HomeMy WebLinkAboutNCC201910_NOT Closeout Documents_20210602Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources. 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Onslow Project: Crete Concrete Plant Holly Ridge giver basin: Cape Fear
Person financially responsible: Crete Holdings. LLC - John D AIlen, Member Project #: ON$LO-2020-040
Manager
Address: 2005 Eastwood Rd, Suite 200, Wilmington, NC 28403
1. Project Location: Camp Davis Industrial Park, Holly Ridge
Pictures: No
2. Weather and soil conditions. Sunny and workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A_ and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe.
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None Title:
Inspection report: Sent Report Date given/sent: May 07, 2021
9. Corrective action needed:
10. Comments: Project appears complete and stabilized. File will be closed. Any further/future development
will require a new permit application to be submitted.
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required_ Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available
at: https://edocs,deq.nc_gov/FormsiNCGO I -Termination. Please note that this correspondence
must be uploaded as art of completing the NOT process_
Reported by: Connor Musi Others present:
Date of inspection: May 05, 2021 Time arriving on site: 11.20 AM Time leaving site: 11:30 AM
cC: