THE NATURE CONSERVANCY NC 211 - GREEN SWAMP RD NW BST VARIES (TYP) 27'25 (-L-)+00.00+23.002 GTD EXISTING GROUND PROPOSED GRADE (-)0.5862%PS4'PS4'12'12'C C C F F F F F F C F F DEEP MIN. ROLL PIPE @ 5' 3X1.25" SDR 11 INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC HH ATMC AT&T ABANDONED HH EXISTING AT&T HH TO INTERCEPT EXISTING ATMC HH TO INTERCEPT HH TRENCH OPEN TRENCH OPEN TRENCH OPEN HDD DRILL HDD DRILL HDD DRILL MCNC BOREBOUNDARYWETLAND ATMC BOREBOUNDARYWETLAND AT&T BOREBOUNDARYWETLAND AT&T ATMC TRENCH OPEN HDD DRILL HDD DRILL TRENCH OPEN TRENCH OPENHDD DRILL INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC 4'X4'X3' BORE PIT HANDHOLE PLACEMENT 3'X3'X3' BORE PIT & ATMC FROM EXISTING EOP AT&T 5'X 6' BORE PIT 8' Submitted 6/3/2021 B-5624 NEU ENVIRONMENTAL PERMIT NARRATIVE AT&T (Telephone): AT&T has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). AT&T is encroaching within the NCDOT R/W. AT&T will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L- Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Yuri Moody; Email yuri.moody@genxcgroup.com, Phone 786-519-4809. ATMC (Telephone): ATMC has an U/G fiber optic cable is in conflict throughout the project along the (South side) of NC 211 (Green Swamp Road). ATMC is encroaching within the NCDOT R/W. ATMC will place a new U/G conduit (fiber optic) cable that follows along the (South side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L- Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Michael Barry; Email bmichael@atmc.com; Phone 910-755-1709. MCNC (Telephone): MCNC has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). MCNC is encroaching within the NCDOT R/W. MCNC will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+30 +/- and -L- Sta. 25+05 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Brett Boger; Email brettboger@telics.com Phone 336 -692-6477. Conclusion (Total Impacts due to Utilities): Permanent Fill in Wetlands 0.00 acres Hand Clearing in Wetlands 0.00 acres Submitted 6/3/2021