Loading...
HomeMy WebLinkAboutA-0009CC_4B Plans_20210601School Creek Mountain School Creek Mountain GRAHAM COUNTY 100 100 20 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_tsh.dgnUser:zrichardCONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA S PORTTIONTATEOFNRTCAR O LI NASee Sheet 1A For Index of Sheets A-0009CC APD-0074(178)PE RIGHT OF WAY DATE: LETTING DATE: JIMMY L. TERRY, PE OF TRANSPORATION DEPARTMENTNORTH CAROLINA CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS Sylva, NC 28779 252 Webster Rd DIVISION 14 SEPTEMBER 2021 WANDA H. AUSTIN, PE CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD __. ROW,UTIL. CONST. APD-0074(178) APD-0074(178)A-0009CCAUSTIN TURNER, PE 32572.2.15 32572.3.15 D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = K 2022 2045 6590 8800 11 57.5 7 60 * TTST =2%DUAL =5% RURAL ARTERIAL REGIONAL TIER 1235 1236 28 129 143 143 1277 1208 1214 1218 1219 1223 1281 1221 1222 1207 1110 BUS 143 Robbinsville 1229 1223 1282 1226 28 Stecoah Cheoah DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVATURE AND HORIZONTAL SSD. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 32572.1.15 VICINITY MAP 50 TO ALMOND 50 50 25 25 10 5 10 50 50 OCTOBER 18, 2022 PROJECT END SECTION A-0009CCSECTION A-0009CBSWEETWATER RD-L- NC 143-L- STA. 414+50.00 BEGIN TIP PROJECT A-0009CC -Y2- STA. 12+60.00 BEGIN CONSTRUCTION 35363738 39404142 4344 45 46 47 48 49 TO ROBBINSVILLE TO FONTANA DA M FONTANA RD -Y2- NC 28 FONTANA RD -Y2- NC 28 -DR3--DR4-- Y3-STEVE DRSTECOAH HEIGHTS RDKNOLL TOP S R 12 2 6 MAR TI N J E NKI N S R DFONTANA RD -Y2- NC 28 CARVER BRANCH LN SR 1239 SR 1230 STECOAH RD SR 1238 BILL CRISP RD SR 1235 LOWERSTECOAH RD HYDE TOWN RD SR 1230 P OP LAR HI LLGUNTER GAP RDSR 1235PROJECT BEGIN -Y2- STA. 169+60.00 END TIP PROJECT A-0009CC -L- STA. 474+19.52 END CONSTRUCTION OF SR 1235 (GUNTERS GAP RD) UPGRADE NC 28 FROM 0.2 MILES WEST OF NC 143 TO 0.3 MILES EAST UPGRADE NC 143 FROM 0.5 MILES NORTH OF APPALACHIAN TRAIL TO NC 28 AND NATURAL RESOURCES. TO MINIMIZE IMPACTS TO USFD PROPERTY AND FROM -Y2- 12+60± TO 23+00± -L- 414+50 TO -L- STA 474+20 3R GUIDELINES WERE USED FROM -L- DESIGN DATA D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = K 2022 2045 3800 5200 11 67.5 7 50 * TTST =2%DUAL =5% RURAL ARTERIAL REGIONAL TIER -Y2- DESIGN DATA PROJECT A-0009CC TOTAL LENGTH TIP -Y2- -L- PROJECT A-0009CC LENGTH ROADWAY TIP 4.104 MILES 2.973 MILES 1.131 MILES = = = STECOAH CREEK - Y2 A-VIVIA LN S R 12 3 0 HYDE TOWN RDGRADING, PAVING, DRAINAGE, CULVERTS, & RETAINING WALLS MERGER 4B PLANS FOR 6-16-2021 MEETING UT TO CARVER BRANCH (SBU)UNABLE TO LOCATEST RE AM GOES U/GPROJECT ENGINEER PROJECT DESIGN ENGINEER 2018 STANDARD SPECIFICATIONS PLANS PREPARED FOR:PLANS PREPARED BY: NCDOT CONTACT:NAD 83/ 2011 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-1 A-0009CC PAVEMENT DESIGN6/2/996/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_typ.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED VAR. (4:1 TO 2:1) 4:1 8' 0.04 THIS LINE GRADE TO T Ground Exist. Ground Exist. 11' WITH GUARDRAIL 0.02 0.02 GRADE POINT 9.5" 12'12' C1W U L 8'8' 10'10'8' 4 :1VAR. (4:1 TO 2:1) 0.04 0.04 0.04 C2 C2 E1 D2 E1 THIS LINE GRADE TO VARIES (SEE XS-SECTIONS) T D2 0.02 Ground Exist. Ground Exist. 12' FDPS FDPS 9.5"1 * 1 * TYPICAL SECTION NO. 1 TYPICAL SECTION NO. 1 USE TYPICAL SECTION NO. 1 -L- (NC 143 - SWEETWATER RD)C 1 * C1 PAVEMENT SCHEDULE PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE I19.0C, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. EARTH MATERIAL.T EXISTING PAVEMENT.U AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, E1 V1 W AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. PROP. APPROX. 1 •" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN EACH OF TWO LAYERS. C2 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED 1 •" IN DEPTH. C4 PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT LSSS THAN 2 •" OR GREATER THAN 4" IN DEPTH. D3 R2 EXPRESSWAY GUTTER PROP. APPROX. 2 •" ASPHALT CONCRETE INTERMEDIATE COURSE, D2 TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. R3 8" X 12" CONCRETE CURB R1 2'-6" CONCRETE CURB AND GUTTER. PROP. 6" AGGREGATE BASE COURSE.J1 WEDGING EXISTING PAVEMENT, SEE THIS SHEET FOR DETAILS AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. IN EACH OF TWO LAYERS. C3 PROP. APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, INCIDENTAL MILLING, SEE THIS SHEET FOR DETAIL -L- STA 436+65± TO 438+33± VAR. FDPS (SEE PLANS) WIDTH STA TO STA 0' TO 12' Ground Exist. 0.02 0.02 GRADE POINT 12'12' C1 W U CL VAR. (4:1 TO 2:1) 4:1 4'8' 10'8'4:1 VAR. (4:1 TO 2:1)VAR. (4:1 TO 2:1) 0.040.04 0.04 0.04 C2 C2E1 D2 E1THIS LINE GRADE TO THIS LINE GRADE TOVARIES (SEE XS-SECTIONS) T T Ground Exist. Ground Exist. D2 5A * TYPICAL SECTION NO. 2 -Y2- STA. 13+60.00 TO -Y2- STA. 23+00.94 USE TYPICAL SECTION NO. 2 0.02 FDPS FDPS 9.5" -Y2- (NC 28 - FONTANA RD) -Y2- STA. 12+60.00 TO -Y2- STA. 13+60.00 NO 2 AS FOLLOWS: TRANSITION BETWEEN EXISTING AND TYP. SECT. NOTE: -Y2- STA. 14+50.00 TO -Y2- STA. 19+90.00, LT 1 * 1A * 6 * -Y2- (NC 28 - FONTANA RD) -Y2- STA. 23+94.34 TO -Y2- STA. 78+67.46 -L- STA. 414+50.00 TO -L- STA. 468+65.00 S Wedging Detail For Resurfacing MIN. MIN. MIN. U MIN.MIN. MIN. Detail Showing Method of Wedging C SURVEY L D3 C2 D2 E2 3" C2 E2 D3 E2 3"3" 2 1/2" D3 2 1/2"2 1/2" D2 C4 C4 EXIST. PAVEMENT WEDGING PROP. MILLING DETAIL USE MIILLING DETAIL ") 2 1COURSE (1 PROP. SURFACE DEPTH "2 10 to 1 MILLING C1 U W V1 VARIES (50'MIN.) -Y2- STA. 12+60.00 TO -Y2- STA. 13+60.00 V2 1 •" MILLING SEE INSET A (SHT 2A-4) MATCH LINE C CONCRETE SIDEWALK VAR. (4:1 TO 1.5:1)VAR. (4:1 TO 1.5:1) AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT LSSS THAN 5 •" OR GREATER THAN 3" IN DEPTH. E2 VAR. (4:1 TO 1.5:1)9.5"6' Ground Exist. 1 * CROSS-SECTIONS POSTS AS NOTED ON NOTE: USE EXTRA DEPTH 11' WITH GUARDRAIL 1A * POSTS USE EXTRA DEPTH 6' WITH GUARDRAIL VAR. (4:1 TO 2:1) 4:1 8' 0.04 THIS LINE GRADE TO T Ground Exist. Ground Exist. 11' WITH GUARDRAIL 0.02 0.02 GRADE POINT 12' C1 U L 8'8' 10'10'8'4:1 0.04 0.04 0.04 C2 C2 E1 THIS LINE GRADE TO VARIES (SEE XS-SECTIONS) T D2 0.02 Ground Exist. Ground Exist. FDPS FDPS 9.5"1 * 1 * TYPICAL SECTION NO. 1A -L- (NC 143 - SWEETWATER RD)C SEE INSET A (SHT 2A-4) MATCH LINE A 6 * 5C * TYPICAL SECTION NO. 1A USE TYPICAL SECTION NO. 1A -L- STA. 468+65.00 TO -L- STA. 474+19.52 5B * (4:1 TO 1.5:1)VAR. (4:1 TO 1.5:1)VAR. (4:1 TO 2:1)VAR. WIDTH STA TO STA -L- STA. 468+65.00 TO -L- STA. 472+25.00, LT12' TO 0'5A *0' -L- STA. 472+25.00 TO -L- STA. 474+19.52, LT 5B * 12' -L- STA. 472+25.00 TO -L- STA. 473+61.88, LT -L- STA. 468+65.00 TO -L- STA. 472+25.00, LT 12' TO 20' -L- STA. 473+61.88 TO -L- STA. 474+19.52, LT20' -L- STA. 470+50.00 TO -L- STA. 471+50.00, RT0' TO 12' -L- STA. 471+50.00 TO -L- STA. 474+19.52, RT 5C *12' SEE INSET F (SHT 2A-4) MATCH LINE G -Y2- STA. 19+90.00 TO -Y2- STA. 23+94.34, LT12'CONSTRUCTIONBEGIN PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, E1 D2 SHOULDER BERM GUTTERR4 SEE INSET H (SHT 2A-5) SEE INSET C (SHT 2A-4) SEE INSET B (SHT 2A-4) SEE INSET A (SHT 2A-4) MATCH LINE B SEE INSET H (SHT 2A-5) SEE INSET B (SHT 2A-4) SEE INSET A (SHT 2A-4) MATCH LINE A 9.5"W 4' 2' R5 5"MONOLITHIC CONCRETE ISLAND (SURFACE-MOUNT) R5 TO -L- STA. 474+07.88 FROM -L- STA 473+57.81 CONCRETE ISLAND -Y2- STA. 13+60.00 TO -Y2- STA. 14+50.00, LT0' CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS VAR. (4:1 TO 2:1) VAR. (4:1 TO 2:1) 4:1 8' 0.04 THIS LINE GRADE TO T Ground Exist. Ground Exist. 11' WITH GUARDRAIL 0.02 0.02 GRADE POINT 9.5" 12'12' C1W U L 8' 10' 0.04 C2 E1 VARIES (SEE XS-SECTIONS) D2 12' FDPS 11"1 * TYPICAL SECTION NO. 4 C -Y2- (NC 28 - FONTANA RD) 0.02 2:1 MAX 2:1 MAX8' 2' 6"1:11' SAWCUT Ground Exist. Ground Exist.T C2 D1 E1 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-2A-0009CC PAVEMENT DESIGN6/2/996/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_typ.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1 * -Y2- STA. 92+50.00 TO -Y2- STA. 98+65.27 USE TYPICAL SECTION NO. 4 THIS LINE GRADE TO 0.02 0.02 GRADE POINT 11" 12' C1 W U L C2 E1 D1 12'11"C -Y2- (NC 28 - FONTANA RD) 0.02 2:1 MAX 2:1 MAX2' 6"1:11' SAWCUT Ground Exist. Ground Exist.T C2 D1 E1 2' 2:1 MAX Ground Exist. Ground Exist. 0.02 6" VARIES (SEE XS-SECTIONS) -Y2- STA 93+50.00, RT USE 6' BERM : -Y2- STA. 92+50 TO 93+00.00, RT USE 4' BERM : NOTE: 15'-6" 4'10'1'-6" PATH MULTI-USE 6" (SEE DETAIL ) HANDRAIL TYPICAL SECTION NO. 5 USE TYPICAL SECTION NO. 5 1.5:1 MAX8' Ground Exist. 0.02 0.02 GRADE POINT C1 W U CL 8'8' 10'8'4:1 VAR. (4:1 TO 2:1)VAR. (4:1 TO 2:1) 0.04 0.04 0.04 C2 C2 E1 D2 E1 THIS LINE GRADE TO THIS LINE GRADE TO VARIES (SEE XS-SECTIONS) T 11' WITH GUARDRAIL D2 TYPICAL SECTION NO. 3 -Y2- STA. 78+67.49 TO -Y2- STA. 92+19.93 USE TYPICAL SECTION NO. 3 0.02 FDPS FDPS 9.5"9.5" -Y2- (NC 28 - FONTANA RD) 1 *1 *12'12' 6' 12' TO VARIES VAR. 6' TO 0' 9'-6" Ground Exist. CONCRETE BARRIER SINGLE FACED SEE INSET A FOR DITCH LAYOUT 4" CONCRETE DITCH Ground Exist. -Y2- STA. 88+25± TO -Y2- STA. 92+19.93,LT USE STANDARD DITCH: -Y2- STA 77+92± TO -Y2- STA 88+25±,LT USE RETAINING WALL: NOTE: (SEE DETAIL SHT ) RETAINING WALL #35 -Y2- STA. 92+19.93 TO -Y2- STA. 92+50.00 AND TYP. SECT. NO 4 AS FOLLOWS: TRANSITION BETWEEN TYP. SECT. NO. 3 NOTE: 6'6' DESIGNATION FOR LANE SEE PLANS VAR.VAR. 0' TO 6' 12' TO 6' -Y2- STA. 98+65.27 TO -Y2- STA. 135+21.96 S R1 R1R1 SCHEDULE PAVEMENT E1 4" B25.0C C1 C2 WEDGING 1.5" S9.5B 3" S9.5B T U W EARTH MATERIAL EXISTING PAVEMENT D2 2 •" I19.0C R1 2'-6" C&G D1 4" I19.0C SEE INSET E (SHT 2A-4) SEE INSET D (SHT 2A-4) MATCH LINE E NCDOT STD DRAWING 862.01 AT LOCATIONS SHOWN ON PLANS. NOTE: GUARDRAIL TO BE PLACED AT FACE OF CURB PER S CONCRETE SIDEWALK NCDOT STD DRAWING 862.01 AT LOCATIONS SHOWN ON PLANS. NOTE: GUARDRAIL TO BE PLACED AT FACE OF CURB PER WEST-BOUND LEFT TURN TO -Y2- STA. 102+40 -Y2- STA. 98+65.27 -Y2- STA. 133+63.02 TO -Y2- STA. 135+21.96, LT -Y2- STA. 132+02.72 TO -Y2- STA. 135+21.96, RT (SEE TYPICAL SECTION NO. 1) USE SHOULDER SECTION AND STANDARD DITCH NOTE:1:1T PAVEMENT SCHEDULE. SEE SHEET 2A-1 FOR DETAILED SHOWN OTHERWISE. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-3A-0009CC PAVEMENT DESIGN6/2/996/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_typ.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED USE TYPICAL SECTION NO. 6 Ground Exist. Ground Exist. 0.02 0.02 GRADE POINT 12' C1 W U CL VAR. (4:1 TO 1:1) VAR. (4:1 TO 2:1) 4:1 8'8' 10'10'8'8'4:1VAR. (4:1 TO 1:1)VAR. (4:1 TO 2:1) 0.040.04 0.04 0.04 C2 C2 E1 D2 E1 THIS LINE GRADE TO THIS LINE GRADE TO VARIES (SEE XS-SECTIONS) T T Ground Exist. Ground Exist. 11' WITH GUARDRAIL D2 TYPICAL SECTION NO. 6 0.02 FDPS FDPS 9.5"9.5" -Y2- (NC 28 - FONTANA RD) 1 *7 * 1 * 1 *12' WIDTH STA TO STA 0' TO 19'7 * 0'-Y2- STA. 135+21.96 TO -Y2- STA. 148+20.00 -Y2- STA. 148+20.00 TO -Y2- STA. 158+65.00 AND CONCRETE ISLAND LOCATION OF PAINTED LANE DESIGNATION, SEE PLANS FOR 19' TO 16'-Y2- STA. 158+65.00 TO -Y2- STA. 164+50.00 EXIST.EXIST. C1 C1 V2 V2 CL -Y2- (NC 28 - FONTANA RD) EXIST.EXIST. TYPICAL SECTION NO. 7 USE TYPICAL SECTION NO. 7 -Y2- STA. 166+45.00 TO -Y2- STA. 169+60.00 -Y2- STA. 135+21.96 TO -Y2- STA. 158+96.87 -Y2- STA. 158+96.87 TO -Y2- STA. 164+50.0012' TO 15' 8 * 12' 8 * -Y2- STA. 164+50.00 TO -Y2- STA. 166+45.00 AND TYP. SECT. NO 7 AS FOLLOWS: TRANSITION BETWEEN TYP. SECT. NO. 6 NOTE: 0.020.02 0.02 GRADE POINT CL THIS LINE GRADE TO 0.080.08 10'10' C2 E1 3' TT 7" 3' -Y3- (SR 1238 BILL CRISP RD) 4:1VAR. (4:1 TO 2:1) VAR. (4:1 TO 2:1) 8' VAR. (4:1 TO 2:1) 4 :1VAR. (4:1 TO 2:1) 8' TYPICAL SECTION NO. 9 USE TYPICAL SECTION NO. 9 -Y3- STA. 10+50.00 TO -Y3- STA. 14+02.24 0.020.02 0.02 GRADE POINT CL THIS LINE GRADE TO 8' 8" 8' 0.08 0.08 -DR3- 2'2' C3J1 TT VAR. (4:1 TO 2:1)VAR. (4:1 TO 2:1) 3'3'VAR. (4:1 TO 2:1) Ground Exist. Ground Exist. Ground Exist. Ground Exist. Ground Exist. Ground Exist. Ground Exist. Ground Exist. TYPICAL SECTION NO. 10 USE TYPICAL SECTION NO. 10 VAR. (4:1 TO 1.5:1) SCHEDULE PAVEMENT C1 C2 1.5" S9.5B 3" S9.5B T U EARTH MATERIAL EXISTING PAVEMENTC32" S9.5B 4" B25.0CE1 J1 6" ABC D2 2 •" I19.0C PAVEMENT SCHEDULE. SEE SHEET 2A-1 FOR DETAILED SHOWN OTHERWISE. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SEE INSET G(SHT 2A-4) MATCH LINE F -Y2- STA. 135+21.96 TO -Y2- STA. 164+50.00 RETAINED AND CURB TO BE EXIST. ISLAND 3 :13:1 EXIST. CL VAR. (4:1 TO 2:1)Ground Exist. 7'-2"6'-8" 30'-0" C1 C2D2E1 9.5" TT U THIS LINE GRADE TO -Y2A- (SR 1226 - MARTIN JENKINS RD) TYPICAL SECTION NO. 8 USE TYPICAL SECTION NO. 8 2' 0.08 W WEDGING V2 1 •" MILLING -Y2A- STA. 10+31.94 TO -Y2A- STA. 11+25.00 0.020.02 GRADE POINT CL THIS LINE GRADE TO 8' 8" 8' 0.08 2'2' C3J1 TT Ground Exist. Ground Exist. TYPICAL SECTION NO. 11 USE TYPICAL SECTION NO. 11 -DR4- -DR3- STA. 10+20.00 TO -DR3- STA. 11+72.03 0.02 0.02 2:1 VAR. (4:1 TO 1.5:1) -DR4- STA. 10+12.13 TO -DR4- STA. 11+10.00 SEE XS-SECT AND DETAIL SHT 2 - -DR4- STA 10+35+/- TO -DR4- STA. 11+30+/-, LT NOTE: ROCK EMBANKMENT CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS C2 D2 E1 THIS LINE GRADE TO 0.04 FDPS 1'-6" INSET A: USE INSET A 1' 1'9.5"CONCRETE BARRIER SINGLE FACED 2 * 2 * -L- STA 430+25± TO 436+65± -L- STA 428+94± TO 430+25± -L- STA 422+13± TO 428+94± -L- STA 420+39± TO 422+13± STATION TO STATION SHOULDER WIDTH 8' Ground Exist..02 INSET B: 0.049.5" C2 D2 E1 USE INSET B 3 * 3 * 4 * 4 * 3 * 4 * SEE X-SECT SLOPE VAR WIDTH AND Ground Exist.DITCH 4" CONCRETE 2 * 3 * 4 * 19'-6" VARIES 8'-0" TO 19'-6" 8'-0" VARIES 18'-1" TO 8'-0" 8' 10' 0.04 D2 E1 C2 9.5"0.02 R2 FDPS THIS LINE GRADE TO VARIES INSET C: USE INSET C 2:1 11'-8" 4'-0" TO -Y2- STA. 51+25.00 TO -Y2- STA. 57+76±, RT -L- STA. 421+44± TO -L- STA. 423+54±, RT ( =6', =4') -L- STA. 427+50± TO -L- STA. 431+42±, RT ( =VARIES 7' TO 9'-10", =10') -Y2- STA. 61+57± TO -Y2- STA. 66+83±, LT -Y2- STA. 26+60± TO -Y2- STA. 28+75±, LT ( =5'-6", =10') (SEE DETAIL SHT __) #32 RETAINING WALL #26, #27, #30, 0.02 2' 6"1:1TE1 15'-6" 4'10'1'-6" PATH MULTI-USE 4' .02 Gr o u n dExist. (SEE DETAIL SHT ) HANDRAIL USE INSET D INSET D: 0.02 2' 6"1:1TE1 15'-6" 4'10'1'-6" PATH MULTI-USE INSET E: USE INSET E G roundE xi st. 1.5:1 3'-6" -Y2- STA. 117+75± TO -Y2- STA. 128+25±, RT -Y2- STA. 115+25± TO -Y2- STA. 116+75±, RT -Y2- STA. 108+85± TO -Y2- STA. 111+40±, RT (SEE DETAIL SHT ) #36 & # 37 RETAINING WALLS -Y2- STA. 112+75± TO -Y2- STA. 115+25±, RT -Y2- STA. 107+75± TO -Y2- STA. 108+85±, RT INSET F: USE INSET F R1 S S R1 2'1:1TE1 8' USE INSET G INSET G: R1 Ground Exist. 0.02 VAR. R3 -Y2- STA. 158+32± TO -Y2- STA. 161+24±, RT INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-4A-0009CC PAVEMENT DESIGN6/2/996/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_typ.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SCHEDULE PAVEMENT E1 4" B25.0C C2 3" S9.5B T D2 2 •" I19.0C R1 2'-6" C&G 2 * -Y2- STA. 77+92± TO -Y2- STA. 88+25±, LT -Y2- STA. 71+25± TO -Y2- STA. 72+25±, LT -Y2- STA. 63+75± TO -Y2- STA. 66+02±, RT -Y2- STA. 28+25± TO -Y2- STA. 32+25±, RT -Y2- STA. 16+75± TO -Y2- STA. 18+60±, LT -Y2- STA. 14+75± TO -Y2- STA. 16+25±, LT -L- STA. 468+75± TO -L- STA. 471+75±, LT -L- STA. 453+25± TO -L- STA. 456+25±, LT -L- STA. 448+40± TO -L- STA. 452+25±, LT -L- STA. 439+00± TO -L- STA. 442+50±, LT = 8'-0": -L- STA. 420+39± TO -L- STA. 436+65±, LT SEE TABLE FOR WIDTH: TYP. SECT. NO 2, SHT 2A-1 TYP. SECT. NO 1, SHT 2A-1 MATCH LINE A & C SEE TYP. SECT. NO. 1, SHT 2A-1 MATCH LINE B SEE TYP. SECT. NO. 5, SHT 2A-2 MATCH LINE E SEE TYP. SECT. NO. 5. SHT 2A-2 MATCH LINE E SEE TYP. SECT. NO. 6, SHT 2A-3 MATCH LINE F EXPRESSWAY GUTTER R2 8" X 12" CONCRETE CURB R3 S SCHEDULE. DETAILED PAVEMENT SEE SHEET 2A-1 FOR SHOWN OTHERWISE. ARE 1:1 UNLESS PAVEMENT EDGE SLOPES 9 * 0.02 2' C2 10 *4' 0.04 Ground Exist.9.5"WIDTH STA TO STA 9 * 0' TO 12'-Y2- STA. 18+90.00 TO -Y2- STA. 19+90.00 12'-Y2- STA. 19+90.00 TO -Y2- STA. 21+91.72 10 * PARKING LOT 0' TO 21.45' 40.35' 40.35' TO 0' -Y2- STA. 18+90.00 TO -Y2- STA. 20+07+/- -Y2- STA. 20+07± TO -Y2- STA. 21+43± -Y2- STA. 21+43± TO -Y2- STA. 21+91.72 D2 E1 C3 J1 -Y2- STA. 18+90.00 TO -Y2- STA. 21+91.72, LT EARTH MATERIAL CONCRETE SIDEWALK (SEE DETAIL SHT ) #34, #35, #39, & #40 #23, #24, #25, #31, #33, RETAINING WALLS #21, #22 SEE TYP. SECT. NO. 1,SHT 2A-1 MATCH LINE A & MATCH LINE B PROP.GUARDRAIL SEPARATION. IN FRONT WITH MIN. 1' NEW WALL CONSTRUCTED WALL TO REMAIN AND EXISTING RETAINING GroundExist. 12" E1 C2 1' SAWCUT2:1 MAX.Ground Exist. C3 2" S9.5B J1 6" ABC SEE NCDOT RDY STD 275.01 AS LISTED BELOW ROCK PLATING TO BE USED CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER 2A-5A-0009CC PAVEMENT DESIGN6/2/996/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_typ.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0.04 D2 E1 9.5" R4 C2 3' Ground Exist. THIS LINE GRADE TO USE INSET HVAR. ( 4: 1 TO 1. 5: 1) INSET H: 11 * 11 * 11 * 8' Ground Exist..02 INSET I: 0.04 9.5" C2 D2E1 USE INSET I PROP.GUARDRAIL -Y2- STA. 67+00± TO -Y2- STA. 70+50±, RT -L- STA. 438+50± TO -L- STA. 442+50±, RT = 10'-3" SEE TYP. SECT. NO. 1, SHT 2A-1 MATCH LINE A & B SEE TYP. SECT. NO. 1, SHT 2A-1 MATCH LINE A 5'-6" (SEE DETAIL SHT __) RETAINING WALL #32 10' -Y2- STA. 59+00± TO -Y2- STA. 61+57±, LT -Y2- STA. 58+95± TO -Y2- STA. 59+00±, LT -Y2- STA. 47+50± TO -Y2- STA. 52+57±, LT -Y2- STA. 27+00± TO -Y2- STA. 28+25±, RT = 8' R4 SCHEDULE PAVEMENT E1 4" B25.0C C2 3" S9.5B D2 2 •" I19.0C GUTTER SCHEDULE. DETAILED PAVEMENT SEE SHEET 2A-1 FOR SHOWN OTHERWISE. ARE 1:1 UNLESS PAVEMENT EDGE SLOPES R4 SHOULDER BERM THIS LINE GRADE TO CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS 2640265026702690270027102720 27302730 2740 2740 27402750 2750 27502 7 6 0 276027702770277027702770 2780 278027802790 2790279027902790 2800 2800280028002 8 0 0 2810 2810281028102810 2820 28202820 2820 2820 2820 2830 2830 2830 28302830 2830 2840 2840 28402840 284028402850 2850 2850 28502850 28502850 2860 2860 2860 2860 286028602860 2860286028702870 2 87 0 2870 2870 287028702870 2870287028802880 2880 288028802880 2880 2880 2880 28802880 2880 28902890 2890 289028902890 2890 2890 2890 2890289029002900 290029002900 2900 2900 2900 290029002900 2910 2910 2910 2910 2910291029 102910 2910 2910291029102910 2920 2920 2920 29202920 29202 9 2 0 29202920 2930 2930 2930 293029302 9 3 0 2930293029302940 2940 2940 2940 294029402940 2950 2950 29502950 2950 2 9 5 0 2 9 5 0 2960 2960 2960 2 9 6 0 2960 2 9 6 0 2970 29702970 2 9 7 0 2 9 7 029702 9 8 0 2980 2 9 8 0 2980 2980 29802990 2990 2990 2990 2990 3000 3000 3000 3000 30003010 3010 30103010 3020 3020 3020 3030 3030 3030 3040 30403040 3040 3040 30503050 3060 3070 NAD 83/ 2011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS A-0009CC 35 HYDRAULICSROADWAY DESIGN 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_35.dgnUser:zrichard8/17/99END SECTION A-0009CBBEGIN SECTION A-0009CCMATCH TO SHEET NO. 36MATCH LI NE STA -L- 428+00.00PI Sta 419+44.60 D L = 590.05' T = 321.35' R = 600.00' FOR -L- PROFILE, SEE SHEET NO.69 FOR -DR3- PROFILE, SEE SHEET NO. 77 PAVEMENT REMOVAL ISLAND - SURFACE MOUNTED PROP MONOLITHIC CONC 415420425-L- PC 416+23.25 0 202 02 0 2 02 01 00 01 AT-1-L- STA. 414+50.00 BEGIN TIP PROJECT A-0009CC 12'12'12'01000001020304050607088'F DPS 3 0'R 2 5'RCONCRETE DRIVE PROP. GRAVEL DRIVE PROP. -DR3 STA. 10+20.00 BEGIN CONSTRUCTION -L- PT 422+13.30 -DR3- PT 10+98.80 -DR3- PC 10+38.28 3 2' TYP+52.72+85.8112'12'12'8'FDPS END -L- STA. 436+65± BEGIN -L- STA. 420+39± W/CONCRETE DITCH PROP. RETAINING WALL #21 0 30 40 5063 0'R 070836' TYP+17.30GREU TL-303 0230'R 05045 0'R44+708'8'24'24'+66.37+58.43 +24.69 8:1 END -L- STA. 423+54± BEGIN -L- STA. 421+44± PROP. RETAINING WALL #26 END -L- STA. 431+42± BEGIN -L- STA. 427+50± PROP. RETAINING WALL #27 25' TYP+7 0 42'-6"48'-6"CONC. ISLAND MONO.32'4'8'FDPSEXISTING SIGN TIE CONCRETE TO LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE ISLAND & DRIVE 8'F DPS 8'FDPS S OIL (AB AND.) 1 S F DMT L MT LWOODS SI GNROCKCONCCONCCONCCONCCONC CONCCHURCH1 S ROCKW ALLRETAI NI NGROCKWALLRETAI NI NGROCKC O NC WD RAI LGATE6" CONC CURB6" CONC CURBBST SHOULDERGR GRGRGAT E GPS -18 BST BST GR GR RI P-RAPMTL MTL MTL TIMBER RETAINING WALL BL-63 MTL RI P-RAPBST SHOULDER NC 143 (SWEETWATER RD.) 24' BST S HE DB L K20" MAPLE W OODSWOODS WOOD S WOODS WOODS WOODS WOODS U.S. FOREST SERVICE TRACT N-599 DB 82 PG 603 MARCIA G. WILLIAMS DB 289 PG 738 DB 118 PG 233 MARCIA G. WILLIAMS DB 289 PG 738 HOUSE OF PRAYER DB 147 PG 92 DELMAR L. HOLDER, ET AL DB 118 PG 76 WOODS WOODS WBB 415 416 4 1 7 418419 420 421 422 423 424 425 426 427 428 1011D B 4" 18" CMP DICONC T OP=2929.19'I NV=2926.93' I NV=2910.76' 18" C MP 12" HDPE CONC DI 18" CMP TOP=2903 .05 'INV=2900 .37 'CONCINV=2897 .26 'INV=2860.56' 18" CMP CONC INV=2878.72' 12" H DPE DITOP=2863.25' INV=2861.14' CONC 18" CMP TOP=2862.60'INV=2859.47' INV=2859.41' INV=2857.46' DI 18" CMP CONC -L- CURVE DATA DS = 45 MPH SE = 0.08 PI Sta 10+68.68 D L = 60.52' T = 30.41' R = 250.00' PI Sta 11+40.26 D L = 66.28' T = 39.03' R = 50.00' -DR3- CURVE DATA SE = SEE PLANS SE = SEE PLANS -DR3- PT 11+67.51 -DR3- PC 11+01.23 B1 1 2 B2 -DR3- POT 10+00.00 -DR3- POT 11+96.03 -L- POC 420+20.00 = 1 B1 2 B2 2 TONS, 7 SY GEO CLASS B RIPRAP 3501 3502 3503 REMOVE P PLUG FLOWABLE FILLPLUG P 18" R CP-III 24" CSPSEE DETAIL 35B FALSE SUMP SEE DETAIL 35B FALSE SUMP ( Not to Scale) BERM BASE DITCH 1. 5: 1 2:1 D2:1B b d -L- STA. 419+00 TO STA. 419+50 LT DETAIL 35A b=5.0 Ft. B=2.0 Ft. Max. d=1.5 Ft. Min. D=1.5 Ft. Type of Liner= Class I Rip-Rap Ground Natural RDWY GEOTEXTILE 3504 3505 3506 3507 3508 30 TONS, 60 SY GEO Class I RIP-RAP SEE DETAIL 35A BERM BASE DITCH P PLUG FLOWABLE FILLP REMOVE REMOVE ELB 3509 ELB 2GI 15" R C P -III 24" CSPBDO 15" RCP-III 15" RCP-III 2GI 30" RCP-III20 TONS (KEYED-IN) CLASS I RIPRAP 2GI 2GI-D 65 TONS (KEYED-IN) CLASS I RIPRAP 35 TONS (KEYED-IN) CLASS I RIPRAP PLUG CONC. DITCH REMOVE 3510 3511 1 TONS, 5 SY GEO CLASS I RIPRAP SEE DETAIL 35C FALSE SUMP SEE DETAIL 35B FALSE SUMP SEE DETAIL 35B FALSE SUMP 8:1 4:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP 2' DETAIL 35B Traffic Flow Outside Ditch 1.0' Max.0.5' Min.etc. GI -L- STA. 419+48 LT -L- STA. 418+09 LT -L- STA. 416+37 LT -L- STA. 414+93 LT C Proposed Ditch P PLUG F L OWABL E FI L L PLUG P RET AIN E351 3512 3513 3514 3515 (ELBOWS) WITH GASKETS ROD AND LUG 3516 3517 3518 3519 15" RCP-IV TB 2GI TB 2GI 15" RCP IV 22 TONS (KEYED-IN) CLASS I RIPRAP REMOVE P PLUG FLOWABLE FILL PLUG P REMOVEREMOVE SEE DETAIL 35C FALSE SUMP L S etc. GI 4:1 4 :1 ( Not to Scale) FALSE SUMP 2.0' -L- STA. 426+19 RT -L- STA. 421+00 RT DETAIL 35C Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch 11 TONS (KEYED-IN) CLASS I RIPRAP 16 TONS (KEYED-IN) CLASS I RIPRAPGTD15" RCP IV 18" RCP- I V C S P 18" TB 2GI 2GI (SEE WALL ENVELOPES FOR DITCH GRADE) -L- STA. 420+39 TO 428+00 LT (XX SY) DETAIL 35D BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' SEE DETAIL 35D RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 36ARETAINING WALLCONC. DITCH BEHIND (Top Wall) 2GI (Top Wall) 2GI 3520 18" CSP18" RCP- I V (ELBOWS) WITH GASKETS ROD AND LUG TB 2GI THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE 2GI DI 1 5 " (ELBOWS) WITH GASKETS ROD AND LUG 2GI-D 7 TONS, 15 SY GEO CLASS I RIPRAP O OO OOOO PERCHED 0.5' NO FLOW 2' BASE WITH SILT TOP COVERED FAIR CONDITION 2' BASE LIVE FLOW DRIVE EROSION R/W MARKER PERCHED 4' 0.1' 1.0' 1'-2' 4:1 4:1EXISTING CHANNEL NOTE: JURISDICTIONAL STREAM 1:1 SIDE SLOPES 0.2' WATER 3' BASE SCOUR @ OUTLET 8' ROUND PERCHED 3'-4' (-)6.696 (-)6.193 (-)6.193 (-)7.270 (-)6.696 BRANCH (SBB)UT TO CODYBRANCH (SBB)UT TO CODYF C C C C C C F C C C C CF CFCCC C F C C C C C C C F C C F C F C F C F C C C CC C C C C C C C C C C C 2 6 5 0 2 6 5 0 26502660 2660 2 6 6 0 26702670 2670 26702680 2 6 8 0 26802680 2690 26902690 2690 2690 2690 2700 2700 2700 2700 2700 270027102710 2710 2710 2710271027202720 2720 2720 2720272027302 7 3 0 2730 2730 2 7 3 0 2730273027402740 2740 2740 27402740274027502750 2750 2750 2750 2750 2750 2750275027602760 2 7 6 0 2760 27602760 2760 2760276027702 7 7 0 2770 2770 2770 2770 277027702770 2780 27802780 27802780 2780 2 7 8 027802780 2790 27902790 27902790 279027902790 2790 27902790 2800 2800 2800 28002800 2 8 0 0 2800280028002800 2810 2810 2810 2810 281028102810281028102810 2820 2820 28202820 2820 2820282028202 8 2 0 28202830 2830 28302830 2830 283028302 8 3 028302830 28402840 28402840 28402840 2840 2840 2850 2850 2850285028 5028502850 2860 2860 2860286028602860 2870 2870 2870287028702870 2880 2880 28802880 2 8 8 0 2880 28902890 2890 2890289028902890 29002900 2900 2900290029002900 2 9 1 0 2910 2910 29102910 2 9 1 0 2910 2920 2920 2920 29202920 2920 2920 2930 2930 2930 29302930 2930 2930 2940 2940 2940 29402940 2 9 4 0 2950 2950 2950 2 9 5 0 29502 9 5 0 2960 29602960 2960 2960 2970 2970 2970 2970 2970 2980 2980 2980 298029902 9 9 0 2990 2990 30003000 3 0 0 0 300030103010 3 0 1 0 302030203020 30303 0 3 0 30303 0 4 0 30503050 30603060306030703070 NAD 8 3 / 2 0 11 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A-0009CC 36 HYDRAULICSROADWAY DESIGN 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_36.dgnUser:zrichard8/17/99MAT C H T O SH E E T NO. 35 MAT C H L INE S T A -L - 428+00.00 CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS MATCH TO SHEET NO. 37MATCH LINE STA -L- 442+00.00PI Sta 434+01.05 D L = 596.48' T = 351.24' R = 450.00' PI Sta 440+11.67 D L = 297.01' T = 151.14' R = 650.00' FOR -L- PROFILE, SEE SHEET NO. 69 *AND HORIZONTAL STOPPING SIGHT DISTANCE. DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVATURE * 430 4350 1 0 0 0 1 0 2 0 3 0 4 0 5 060708070605G R EU TL-336' T YP+21.81 12'12'12' 15'R -L- PC 430+49.81 -L- PC 438+60.52 -L- PT 441+57.5312'12'12' 80'R12'+40.908'F DPS 8'FDPS8'FDPS END -L- STA. 431+42± BEGIN -L- STA. 427+50± PROP. RETAINING WALL #27 END -L- STA. 436+65± BEGIN -L- STA. 420+39± W/CONCRETE DITCH PROP. RETAINING WALL #21 44000 00 01 02 03 04 05 0 6 0 7 0 8 01 02 03 04 05 06 0 7 0 8 0827' TYP +37.41TYPE B-77 TYPE B-77 -L- PT 436+46.29 50'R12'+16.30END -L- STA. 442+50± BEGIN -L- STA. 439+00± W/CONCRETE DITCH PROP. RETAINING WALL #22 36' TYP +61.538'FDPS 190.67' SHOULDER TAPER 19.5' TO 8' SIGN DISTURB DO NOT 8'F DPS -L- STA. 437+53.41 TO 448+97, RT SHOULDER BERM GUTTER PROP. DRIVE TTI MBER RET AININ G WALLMTL MTLMTL BST S H O UL DER BST S H O UL DER BST SHOULDER WALL BLOCK GATEWD RAIL WD RAIL W/LT GR GR GRMARKER F/O KNOLL TOPSI GNMTL MTL MTL MTL MTL BST BSTBST SHOULDER BST SHOULDER BL-66 MTL S 39°11'04" W207.89'S 18° 5 2' 4 6" W117. 5 2' S 30°05'43" W103.49'S 2 1°3 0'13" W6 9.2 6' N 46°12'08" E 1273.13'N 76°56'20" E397.43'BL-65S 85°11'28" E232.44'N 71°07'32" E567.00' 24' BST S 84°48'03" E65.49'S 84°48'03" E63.65'S 80°45'55" E221.82'EIP EIPWO O DS WO O DS WOODSWOODSWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS MARCIA G. WILLIAMS DB 289 PG 738 DB 204 PG 740 BARBARA LAKEY U.S. FOREST SERVICE TRACT N-676 DB 102 PG 614 MARCIA G. WILLIAMS DB 289 PG 738 BL-64 CIRCLE G MANAGEMENT, LLC DB 359 PG 483 DB 359 PG 486 ROBERT L. LINN DB 234 PG 200 BARBARA LAKEY DB 204 PG 740 DB 329 PG 466 NORCROSS ROBERT K. ).DR RETAWTEEWS( 341 CN SPIKE NAIL IN BASE OF 24" PRINCESS TREE -BL- STA. 432+42.00 78' RT. BM#21 ELEV. 2806.49' 428 429 430 431 432433 434 435 436 437 438 439 440 441 442 D B 4" 15" R CP DI T OP=2840.61'IN V=2837.54'CONCTOP=2 8 2 8. 3 1'I NV=2 8 2 5. 5 2'DI DI I NV=2 8 2 9. 15' I NV=2 8 2 4. 7 2' I NV=2 8 2 4. 6 3'TOP=2 8 3 1. 7 9'I NV=2 8 2 2. 5 3' 18" CMP18" CMPCONC INV=2812.08' TOP=2815.30' 15" CMP DI DI INV=2810.60' INV=2810.36' TOP=2815.17'18" CMPINV=2792.49' INV=2756.53' INV=2784.62'HWCONC 18" CMP INV=2765.20' INV=2764.44' 6" CMP SE = 0.08 SE = 0.08 DS = 45 MPHDS = 40 MPH -L- CURVE DATA GREU TL-3 2 TONS, 7 SY GEO CLASS B RIPRAP 3601 3602 3603 3604 3605 3606 SEE DETAIL 36A RETAINING WALL CONC. DITCH BEHIND 3608 3609 E361 3610 3611 3612 3613 3614 REMOVE PLUG FILL FLOWABLE P P PLUG REMOVE 1 5" RCP-I V 24" RCP-IV2GI TB 2GI TB 2GI TB 2GI 15" RCP IV 15" RCP IV 7 TONS, 15 SY GEO CLASS I RIPRAP 361515" RCP-IV 18"(Top Wall) 2GI (Top Wall) 2GI (Top Wall) 2GI TB 2GI 2GI (4' DIA.) MH REMOVEREMOVE REMOVE P PLUG F LOWABLE FI LLPLUG P RETAINTB 2GI OTCB-4 15" 60 TONS, 120 SY GEO CLASS I RIPRAP 15" RCP IV 3616 3617 3618 3619 3620 3622 3623 (Top Wall) 2GI (Top Wall) 2GI (Top Wall) 2GI SEE DETAIL 36A RETAINING WALL CONC. DITCH BEHIND 3621 18" 18" RCP-IV 18" RCP-IV 2 4 " RCP-I V24" RCP-IV 24" RCP-IV 24" CSPELB ELB (ELBOWS) WITH GASKETS ROD AND LUG TB 2GI-A TB 2GI-A TB 2GI-A P PLUG P PLUGFILLFLOWABLE RE MOVE REMOVE REMOVE 18 TONS (KEYED-IN) CLASS II RIPRAP 18 TONS (KEYED-IN) CLASS II RIPRAP 3624 15" RCP-I V 15" R CP-I V TB 2GI AND LI NE W I TH CI PPRETAI N 18" CM P(SEE WALL ENVELOPES FOR DITCH GRADE) -L- STA. 439+00 TO 442+00 LT (XX SY) -L- STA. 428+00 TO 436+65 LT (XX SY) DETAIL 36A BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' 24" CSPELB ELB GASKETS (ELBOWS) ROD AND LUG WITH THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE O OO 18" CM P& RUSTED BOTTOM PERCHED 0.5' BIG SCOUR HOLE PERCHED 9' ALL FLOW HERE @ GUTTER SHOULDER FAILURE DRAIN 8" FRENCH NO FLOW & RUSTED BOTTOM PERCHED 0.5' PERCHED 0.5' EROSION RDY DRN 1.0' 2' 4:1 4:1EXISTING CHANNEL DRY PERCHED 6' BOTTOM RUSTED OUTLET PERCHED 0.5' (-)6.193 (-)6.619 (-)6.619 (-)7.849 (-)7.849 (-)8.042 C C C C C C C CFCFC F C C C F C C C C F C F C C F C C C C C F C C C C C C CCC CCC CC C F F F F F F F F F FF F F 24902500 2510 25202530 2 5 3 0 2530 2540 2540 2540 2550 2550 255025502550 2560 2560 2560 2560 256025702570 2570 2570 2570 2580 2580 25802 5 8 02580 258025802590 259025902590 2590 2590 26002600 2 6 0 0 2600 2600 2600 26102610 2 6 10 2610 2610 2610 2610 2620 2620 2620 2620 2620 26202620 2 6 3 02630 2630 2630 2630 26302630 26402640 26 4026402640 2640 2640 26502650 26502650 2650 26502650 2660 2660 2660 2660 2660 26602660 26602660 2660 2670 2670 2670 26702670 2670 2670 2670 267026802680 2680 26 8 0 2680 268026802690 2 6 9 0 2690 2690 2690 2690 26902690 2700 27002700 2700 27002700 2700 2700270027002710 2710 271027102710 27102710 2710 2720 2720 27202720 2720 2720 2720 2 7 2 0 2730 2 7 3 0 27302730 2730 2730 2730 2730 2740 27402740 27402740 2740 2740 2740 2740 2750 2750 2750 2750 2750 2750 2750 2750 2760 2760 2760 2760 2760 2760 2770 27702770 2770 2770 2770 2780 27802780 2780 2780 2780 2790 2790 2790 2790 2790 27902 8002800 2800 2800 2800 28002810 2810 2810 2810 2810 2820 2820 2820 2820 2820 2830 2830 2830 2830 2840 2840 2840 28502850286028602870 2880 2 8 9 0 2 9 0 029102920293029402950 NAD 83/ 2011 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_37.dgnUser:zrichard8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A-0009CC 37 HYDRAULICSROADWAY DESIGN CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS MATCH TO SHEET NO. 36MATCH LINE STA -L- 442+00.00MATCH TO SHEET NO. 38MATCH LINE STA -L- 456+00.00FOR -L- PROFILE, SEE SHEET NO. 70445450455040302010001020202020807060504030201000136' TYP +21.5336' TYP+52.49GREU TL-3 TYPE B-77 TYPE B-77TYPE B-77GREU TL-3TYPE B-77 GREU TL-3 12'12'12'8'FDPS END -L- STA. 442+50± BEGIN -L- STA. 439+00± W/CONCRETE DITCH PROP. RETAINING WALL #22 END -L- STA. 452+25± BEGIN -L- STA. 448+40± W/CONCRETE DITCH PROP. RETAINING WALL #23 END -L- STA. 456+25± BEGIN -L- STA. 453+25± W/CONCRETE DITCH PROP. RETAINING WALL #24 -L- PC 454+16.49 T = 275.02' PI Sta 456+91.51 D L = 515.75' R = 600.00'12'12'12'8'FD PS8'FD PS-L- STA. 437+53.41 TO 448+97, RT SHOULDER BERM GUTTER -L- STA. 451+86 TO 453+62, RT SHOULDER BERM GUTTER BL-67 MTL MTL MTL MTL MTL MTL MTL MTL MTL BST SHOULDER SPIKE NAIL IN BASE OF 12" POPLAR -BL- STA. 444+50.00 72' LT. BM#22 ELEV. 2715.62' BL-68 BST SHOULDER SOILSOIL SOIL ROBERT K. NORCROSS DB 329 PG 466 SOIL SOIL SOIL SOIL SOIL SOIL ALLEN H. LAKEY DB 189 PG 493 U.S. FOREST SERVICE TRACT N-676 U.S. FOREST SERVICE TRACT N-668 DB 96 PG 738 DB 102 PG 614 TRACT LI NE7.50' S 62°30'29" W 24' BSTNC 143 (SWEETWATER RD.)N 61°43'30" E258.96'N 68°19'37" E99.08'WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS NORCROSS ROBERT K .442 443 444 445 446 447 448 449 450 451 452 453 454 455 456SPRING D B 4" INV=2709.42' TOP=2730.58' INV=2725.13' CONC DI 18" CMP INV=2652.93' INV=2719.13'8" CMPINV=2697.80' INV=2662.87' INV=2666.00' INV=2699.20' 24" CMP 8" CMPINV=2671.71' HW CONC INV=2642.87' 24" CMP 8" CMPINV=2607.70' INV=2665.24' HW BLOCK -L- CURVE DATA SE = 0.08 DS = 45 MPH 3701 3702 3703 3704 3705 REMOVE REMOVE (Top Wall) 2GI SEE DETAIL 37B FALSE SUMP SEE DETAIL 37B FALSE SUMP 50 TONS (KEYED-IN) CLASS II RIPRAP 3706 3707 3708 3709 3710 3711 ELB ELB OTCB-4 2GI-A TB 2GI 30" CSP30" RCP-III24" RCP-III18" RCP-III (ELBOWS) WITH GASKETS ROD AND LUG PLUG P FILLFLOWABLEP REMOVE PLUG 20 TONS (KEYED-IN) CLASS II RIPRAP SEE DETAIL 37B FALSE SUMP 8:1 4:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP 2' DETAIL 37B Traffic Flow Outside Ditch 1.0' Max.0.5' Min.etc. GI -L- STA. 446+64 LT -L- STA. 444+63 LT -L- STA. 443+62 LT C Proposed Ditch 15" CSP2GI 12 TONS (KEYED-IN) CLASS I RIPRAP 30" CSP30" RCP-III30" RCP-IIIHW TB 2GI-A TB 2GI-A 22 TONS (KEYED-IN) CLASS II RIPRAP PLUG P PLUG P FLO WABLE FILL HW REMOVE SEE DETAIL 37A RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 37A RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 37A RETAINING WALL CONC. DITCH BEHIND (ELBOWS) WITH GASKETS ROD AND LUG 3712 3713 3714 3716 3717 3718 3719 3721 3722 3723 EST. 65 TONS CL 'II' RIP-RAP SEE DETAIL 37C BASE DITCH SPECIAL LATERAL P PLUG FLOWABLE FILLP PLUG REMOVE EST. 16 TONS CL 'I' RIP-RAP SEE DETAIL 37D BASE DITCH STANDARD d 2:1B D ( Not to Scale) 2:1 SPECIAL LATERAL BASE DITCH Slope Fill DETAIL 37C Ground Natural (Keyed-In) Type of Liner= Class II Rip-Rap B= 2.0 Ft. Max. d= ? Ft. Min. D= ? Ft. -L- STA. 452+50 TO 453+00 LT 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d -L- STA. 448+20 LT DETAIL 37D B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= Exist. to 2 Ft. Ground Natural Ground Natural *When B is < 6.0' (Keyed-In) Type of Liner= Class I Rip-Rap 18 TONS (KEYED-IN) CLASS I RIPRAP (Top Wall) 2GI 18" RCP-IV 18" RCP-IV R CP-I V 18" RCP-IV 18" 18" RCP IV 25 TONS (KEYED-IN) CLASS II RIPRAP 36" CSP36" RCP-IV36" RCP-IVHW TB 2GI-A TB 2GI-A HW REMOVE (SEE WALL ENVELOPES FOR DITCH GRADE) -L- STA. 453+25 TO 456+00 LT (XX SY) -L- STA. 448+40 TO 452+25 LT (XX SY) -L- STA. 442+00 TO 442+50 LT (XX SY) DETAIL 37A BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' TIE 8" INTO 2GI (3703). (ELBOWS) WITH GASKETS ROD AND LUG ELB ELB OO O O O (-)8.042 (-)6.905 (-)6 .905 (-)7 .918 SUSPECTED PIPE SUSPECTED PIPE SUSPECTED PIPE INTO BANK JUST DISCHARGING 1/ 2 SILTED ~8" PIPE INTO DI. SPRING FLOW FROM LIVE FLOW 1' BASE LIVE FLOW 1' BASE @ OUTLET BIG SCOUR PERCHED 5' 2:1 2' BASE PERCHED 0.5' 3:1 2' BASE 2' DEPTH NO FLOW EROSION RDY DRN STANDING WATER (DIRECTION ONLY) ~8" CMP ENF C C C C C C C C F C C FC C C C C C C C C F F F F C C C C C C C C FFFFFFFFFFFFFFFFFFFFFF F 2460 2470 24702 4 8 0 248024802490 2490249024902490 2500 25002500250025002510 25102510 2510251025102510 252025202520 2520 252025202520 2530 25302 5 30 25 302530253025302 5 3 0 2540 25402540 2540 2540 25402540 25402540 25502550 25502550 2550 2550 25502550 255025502560 2560 25602 5 6 0 2560 256025602560 25602 5 6 0 2570 2 5 7 02570 257025702 5 7 0 2570 257025702570 2 5 7 0 2580 25802580 2580 258025802580 2580 25802580 25802 5 8 0 2 5 9 0 25902590 2590 25902590 25902590 25902 5 9 0 2590 2600 2600 26002600 2600 2600 2600 26002600 2 6 0 0 2 6 1 026102610 26102610 2610 26102610 2610 2 6 1 0 26102620 2 6 2 026202620 26202620 2620 2620 2620 2620 2 6 2 0 26202630 2630 2630 2630 26302630 2630 2630 26302630 2 6 3 0 263026402640 2640 2640 264026402640 2640 2640 2640 2640 2640 26402650 26502650 2650265026502650 2650 2650 2650 265026502650 2 6 5 0 2660 2660 2660 2660 2660 26602660 2660 26602660 2660 2670 2670 2670 2670 2670 26702670 2 6 7 0 2670267026802680 26 8 0 2680 26802680 2680 2680 26902690 2690 2690 26902690 2690 2690 270027002700 27002700 27002700 2710 2710 2710 2710271027102710 2720 2720 2 7 2 0 27202720 2720 2 72027302730 2730 2730 2730 2730 27402740 2740 27402750 275027502760 27602770 2770278027802790 2800 NAD 83/ 2011 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_38.dgnUser:zrichard8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A-0009CC 38 HYDRAULICSROADWAY DESIGN CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS MATCH TO SHEET NO. 37MATCH LINE STA -L- 456+00.00FOR -L- PROFILE, SEE SHEET NO. 70 MATCH TO SHEET NO. 39MATCH LINE STA -L- 470+00.0008070605040302010001020236' TYP +96.23GREU TL-3 GREU TL-3 TYPE B-77 T = 275.02' PI Sta 456+91.51 L = 515.75' R = 600.00' D 8'FDPS 8'FDPS 12'12'12' -L- PT 459+32.23 0201010002030436' TYP+71.7524'0220'R 30'R -Y2- PT 27+50.52END -L- STA. 456+25± BEGIN -L- STA. 453+25± W/CONCRETE DITCH PROP. RETAINING WALL #24 8'FDPS 8'FDPS460465 470-L- PC 469+39.75 +65360.36' TAPER END -L- STA. 471+75± BEGIN -L- STA. 468+75± W/CONCRETE DITCH PROP. RETAINING WALL #25 8'FDPS PROP. DRIVE SI GNSI GNBL-69 MTL MTL SIGN SIGN MTL GPS-19 SIGN SIGN SIGN BST SHOULDER SIGN SIGN SIGN SIGN MTL MTL SOILSOI LSOI LSOIL SOIL SOIL SOIL S OIL NC 143 (SWEETWATER RD.) 24' BST WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS ALLEN H. LAKEY DB 189 PG 493 DB 96 PG 738 TRACT N-668 U.S. FOREST SERVICE U.S. FOREST SERVICE TRACT N-668 DB 96 PG 738 ALLEN H. LAKEYDB 189 PG 493SBHWB X456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 D B 4"CONCINV=2545.81' HWCONCINV=2605.09' DI INV=2588.34' TOP=2590.56' CONC INV=2585.98' CONC 24" CMP HW CONC INV=2529.07' INV=2538.16' 18" CMP INV=2543.48' CONC CONC 36" CMP INV=2496.38' 18" CMP12" CMPDIRECTION 36" CMP 1 5 " CMPHWCONC -L- CURVE DATA SE = 0.08 DS = 45 MPH PI Sta 470+84.26 L = 285.61' T = 144.51' R = 760.00' D SE = 0.04 DS = 45 MPH (ELBOWS)WITH GASKETS ROD AND LUG 18" RCP-IVHERE FOR CONSTRUCTION? IF SO INVERT=2445.0TO DISCUSS AT CFI: BETTER TO INSTALL 2GI SEE DETAIL 40CRETAINING WALLCONC. DITCH BEHIND REMOVE HW3801 (Top Wall) 2GI 3803 3802 RCP-IV 18" 110 TONS (KEYED-IN) CLASS II RIPRAP 3804 3805 25 TONS (KEYED-IN) CLASS I RIPRAP GTD AND LI NE WI TH CI PPRETAI N 36" CMPHW RETAIN 36" CSP JB w/MH 3806 3807 3808 3809 Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH -L- STA. 461+50 TO STA. 464+00 LT Min. D= 1.0 Ft. DETAIL 38A Slope Ditch Front Ground Natural SEE DETAIL 38A SPECIAL CUT DITCH L S etc. GI 4:1 8 :1 ( Not to Scale) FALSE SUMP 2.0' -L- STA. 466+63 RT -L- STA. 464+64 RT DETAIL 38C Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch 8:1 4:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP 2' DETAIL 38B Traffic Flow Outside Ditch 1.0' Max.0.5' Min.etc. GI -L- STA. 464+64 LT C Proposed Ditch SEE DETAIL 38B FALSE SUMP SEE DETAIL 38C FALSE SUMP SEE DETAIL 38C FALSE SUMP ELB ELB2GI18" RCP-IV 2GI 18" RCP-III 18" CSP2GI 3810 3812 3817 3814 3813 3811 3815 3816AND LI NE WI TH CI PPRETAI N 36" CMPHW RETAIN REMOVE FLO WABLE FILL P PLUG P PLUG CONC. DITCH REMOVE REMOVE F L OWABL E FI L L PPLUG P PLUG ELBOWS CONC. DITCH REMOVE 2GI (Top Wall) 2GI TB 2GI TB 2GI 2GI 18" RCP-IV 18" RCP-IV 15" RCP - IV R C P-I V 15" 4 TONS, 10 SY GEO CLASS I RIPRAP 12 TONS (KEYED-IN) CLASS I RIPRAP SEE DETAIL 38D RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 38D RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -L- STA. 468+75 TO 470+00 LT (XX SY) -L- STA. 456+00 TO 456+25 LT (XX SY) DETAIL 38D BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' DO NOT BURY INVERT INVERTDO NOT BURY 15" RCP-IV XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 38F BANK STABILIZATION XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 38E BANK STABILIZATION ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=12 Ft. DETAIL 38F KEYED-IN (TYP.) CLASS II RIP-RAP -L- STA 468+04 RT ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=12 Ft. DETAIL 38E KEYED-IN (TYP.) CLASS I RIP-RAP -L- STA 458+35 RT (20 LF) SEPERATED PIPE REMOVE OO OO (-)7.918 (-)6.309 (-)6.309 (-)8.468 (-)8.468 (-)8.647 CARVE R BRANCH CARVER BRANCH CARVE R BRANCH BRANCH ( S BC)UT T O CARVE R BRANCH (SBC)UT TO CARVER BRANCH ( S BC)UT T O CARVE R BRANCH (SBH)UT TO CARVER CARVER BRANCH COBBLES & SOME SILT.BOULDERS WITH SAND, AT VISIT. 2.5' TO 3.5' BASE. 0.2' FLOW DOWN ROCKS FLOW STRAIGHT BERM DITCH ACTING AS OLD ROAD 0.2' 4.0' 3' 2:1 2:1EXISTING CHANNEL NOTE: JURISDICTIONAL STREAM PERCHED 5' LIVE FLOW ~3' IN HOLE PIPE SEPARATED BUSTED / FAILING CONC DITCH CONCRETE DITCH WATER GOING UNDER BUSTED CONCRETE 0.2' FLOW 8' WIDTH 0.2' FLOW 3' BASE 2:1 C C F C F F C F C F C F C F C F C F C F C F F F C F C F C F C C C F CC C C C C C FF C F C F F C C C C C C C C C C CC 244024502460 2460246024602460 24602470 247024702 4 7 0 2470 2480 24802480248024802480 2490 2490 249024902490249024902 49 0 2490 2500 2500 25002 5 0 0 250025002500 25002500 25002510 2510 25102510251025102510 2510 25102510 2510251025202520252025202520252025202520 2 5 2 0 25202520 2520 25202520 2520252025202520 253025302530253025302 5 3 0 25302 5 3 0 253025302530 2530 253025302530 2530 2540254025402540254025402540 254025402 5 4 0 254025402540 2540 254025402540 2540 2 5 4 0 25502550255025502550255025502 5 5 0 2550 2550255025502550 2550 25502550255025602560 2560256025602560 25602560 256025602560 2560 25602560256025702570257025702570 25702 5 7 0 2 5 7 0 257025702570 257025702580258025802580 2 5 8 02580 2 5 8 0 2580 25802 58 025802590259025902590 259025902590 2590 259025902590260026002600260026002600 2600 2 6 0 0 2 6 0 0 261026102 6 1 0 26102610 2 6 10 2610 2610 2610 2620262026202620 2620 2620 2620263026302630 2630 2630 263026402640 2640 2640 2 6 4 0 26502650 2650 2660 2660 266026602670 26702680NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_39.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 38 MATCH LINE STA -L- 470+00.00SHEET NO. 40MATCH TO -Y2- 26+00.00MATCH LINE STAA-0009CC 39 FOR -L- PROFILE, SEE SHEET NO. 71 FOR -Y2- PROFILE, SEE SHEET NO. 71 5,200 3,790 3,300 2,600 4,300 3,330 2045 ADT 2022 ADT -NC- NC 28 AVERAGE DAILY TRAFFIC -L- NC 143-Y2- NC 28 1,000 7402,900 1,9301520 250 7 08070605040302020304050607080620790 6 0 5 0 4 080 3 0 2 0 1 0 0 0 0 0 1 0 2 0 3 0 4 0 5 06070830' TYP +9 3. 1 3 36' TYP +76.333 6' TY P +10.38G R E U T L -3TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 GREU TL-3 00000 3 0102030401 02 03 TYP E B-7 7GREU TL- 3 2 5' TYP+25.36PI Sta 11+99.45 D L = 394.94' T = 199.45' R = 1,145.92' PI Sta 18+27.84 D L = 301.00' T = 156.51' R = 445.00' PI Sta 25+91.41 D L = 320.13' T = 161.02' R = 1,200.00' -Y2- CURVE DATA -Y2- PT 13+94.94 -Y2- PC 16+71.33 -Y2- PT 19+72.33 -Y2- PC 24+30.38 -Y2- PT 27+50 .52 -Y2- STA. 12+60.00 BEGIN CONSTRUCTION TO EXIST.100' TAPER +6 0 1 2' 1 2' 1 2'24'REPAT PORD ENAL '045 0 5 +09+REPAT '00109+12'12'20'R 20'R 24'100'R+91.724 0'R 12'+94.3465'RCONCRETE BARRIER SINGLE FACED CONCRETE BARRIER SINGLE FACED 12'8'FDPS 4'FDPS 8'FDPS 8'F DPS 8'F DPS 470-Y2- POT 23+00.94 -L- POT 474+31.52 = -L- PRC 472+25.36 REPAT '6 3.0 63 100' T AP E R+5012'24'END -L- STA. 471+75± BEGIN -L- STA. 468+75± W/CONCRETE DITCH PROP. RETAINING WALL #25 24'+97.82 1 2' 8' R E PAT '8 8 .631 '2177.93+ END -Y2- STA. 16+25± BEGIN -Y2- STA. 14+75± W/CONCRETE DITCH PROP. RETAINING WALL #39 END -Y2- STA. 18+60± BEGIN -Y2- STA. 16+75± W/CONCRETE DITCH PROP. RETAINING WALL #40 DEPTH POSTS USE EXTRA DEPTH POSTS USE EXTRA -L- STA. 474+19.52 END CONSTRUCTION -L- PT 473+57.8136' D R 12'12'12'8'FDPS8'FDPSAREA LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE ISLAND & PARKING SEE DETAIL SHT 2B- FOR CONCRETE ISLAND LAYOUT BY27-119 GATE BY27-120 G P S -20GAR. BRICK 1 S ROCK DCONCCONCC ONC2 S B R IC K D B B Q R O C K G R B S T P A R K IN G C O N C IS LA N D B S T S H O U LD E R S IG N S IG N MTLM T L BY 27-121WOODS WOODS W O O D S W O O D S W O O D S N 56°17'20" W 168.67' A L UM . P IP E )(U S F S T R A C T N -668C O R N E R #6E IP W O O D S W O O D S DI SHSAT.S 28°27'14" W541.91'S 89°18'48" W234.11'N 77°13'15" W134.63'NC 28 (FONTANA RD.) 24' BST N C 28 (FO N TA N A R D.)24' B STNC 143 (S WE E T WAT E R RD.) 2 4' BSTN 62°15'38" W 153.99'36.27' N 28°59'19" W S 32 °55'42" W49 .53' D R A IN L IN E S T A N K S E P T IC KATHY D. BRUCE, ET AL DB 242 PG 80 BARBARA LAKEY DB 189 PG 490 DB 242 PG 80 KATHY D. BRUCE, ET AL U.S. FOREST SERVICE TRACT N-668 DB 96 PG 738 ALLEN H. LAKEY DB 189 PG 493 WOODS WOODS WOODS WOODS WOODS WOODS SPIKE NAIL IN BASE OF 15" POPLAR -BL- STA. 470+19.00 70' LT. BM#23 ELEV. 2523.73' SEX WBWSPRING U/G STREAMSPRI NGSPRI NGSPR IN G B O X4'x4' SPRING SPRING SPR IN G SPRING 47047147247347412 13 14 15 16 17 18 19 20212223242526D B 4"INV=2538.16'TOP=2509.72'INV=2507.62'DICONCINV=2504.24'18" CMP HWCONC INV=2452.86' 18" CMP INV=2459.13' HWCONC INV=2457.57' 36" CMP INV=2479.77' 18" CMP INV=2491.99' HWCONC T O P =2515.07'CONCCONCHWCONCINV=2497.27' I NV=2495.36'18" CM PC IS T E R N GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 SE = 0.08 SE = 0.08 DS = 55 MPH DS = 40 MPH DS = 60 MPH SE = 0.08 PI Sta 470+84.26 L = 285.61' T = 144.51' R = 760.00' SE = 0.04 DS = 45 MPH -L- CURVE DATA D PI Sta 473+03.33 L = 132.45' T = 77.97' R = 100.00' D DS = 20 MPH SE = 0.03 XX TONS, XX SY GEO CLASS B RIP-RAP XX TONS, XX SY GEO CLASS B RIP-RAP XX TONS, XX SY GEO CLASS B RIP-RAP 2GI XX TONS, XX SY GEO CLASS B RIPRAP SEE DETAIL 39C TOE PROTECTION SEE DETAIL 39E FALSE SUMP SPRING BOX6" PVC 6" P VC DI 3901 3902 3903 3904 3GI 24"DRAIN GRADE TO GTD 3921 3920 6" PVC 18" 3908 3909 SPRING BOX 3910 15" 30" 30" RCP-IV 30" RCP-IV 36" RCP-IV SPRING BOX 3905 3906 3907 3911 3912 3913 11 TONS, NO GEO CLASS I RIPRAP 2:12:1 D ( Not to Scale) STANDARD 'V' DITCH SEE PFL FOR CHANNEL CHANGE GRADE (17.5%) -Y2- STA 18+80 TO 18+91 LT Min. D=1.0 Ft. DETAIL 39B Ground Natural Ground Natural GTD 2 TONS, 7 GEO CLASS B RIPRAP SEE DETAIL 39A SPECIAL CUT DITCH (TO DISCUSS AT CFI) ENGINEER PRIOR TO ORDERING STRUCTURE #3904. ELEVATION & DIMENSIONS & COORDINATE WITH CONTRACTOR TO FIELD VERIFIY UNDERGROUND STREAM DDE=XX CY SEE DETAIL 39B STANDARD 'V' DITCH TB 2GI-A TB 2GI-A TB JB w/MH A N D LI NE WIT H CIPP RET AI N 36" C MP SEE DETAIL 39D RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 39D RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 39D RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -Y2- STA. 16+75 TO 18+60 LT (XX SY) -Y2- STA. 14+75 TO 16+25 LT (XX SY) -L- STA. 470+00 TO 471+75 LT (XX SY) DETAIL 39D BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' 3:1 D3:1( Not to Scale) SPECIAL CUT DITCH SEE PFL FOR DITCH GRADE (9.0%) -Y2- STA. 13+73 TO 14+50 LT DETAIL 39A Min. D=1.0 Ft. Ground Natural Slope Ditch Front (Top Wall) 2GI 2GI 2GI 3918 3917 3916 3915 3914 15" RCP-IV15" RCP-IV1 5" XX TONS, XX SY GEO CLASS B RIPRAP SEE DETAIL 39C TOE PROTECTION 2GI TB -Y2- STA. 22+75 TO 26+45 LT -L- STA. 471+75 TO 472+50 LT Fill Slope2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner=Class B Rip-Rap b DETAIL 39C Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 2GI-A 2GI-A 2GI-A L S etc. GI 5:1 10 :1 ( Not to Scale) FALSE SUMP 2.0' -Y2- STA. 25+39 RT DETAIL 39E Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch P PLUG P PLUG 2GI-A TB FLOWABLE FILLREMOVE 15 LF REMOVE HW REMOVE P PLUG P PLUG REMOVE 12 LF REMOVE 16 LF REMOVE P PLUG P PLUG REMOVE HW FILLFLOWABLE DO NOT BURY INVERT 3919 2GI-A TB 24" RCP-IV 24" RCP-I V24" 15"DIRECTED BY ENGINEER. CONTRACTOR TO LOCATE AS AS DIRECTED BY ENGINEER. CONTRACTOR TO LOCATE ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=12 Ft. DETAIL 39F KEYED-IN (TYP.) CLASS I RIP-RAP -Y2- STA 13+06 LT XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 39F BANK STABILIZATION 36" RCP-IVO TB JB w/MH 3922 24" RCP-IV2 4" RCP-I VSPRING WITH FLOWING WATER STARTS HERE. SPRING WITH FLOWING WATER BACK UG HERE. SPRING WITH FLOWING WATER BACK UG HERE. SPRING WITH FLOWING WATER STARTS HERE. RIPRAP BAD EROSION TO THE NORTH TO JOHNSON GAP BRANCH. ON 1941 QUAD MAP THIS STREAM IS SHOWN CONTINUING 2' BASE WITH 1" FLOWING WATER. PERCHED 6' PEBBLES COBBLES WITH SOME SILT. OUTLET BURIED 50%. OUTFALL STABLE. PIPE MODERATE RUST. 0.2' FLOW AT VISIT. STABLE 2' TO 4' CHANNEL LIKELY SPRING. 2 GARDEN HOSE @ VISIT. 0.25' FLOW IN PIPE AT VISIT. MODERATE TO GOOD CONDITION. HW & PIPE AGED BUT FUNCTIONING. 1' TO 2' WATERFALLS. COBBLES, SILT, CLAY& PEBBLES. BOULDERS WITH SOME 0.2' DEEP FLOW AT VISIT. 3' TO 4' WIDE CHANNEL STABLE DITCH AT LEAST 18". CROWN 0.5' ABOVE STREAMBED. THEN AT CMP INLET. CAN NOT CONFIRM SIZE, SUSPECT FROM CMP OUTLET (NOT JS-SEV). MORE FLOW MAJORITY OF FLOW D/S OF CMP OUTLET COMES TRICKLE OF FLOW AT VISIT. 0.5' WIDE AT BASE OF ROADSIDE DITCH WHERE CB OUTLETS TO. CLOSE TO THE BOX BUT UNSURE BOX. HEAR RUNNING WATER WHEN STAGNET WATER 3' DEEP IN 7' DEEP ENF AT VISIT. 2 GARDEN HOSE AMOUNT OF FLOW AGED 6" HDPE OUTLET AT START OF JS. MINOR PONDING AT SHOULDER 0.3' ABOVE CMP CROWN NOTABLE PONDING AT VISIT. PONDED WATER BUT NO FLOW 1' BASE, ERODED 1' TO 2' DEEP EROSION THROUGHOUT. POOR CONDITION DITCH. SITE VISIT NO FLOW AT MODERATE RUST FAIR CONDITION. 18" CMP HW GC. WATER STARTS HERE. SPRING WITH FLOWING WATER BACK UG HERE. SPRING WITH FLOWING HERE. (NO PIPE). A HOLE & GOES UNDERGROUND CONFIRMED WATER FLOWS INTO SPRING BRANCH (SEW)UT TO JOHNSON GAP BRANCH JOHNSON GAP BRANCH JOHNSON GAP BRANCH (SFA)UT TO JOHNSON GAP BRANCH (SEZ) UT TO JOHNSON GAP BRANCH (SEY) UT TO JOHNSON GAP BRANCH (SEV) UT TO JOHNSON GAP BRANCH (SET)UT TO JOHNSON GAP UT TO CARVER BRANCH ( S BG) U N A B L E T O LO CA T E S T R E AM G O E S U /G BRANCH (SBG)UT TO CARVER STREAM GOES UNDERGROUND (-)8.647(+)2.399ELEV=2,511.26'-L- STA 473+94.52LOW POINT(+)8.018 (+)8.516 (+)8.516(-)0.879(-)0.879(-)5.806E L E V =2,516.07'-L - S T A 20+12.57H IG H PO IN T ELEV.=2516.07-Y2- 20+12.57HIGH POINTF F F F F F F F F F F F F C C CCCCFCCFFF FFF F C C C C C F C C C C F C C C C C F F F FFF 2340235023502360 23602360236023602370 23702370237023702380 2380238023802380238023802390 2390 2390239023902390239023902400 2400 2400240024002400240024002410 241024102410241024102410 24102420 24202420242024202420242024202 4 2 0 2430 2430 2430243024302430243024302430243024302440 2440 2440244024402440244024402440244024402450 2450 24502450245024502450 245024502450245024502460 2460 246024602460246024602460246024602460246024602470 24702470247024702470247024702470247024702470248024802480 2480248024802480248024802480248024802 4 8 0 249024902490249024902490249024902490 250025002500250025002500250025002500 2510251025102510251025102510 2520252025202520252025302530253025302530253025402540254025402550255025502550256025602560256025702570257025702580258025802590NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 72 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_40.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MAT CH T O S HE E T NO. 4 1MATCH LI NE S T A -Y2- 4 0 + 0 0. 0 0 A-0009CC 40 MATCH TO SHEET NO. 39MATCH LINE STA -Y2- 26+00.00PAVEMENT REMOVAL 303540030405060708PI Sta 25+91.41 L = 320.13' T = 161.02' D R = 1,200.00' -Y2- CURVE DATA PI Sta 44+39.36 D L = 1,977.95' T = 1,373.12' R = 1,110.00' -Y2- PC 30+66.24 -Y2- PT 27+50.52 END -Y2- STA. 32+25± BEGIN -Y2- STA. 28+25± W/CONCRETE DITCH PROP. RETAINING WALL #31 1 2' 1 2'1 2' 8'FDPS 8'FDPS CONCRETE BARRIER SINGLE FACED 30'R 40'R END -Y2- STA. 28+75± BEGIN -Y2- STA. 26+60± PROP. RETAINING WALL #30 -Y2- STA. 27+00 TO 28+25, RT SHOULDER BERM GUTTER 00000203080706050401010232' T Y P+52.3812'12'12'8'FDPS8'FD PS8'FD PSPROP. DRIVE GR 1 S ROCK D ELECTRIC 1SBW ELECTRICELECTRICGRGR GR GRBST BST GRB Y 27-122M T L M TLM TLMTL B Y 27-123M T L BY27 -124 MTL MTL MTL MTL BY27-125 GR GR GR2 S F BARN BY27-126 ROCK WALL ROCK WALL DECK STEPSWD SHEDROCK GR GR GR GR GR 1 S ROCK D BBQROCK GR BST W O O D S 150.00'A LLEN H. LA K EY D B 124 PG 251EXISTING R/W EXISTING R/W NC 28 (FONTANA RD.) 24' BST EIP EIP WOODSW O O D SW O O D SW O O D S W O O D SW O O D S W O O D S W O O D SWOODS WOODS WOODS WOODS WOODS WOODS WOODS DRAIN LINES TANKSEPTIC ROBERT K. NORCROSS DB 329 PG 466 BARBARA LAKEY DB 189 PG 490 ALLEN H. LAKEY DB 124 PG 251 ALLEN H. LAKEY DB 189 PG 493 ROBERT K. NORCROSS DB 329 PG 466WBVS P R ING D B 4" 2 627282930313233 34 35 36 37 38 39 40IN V =2434.77'42" C M P48" CMP H W C O N CIN V =2455.93'IN V =24 57.87'IN V = 2 453 . 3 5'18" CM P INV=2435.06' INV=2416.86' 18" CMP INV=2411.23' INV=2395.01' 36" CMP H W C O N C HW CONC HW CONC GREU TL-3 TY PE B -7 7 GREU TL-3 SE = 0.08 DS = 60 MPH SE = 0.08 DS = 55 MPH TYPE B-77G R E U T L -32GI 2GI SEE DETAIL 40D FALSE SUMP SEE DETAIL 40D FALSE SUMP BDO SPEC DSN HW JB w/MH ELB ELB 2GI-A 42" DDE=XX CY SEE DETAIL 40B BERM 'V' DITCH ( Not to Scale) 2: 1 2:1 D2:1b d DETAIL 40B XX TONS, XX SY GEO Type of Liner=Class I Rip-Rap Ground Natural RDWY GEOTEXTILE b=5.0 Ft. Max. d=2.5 Ft. Min. D=3.0 Ft. SEE PFL FOR DITCH GRADES -Y2- STA. 39+00 TO 40+00 RT BERM 'V' DITCH DDE=XX CY SEE DETAIL 40B BERM 'V' DITCH ELB (ELBOW) WITH GASKETS ROD AND LUG SEE DETAIL 40D FALSE SUMP 4021 4020 DDE=XX CY SEE DETAIL 40A LATERAL 'V' DITCH 18"18"18"(ELBOWS) WITH GASKETS ROD AND LUG HW JB w/MH ELB ELB 4013 4014 4015 4016 4017 4018 4019 Wall) (Top 2GI 18" RCP-IV 18" RCP-IV (Top Wall) 2GI 18" RCP- I VELB ELB GASKETS (ELBOWS) ROD AND LUG WITH 18" RCP-IV 18" CSP4007 4008 4010 4009 4011 4012 THIS SIDE OF ELBOW MAX 0.5% PIPE SLOPE ELB ELB 4001 48" RCP-IV48"ELBOWS MAX 1% PIPE SLOPE THIS SIDE OF ELBOW HERE FOR CONSTRUCTION? IF SO INVERT=2445.0 TO DISCUSS AT CFI: BETTER TO INSTALL 2GI 4 2 " CS P 4005 4006 4003 4002 4004 AND LINE WITH CIPPRETAIN 42" CMP48" CSP TB 2GI TB 2GI TB 2GI TB 2GI SEE DETAIL 40C RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -Y2- STA. 28+25 TO 32+25 RT (XX SY) DETAIL 40C BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' LATERAL 'V' DITCH ( Not to Scale) D2:12:1 b 1"/Ft. SEE PFL FOR DITCH GRADE (1.4%) -Y2- STA. 32+40 TO 32+63 RT b=2 Ft. Min. D=1.5 Ft. DETAIL 40A Ground Natural Slope Fill L S etc. GI 4:1 8 :1 ( Not to Scale) FALSE SUMP 2.0' -Y2- STA. 39+63 RT -Y2- STA. 35+62 RT -Y2- STA. 34+12 RT DETAIL 40D Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch PPLUG PPLUG FILLFLOWABLE REMOVE HW P PLUG PPLUG P PLUG PPLUG FLOWABLE FILL FLOWABLE FI LLREMOVE HW REMOVE HW SEE DETAIL 38CFALSE SUMP2 TONS, 7 SY GEO CLASS B RIPRAP 3 TONS, 10 SY GEO CLASS B RIPRAP DO NOT BURY INVERT DO NOT BURY INVERT DO NOT BURY INVERT SEE DETAIL 40E FALSE SUMP FS 2:1 2:1 S=Toe of Slope S ( Not to Scale) FALSE SUMP DETAIL 40E Traffic Flow Outside Ditch -L- STA. 36+50 RT TOE OF FILL 1.6'SMIN. ELEV=2424.5 XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 40F BANK STABILIZATION ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=14 Ft. DETAIL 40F KEYED-IN (TYP.) CLASS II RIP-RAP -Y2- STA 27+46 LT INVERT DO NOT BURY GASKETS (ELBOWS) ROD AND LUG WITH 3 TONS, NO GEO CLASS B RIPRAP ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=16 Ft. DETAIL 40G KEYED-IN (TYP.) CLASS I RIP-RAP -Y2- STA 35+57 LT XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 40G BANK STABILIZATION XX TONS, NO GEOCLASS II RIPRAPSEE DETAIL 38FBANK STABILIZATIONO O O O OO CLASS B RIPRAP SEE DETAIL 39C TOE PROTECTION 24" CSPw/MH TB JB 4022 RC P -IV 2 4 " 4 TONS, 7 SY GEO CLASS I RIPRAP BRANCH (SBC)UT TO CARVER BRANCH (SBC)UT TO CARVER CARVER BRANCH CARVER BRANCH CARVER BRANCH C AR VE R B R ANC H UNK. SIZE PIPE WITH SLIGHT RUST. OLD BUT FUNCTIONING PERCHED 6.5' DOWN DRIVE DITCH FLOWS PERCHED 9' BOTTOM OF 18" CMP RUSTED BAD EROSION DRIVEPIPE VERY RUSTED PERCHED 7.5' 42" CMP OUTLET 2.5' WIDE CHANNEL 6' TO PERCHED 6' FLOWING WATER 4' BASE WITH ~2" CONC. HW HAS CRACKS. 42" CMP OLD BUT FUNCTIONING. 1' BASE DITCH, 3' DEEP 0.5' BLOCKED 0.5' BLOCKED COBBLES & SOME SILT. BOULDERS WITH SAND, AT VISIT. 2.5' TO 3.5' BASE. 0.2' FLOW SLIGHT EROSION CONDITION. SOME RUST MODERATE TO GOOD BUSTED / FAILINGCONC DITCHCONCRETE DITCHWATER GOING UNDERBUSTED CONCRETE0.2' FLOW3' BASE2:1(-)5.806(-)6.941(-)6.941(-)5.369(-)5.369(-)7.836CFFCCCCCCC C F F C C C C C F F F F F C C C C F F CCCFFCCCCCFCFFC C C F F F F F F F F F F F F F FF 2230223022402240 2250226022602270227022702280 228022802290 22902290229022902290 2300230023002300230023002300 230023102310231023102310 2310 2310231023102320232023202320 23202320 23202320232023302330 233023302330233023302330233023402340234023402340 234023402340234023502350235023502350 2350235023502350235023602360236023602360236023602360236023602370237023702370237023702370237023702380238023802380238023802380238023802380239023902390239023902390239023902390239023902400240024002400240024002400240024002410241024102410241024102410241024202420242024202420242024202420 24302430243024302430244024402440244024402440 2450245024502450245024602460246024602470247024702480248024902500 NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_41.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 40MATCH LINE STA -Y2- 40+00.00A-0009CC 41 MATCH TO SHEET NO. 4 2MATCH LI NE STA -Y2 - 5 4 +0 0. 0 0 -Y2- CURVE DATA PI Sta 44+39.36 L = 1,977.95' T = 1,373.12' R = 1,110.00' D FOR -Y2- PROFILE, SEE SHEET NO. 72 PAVEMENT REMOVAL 4045500 2 0 2 0 1 0 0 0 1 0 2 0 3 0 4 0 5 06 070836' TYP +48.19GREU TL-3 GREU TL-3 -Y2- PT 50+44.19 PI Sta 70+28.18-Y2- CURVE DATA 8'F DP S 8'F DP S 12'12'12'ASPHALT DRIVE PROP. GRAVEL DRIVE PROP. DRIVE REALIGN SOIL 1 2' 1 2' 1 2' SOIL DRIVE PROP. SOIL DRIVE PROP. 8'FDPS 8'FDPS60'R25'R20'R 20'R 15'R 8'R10'R5'R-Y2- STA. 51+25 TO 57+76±, RT EXPRESSWAY GUTTER -Y2- STA. 47+50 TO 52+57, LT SHOULDER BERM GUTTER BY OWNER RELOCATE GATE DB 329 PG 466 ROBERT K. NORCROSS MTL MTL MTL MTL MTL MTL MTLGRBSTGRWAL LCONCC O N C 1 S R OC K D SHEDGRBSTSHED 1 S F DDEC K WS OI LGATE S OI LS OI LSOI LSOILSOIL BSTB Y 27-127BY27-128 BY27-129 SOIL SOIL BY 28 -153 BY28-154 SPIKE NAIL IN BASE OF 13" TRIPLE POPLAR -BY28- STA. 8+11.00 2' LT. BM#37 ELEV. 2238.93' S IG N NC 28 (FONTANA RD.) 24' BST EIP EIP EIP EIPWOODSWOODS W OODSWOODSWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS COULD'NT FI ND TANKPOSI BLE DRAI N FI ELDJOHN M. STUART, III DB 216 PG 210 DAVID M. HOLDER DB 302 PG 398 OWNER UNKNOWN DB 204 PG 740 BARBARA LAKEY ROBERT K. NORCROSS DB 329 PG 466 DB 178 PG 650 DANNY K. JORDAN DB 330 PG 600 DB 282 PG 705 (DB 185 PG 131) BROTHERS, LLC CREWS RUSTEE, ET AL JAMES P. EWING, SPIKE NAIL IN BASE OF 30" POPLAR -BY27- STA. 44+90.00 30' RT. BM#30 ELEV. 2373.76' S P R IN G SPRING SPRING SPRING SPRING SFOSFH SFSSFSSFTSFR SFPSFQSFTSFJ40 4 1 42434 4 45 46 47 48 49 50 51 52 53 54 vvIN V =2362.05'24" CM P12 " HDPEIN V =2355.17'T O P =2359.05'IN V =2355.35'D I24" CMPIN V =2339.90' INV=2298.79' 15" CMP HW C O N C H W R O C K INV=2277.75' INV=2291.68' INV=2294.07' HWCONC HWCONC 18" CMP SE = 0.08 DS = 55 MPH AT-1 2GI-A 54"42"2GI-A 36"54" CAAPRETAIN (ABANDON)BDO SPEC DSNREMOVEREMOVE HW FLOWABLE FILL REMOVE DI ELB ELB ELB XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 41A STANDARD BASE DITCH SEE DETAIL 41E FALSE SUMP FS 15" GTD XX TONS, XX SY GEO CLASS I RIPRAP CUT TO FILL TRANSITION DRAIN GRADE TO 2GI XX TONS, XX SY GEO CLASS B RIPRAP CUT TO FILL TRANSITION JB w/MH BDO MIN 1.5% PIPE SLOPE THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE THIS SIDE OF ELBOW ROD AND LUG WITH GASKETS (ELBOWS) 2GI-A 2GI-A 42"4 2" DRAIN GRADE TO 4101 4102 4103 4104 4105 4106 ROD AND LUG WITH GASKETS (ELBOW) 4107 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d DAYLIGHT AT 3.5% SLOPE -Y2- STA. 44+80 TO 44+83 LT DETAIL 41A B=5 Ft. Max. d=3 Ft. Min. D=3 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner=Class II Rip-Rap ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR -Y2- STA. 48+00 TO 50+50 LT DETAIL 41B Type of Liner=Class I Rip-Rap d=1.5 Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE XX TONS, XX SY GEO CLASS B RIPRAP ELB ELB (ELBOWS) WITH GASKETS ROD AND LUG THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE 1 5 " 4113 4112 6" PVCSPRING BOX 4118 2GI 1 8 "18" RCP-IV(ELBOWS) WITH GASKETS ROD AND LUG ELB ELB 4117 4116 4115 4114 (ELBOW) WITH GASKETS ROD AND LUG ELB XX TONS, XX SY GEO CLASS I RIPRAP SEE DETAIL 41B TOE PROTECTION 4108 4110 4111 JB w/MH HW 42"AND LINE WITH CIPPRETAIN 42" CMP4109 TB 2GI GTD48" CSPDDE=XX CY XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 41C CHANNEL CHANGE b 2:1d D ( Not to Scale) B CHANNEL CHANGE 1"/Ft. SEE PFL FOR CHANNEL CHANGE GRADE -Y2- STA. 52+00 TO 53+00 LT -Y2- STA. 46+95 TO 49+50 RT Ground Natural b=5 Ft. B=5 Ft. Min. d=2 Ft. Min. D=2 Ft. Type of Liner=Class II Rip-Rap DETAIL 41C Ground Natural Exist. Channel Fill Slope Proposed KEYED-IN (TYP.) CLASS II RIP-RAP DDE=XX CY XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 41C CHANNEL CHANGE XX TONS, XX SY GEO CLASS B RIPRAP SEE DETAIL 41D TOE PROTECTION -Y2- STA. 49+50 TO 50+00 RT Fill Slope2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner=Class B Rip-Rap b DETAIL 41D Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 18"BACKFILL COMPACTED CHANNEL W/ FILL EXISTING P PLUG P PLUG REMOVE REMOVE P PLUG P PLUG REMOVE HWFILLFLOWABLE FS SEE DETAIL 41E FALSE SUMP L S etc. GI 5:1 10 :1 ( Not to Scale) FALSE SUMP 2.0' -Y2- STA. 44+00 RT -Y2- STA. 41+38 RT DETAIL 41E Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch DO NOT BURY INVERT DO NOT BURY INVERT INVERT DO NOT BURY Min. d = 3 Ft. Le n gth = 16 Ft. O O O(-)7.836(-)8.119(-)8.119 (-)7.983 CARVER BRANCH BRANCH (SBD)UT TO CARVER CARVER BRANCH CA RV ER BRAN CH BRANCH (SBD)UT TO CARVER BRANCH (SFH)UT TO CARVER BRANCH (SFH)UT TO CARVER BRANCH (SFP)UT TO CARVER BRANC H (S F P )UT T O CAR VE R BRANCH (SFS) UT TO CARVER 15" HDPE 15" CMP15" C M P WOULD OT AND FLOW TO 24" CMP. PONDED WATER BEHIND A 1' TO 1.5' TALL BERM. 1" FLOW 2' BASE CHANNEL FROM HERE. SEEMS MOST OF JS FLOW SPRING OUT OF BANK HERE. 1" TO 2" FLOW 3' TO 4' BASE CHANNEL RUSTED BOTTOM. 24' CMP PERCHED 6.5'. 6" FULL OF WATER. 4.5' BELOW 24" INV. 6" HDPE OUT OF BANK INLET CRUSHED. 15" OR 18" CMP. 0.5' OPEN. VERY RUSTED. ROCK CHECKS 2' TO 3' DEEP WITH SAND AND COBBLE IN CHANNEL. 4' WIDE CHANNEL EXPANDS TO 8' WIDE CHANNEL. WITH SAND AND COBBLE STONES. STABLE 7' WIDE TO 12'(WIDEST) CHANNEL STABLE GC AS THRU 24". FLOW AT VISIT ~SAME PERCHED 0.8'. NOTABLE RUST, AGED. FAIR CONDITION. 0.1' FLOW DEPTH IN PIPE AT VISIT. GC. SOME SLIGHT RUST ALONG BOTTOM OF PIPE. STABLE 18 ' HDPE STABLE STABLE 2' BASE DITCH DEPTH AT SITE VISIT 0.1' TO 0.2' FLOW 0.1' FLOW DEPTH AT SITE VISIT BOULDERS WITH COBBLES & SOME SAND. SOME RUST VISIBLE AT BOTTOM NEAR INLET. FAIR TO DECENT CONDITION. OUTFALL. STABLE NATURAL PERCHED 0.8' PERCHED 2.5' 42" CMP CMP42" 30% INLET BLOCKED CCCCCCC C C C C C C C F F F F F F F F F F C C F F F F CCCF F F F F F F F F F C C C C C C F F FFFFFFFF 213021302140 214021402150 21502150 2 1 6 0 21602160 21602160216021602160 21702170 217021702170 2170 21702170217021702170 2180 2 1 8 0 2180 2 18 0 2180 21802180218021802180 218021902190219021902190219021902190219021902200 220022002200220022002200 2 2 0 0 220022102210221022102210221022102 2 1 0 22102220 2220222022202220222022202220 2220 22302230223022302230 22302230223022302230 2230 2240224022402240 22402240224022402240 2240 22502250225022502250225022502 2 5 0 225022602260 226022602260226022602260 2270227022702270227022702280 22802280228022802280228022902290229022902290229022902300230023002300230023002310231023102310231023102320232023202320232023202330233023302330233023302340234023402340234023402350235023502350235023602360236023602370237023702380238023902400241024202430NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -DR4- PROFILE, SEE SHEET NO. 77 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_42.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 41MATCH LINE STA -Y2- 54+00.00MATCH TO SHEET NO. 43MATCH LINE STA -Y2- 68+00.00A-0009CC ENGINEER 42 FOR -Y2- PROFILE, SEE SHEET NO. 73 55606502020203040501010006070836' TYP +63.91G REU TL -3 SC R=15 ' TYPE B -77 TYPE B-77 PI Sta 70+28.18 D L = 1,307.03' T = 700.27' R = 1,470.00' -Y2- CURVE DATA -Y2- PC 63+27.9112'12'12'8'FDPS 8'FDPS -DR4- CURVE DATA -DR4- POT 10+00.00 -Y2- POC 66+35.13 = ASPHALT DRIVE PROP. 100' R 20'R 12'12'+59 . 2 1 CONCRETE BARRIER SINGLE FACED 24'24'40'R 50'R +65.57+81.5112'END -Y2- STA. 66+83± BEGIN -Y2- STA. 59+00± PROP. RETAINING WALL #32 END -Y2- STA. 66+02± BEGIN -Y2- STA. 63+75± W/CONCRETE DITCH PROP. RETAINING WALL #33 -Y2- STA. 51+25 TO 57+76±, RT EXPRESSWAY GUTTER -Y2- STA. 67+00 TO 70+50, RT SHOULDER BERM GUTTER 3 1 2 3 -DR4- STA. 11+10.00 END CONSTRUCTION +01 .29 +36.93 +28.368'8' -Y2- STA. 58+95 TO 63+22, LT SHOULDER BERM GUTTER DB 211 PG 718 ROBERT PEASE MTL MTL MTL MTL MTL MTL MTL MTL MTL MTL MTL MTL MTL M T L BY27-132BY27-131BY27-130 BY28-155 BY28-156 BY28-157BY28-158BY28-159 SPIKE NAIL IN BASE OF 26" POPLAR -BY27- STA. 68+35.00 30' LT. BM#31 ELEV. 2178.05' EIP EIP EIP NC 28 (FONTANA RD.) 24' BST 30.00' EUGENE R. WIECZOREK DB 260 PG 239 CREWS BROTHERS, LLC DB 282 PG 705 (DB 185 PG 131) DB 282 PG 705 BSTBSTGR GR BST GR BST GR 2 S F BARN 60" ROCK WALL BST BST BS TVI VI A L N. (P V T.) GR STEVE DR. (PVT.)SR 1239 CARVER BRANCH LN.STECOAH HGTS.MTL RAILBST BUS 1 S F CONC BARN ROBERT K. NORCROSSWOODSWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS JAMES P. EWING, TRUSTEE, ET AL DB 178 PG 650 (DB 185 PG 131) CREWS BROTHERS, LLC ROBERT K. NORCROSS DB 334 PG 306 DB 334 PG 309 ROBERT K. NORCROSS DB 326 PG 483 DB 195 PG 244 DB 266 PG 26 DEAN A. HORNING BY27-133 54 55 56 57 58 59 60 61 62 63 64 65 66 67681011D B 4" SPRING BOX SPRING BOX SPRING SFN SFI SFV SFH SFK SFLSFI SFM INV=2157.37' INV=2158.46' INV=2156.77' HW ROCK INV=2161.91' INV=2267.75' INV=2264.98' 24" CMP HW CONC 18" CMP 15" HDPE 15" CMP 18" CMP 18" CMP C U L3 C U L4 C E 2 H W2 C U L 1 C U L2 H W1 C E1 INV=2220.01' 24" CMP HW CONC INV=2184.69'IN V =2152.44'TO P=2155.79' CONC BOX CULVERT 6 'X6 ' SINGLE BARREL A T-1A T-1SE = 0.08 DS = 60 MPH 2 1 PI Sta 11+22.09 D L = 45.71' T = 22.92' R = 250.00' PI Sta 10+77.95 D L = 43.11' T = 21.90' R = 100.00' -DR4- PC 10+56.06 -DR4- PT 11+44.88 -DR4- PRC 10+99.17 -DR4- POT 12+00.26 BDO 2GI 2GI2GI15" RCP-IV 24" CSP24"(ELBOWS) WITH GASKETS ROD AND LUG ELB ELB XX TONS, XX SY GEO CLASS B RIPRAP 4201 4203 4202 4204 15"4205 4206 2 TONS, 7 SY GEO CLASS B RIPRAP -Y2- STA. 58+49 TO 59+18 RT Fill Slope2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner=Class B Rip-Rap b DETAIL 42B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile DDE=XX CY XX TONS, XX SY GEO SEE DETAIL 42C LATERAL 'V' DITCH DDE=XX CY SEE DETAIL 42D LATERAL 'V' DITCH COLLAR AND EXTEND 4207 4208 4209 AND LINE WITH CIPPRETAIN 24" CMP XX TONS, XX SY GEO CLASS B RIPRAP SEE DETAIL 42B TOE PROTECTION DDE=XX CY SEE DETAIL 42A BERM 'V' DITCH 2GI 2GI 2GI 15" 15" 15" RCP-IV 4210 4211 4212 4213 4215 24"2GI (Top Wall) 15" RCP-IV 4214 15" RCP-IV 4217 FRAME & COVER w/ MH 7' DIA MH 18" R C P -IV 4216 4218 4221 4219 4222 MAINTAIN 1.5:1 FROM 10+60 TO 11+30. TYPICAL AT 10+35 TO 1.5:1 AT 10+60. SEE DETAIL SHEET 2X-X. TRANSITION FROM ROCK EMBANKMENT -DR4- 10+35 TO 11+30 LT GTD2GI15" RCP-IV TB 2GI TB 2GI SEE DETAIL 42E RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -Y2- STA. 63+75 TO 66+02 RT (XX SY) DETAIL 42E BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' HW 66" CAAP18"DDE=XX CY SEE DETAIL 42F STREAM RESTORATION (TRENCHLESS)66" WSP 2GI TB b ( Not to Scale) D1.5:12:1 BERM 'V' DITCH SEE PFL FOR DITCH GRADES -Y2- STA. 55+00 TO 55+71 RT DETAIL 42A b=2 Ft. Min. D=1.5 Ft. G roundN at ural RDWY Gr o u n dNatural Geotextile XX TONS Type of Liner=Class B Rip-Rap LATERAL 'V' DITCH ( Not to Scale) 2: 1 2:1 D b d 1"/Ft.Slope Fill Type of Liner=Class B Rip-Rap DETAIL 42C Ground Natural Geotextile b=2 Ft. Min. d=To NG Min. D=1.0 Ft. SEE PFL FOR DITCH GRADE (18.6%) -Y2- STA. 59+18 TO 59+53 RT LATERAL 'V' DITCH ( Not to Scale) D2:12:1 b 1"/Ft. SEE PFL FOR DITCH GRADE (4.5%) -Y2- STA. 59+53 TO 59+90 RT b=2 Ft. Min. D=1 Ft. DETAIL 42D Ground Natural Slope Fill E XT E NSI ON6' x 6' RCBC AT OUTLET 1@6'x6' RCBC RETAIN AND EXTEND TB 2GI 2GI TB 4220 15" R CP-IV RCP-IV 15" REMOVE HW P PLUG P PLUG FILLFLOWABLE REMOVE REMOVE P PL U G 2 TONS, 7 CY GEO CLASS B RIPRAP DO NOT BURY INVERT DO NOT BURY INVERT DO NOT BURY INVERT D ( Not to Scale) B Ground Natural Ground Natural DETAIL 42F XX TONS Type of Liner=CLASS II RIPRAP B=4 Ft. Min. D=3 Ft. Length=41 Ft. KEYED-IN (TYP.) CLASS II RIP-RAP STREAM RESTORATION SEE PFL FOR CHANNEL GRADE (4.9%) -Y2- STA 67+96(68' LT) TO 68+26(90' LT) 1.5:11.5:1 35 TONS CLASS II SEE DETAIL 42I CULVERT OUTLET CHANNEL Ground Natural Ground Natural (Variable) CHANNEL BED d KEYED-IN (TYP.) CLASS II RIP-RAP d=3 Ft. Min. Length=20 Ft.EXI ST. BANK EXIST. BANK DETAIL 42I ( Not to Scale) OUTLET CHANNEL DETAIL -Y2- STA 67+56 RT L S etc. GI 2:1 2 :1 ( Not to Scale) FALSE SUMP 2.0' -Y2- STA. 63+62 RT DETAIL 42G Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch SEE DETAIL 42G FALSE SUMPOO O O XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 42H BANK STABILIZATION ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=2 Ft. Length=8 Ft. DETAIL 42H KEYED-IN (TYP.) CLASS II RIP-RAP -Y2- STA 60+03 LT (-)7.983 (-)8.786 (-)8.786(-)8.075STABLE 1.2' BLOCKED SLIGHT RUST. PERCHED 0.5' OLD BUT FUNCTIONING WITH 0.5' DEEP. STABLE 2' TO 3' WIDE CHANNEL. 36" CMP 15" H DPE 15" HDPEFAIR CONDITION STABLE 3' WIDE CHANNEL 2' TO 3' DEEP CULVERT ON SITE VISIT. 0.15' FLOW DEPTH IN PERCHED 2.0'. SOME EROSION SLI G HT R UST.PER C HE D 3'. NO OBVIOUS ISSUES NOTES IN RECENT INSPECTION. 0.15' FLOW IN BARREL AT VISIT. RCBC APPEARS IN GC. HDPE15" STABLE CHANNEL. SAND & SOME COBBLES. BOULDERS WITH PEBBLES, SLIGHT RUST. BLOCKED 7". BOTTOM. RUSTED 4" BLOCKED. C A R V E R B R A N C H BRANCH (SBI)UT TO CARVER CARVER BRANCH CARVER BRANCH C A R V E R B R A N C H BRANCH (SBJ)UT TO CARVER CARVER BRANCH BRANCH (SFM )UT TO CARVER BRANCH (SFM) UT TO CARVER BRANCH (SFM) UT TO CARVER BRANCH (SFM) UT TO CARVER F F F F F F F F C F F F F F F F F F F F F C C C C FC FFC C F F F F F F F F F F FFFC C C C C C C C C C C C C C C FF FF 2070 207020702080 20802080 2080 208020802090 2090 2090 2090 2090 2090209020902100 2100 2100 2100 21002100 2100210021002100 2100 21102110 2110 21102110 2110 2110 21102120 21202120 212021202 1 2 0 212021202120 21302130 2130 2130 21302 130 2130 2130 21402140 21402140 2140 2140 2140 21502150 21502150 2150 21502150 21602160 2160 21602160 2 16 0 216021702170 2170 2170 2170 2170 2170 2180 2180218021802180 2190 2190 21902200 2 2 0 02200 2200 2210 2220 2230 2240NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 73 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_43.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 4 2MATCH LI NE STA -Y2 - 6 8 +0 0. 0 0 MATCH TO SHEET NO. 44MATCH LINE STA -Y2- 82+00.00A-0009CC 43 707580GREU TL-3 08070605040302010000010203040506070827 ' TYP+35.20-Y2- PC 78+67.46 -Y2- PT 76+34.95 PI Sta 70+28.18 D L = 1,307.03' T = 700.27' R = 1,470.00' -Y2- CURVE DATA PI Sta 83+84.46 D L = 962.04' T = 517.00' R = 1,060.00' 1 2' 1 2' 1 2' GRAVEL DRIVE PROP. 40'R 40'R 40'R 8'FDPS 8'FDPS 8'FDPS 8'FDPS 15'R 40' R 40 ' R 3 0'R 10'R CONCRETE BARRIER SINGLE FACED ASPHALT DRIVE PROP. END -Y2- STA. 88+25± BEGIN -Y2- STA. 77+92± W/CONCRETE DITCH PROP. RETAINING WALL #35 +93.2612'12'+52.3950 'R 80'R ASPHALT DRIVE PROP.30'R30'R12'24'REPAT '30.269 END -Y2- STA. 72+75± BEGIN -Y2- STA. 71+25± W/CONCRETE DITCH PROP. RETAINING WALL #34 -Y2A- POT 12+30.00 -Y2A- STA. 11+25.00 END CONSTRUCTION -Y2A POT 10+00.00 SOIL DRIVE PROP. -Y2- STA. 67+00 TO 70+50, RT SHOULDER BERM GUTTER TO EXISTING SLOPE MATCH PAVEMENT SLOPE NOTE: MTL BY27-134 GPS-21 G P S -2 2 BY27-135 NC 2 8 (FONTANA RD .)2 4' BST HW36" ROCK SHED 1 S FD GR GR BARNSHED WD RAIL R O C K W A L L WALLROCK WALLROCK GAR.1 S FDCONCDECKWALLCROSS TIE STEPSPATIOROCK WD RAIL WD RAIL GR GR GR C O N C B S T B S T B STSR 1226 M A R T IN JE N K IN S R D . GR GR BST WD BOARD 1 S FD BST CONCCONC GARAGE SIGN SR 1 2 2 6 STECOAH RD. S IGN 5 SBW W /LT GR SOI LBST GR GR GR CONC (ABAND.) 1 SBR D G R 3 S BWWALLROCK W ROBERT K. NORCROSS DB 195 PG 244 DB 326 PG 483 EIP EIP E IP EIP NA IL R /R SP IKE EIPSPIN D LEEIP15.00'15' R/W (PB DB PG 1865) WOODS WOODS WOODS WOODS WOODS WOODS WOOD S WOODS WOODS WOODS WOOD S WOODS WOODS WOODS WOODS WOODS DRAI N LI NESTANKSEPTIC ROBERT K. NORCROSS DB 348 PG 340 THOMAS E. SCHIESSLE DB 354 PG 449 DB 199 PG 380 RICKEY D. McCRACKEN JAMES M. JENKINS DB 326 PG 480 JOHN B. NORCROSS DB 182 PG 238 GLEN McCOY DB 331 PG 359 LESTER A. JENKINS, ET AL DB 326 PG 477 ROBERT K. NORCROSS DB 348 PG 340 DB 307 PG 915 ARNOLD D. CODY FLOYD J. CODY DB 70 PG 83 S BNWBU SPR ING SPR ING SBOD B 4" 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 vvvvvINV=2119.37 ' INV=2123.87 'HW CONC 18" CMP TOP=2156.97' INV=2151.88' DI 18" CMP DI INV=2129.58'TOP=2132.14'INV=2129.67' INV=2122.22' INV=2073.39' INV=2069.38' 1 8 " CM P INV= 2 0 7 6 .9 7' 24" C MPINV=2 0 8 8 .3 2'INV = 2 0 9 2 .8 2'INV = 2 0 9 6 .3 4'18" CMP18" CMP 18" CMP48" CMP INV=2152.44' TOP=2155.79'AT-1 GREU TL-3 GREU TL-3 SE = 0.08 DS = 60 MPH SE = 0.08 DS = 55 MPH TYPE B-77 TYPE B-77 GREU TL-3 GREU TL-3 GTD DI 2GI GRADE TO DRAIN GTD 2GI 2GI (Top Wall) GTD 15"18" RCP- I V18" RCP-IV 4301 4302 4303 4304 2GI-D XX TONS, XX SY GEO CLASS B RIP-RAP FS FS PROPOSED SYSTEM IS IN SERVICE REMOVE 42" CMP & DI AFTER SYSTEM IS IN SERVICE FILL 48" CMP AFTER PROPOSED 18" RCP-IV 4316 4317 24" RCP-IV24" RCP-IV GTD HW 18"18" 18" RCP -IV 4315 4314 4313 4305 4306 4307 4308 4309 4310 4311 4312 SEE DETAIL 43F FALSE SUMP RCP-IV18"COLLAR 42" RCP-III(TRENCHLESS)42" WSPRE MOVE REMOVE DI FLO WABLE FILL 15" XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 43B STANDARD BASE DITCH XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 43C RIPRAP AT EMBANKMENT REMOVE DDE=XX CY XX TONS CLASS II RIPRAP SEE DETAIL 43D STREAM RESTORATION24" C SPELB ELB THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE (ELBOWS) WITH GASKETS ROD AND LUG 3 TONS, 11 SY GEO CLASS B RIPRAP SEE DETAIL 43F FALSE SUMP ELB ELB ELBOW 1 8 "DDE=XX CY SEE DETEIL 43A LATERAL BASE DITCH 3 TONS, 10 SY GEO CLASS B RIPRAP TB 2GI TB 2GI w/MH TB JB SEE DETAIL 43E RETAINING WALL CONC. DITCH BEHIND SEE DETAIL 43E RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -Y2- STA. 77+92 TO 82+00 LT (XX SY) -Y2- STA. 71+26 TO 72+76 LT (XX SY) DETAIL 43E BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' 2:12:1D ( Not to Scale) STREAM RESTORATION B d -Y2- STA 78+00 TO 78+46 RT DETAIL 43D B=MatchExisting(0to4Ft) Min. d=2 Ft. Min. D=2 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner=Class II Rip-Rap KEYED-IN (TYP.) CLASS II RIP-RAP SEE DETAIL 42F STREAM RESTORATION ( Not to Scale) 4:14:1D B b LATERAL BASE DITCH 1"/Ft. SEE PFL FOR DITCH GRADES -Y2- STA. 71+00 TO 74+00 RT DETAIL 43A b=5 Ft. B=5 Ft. Min. D=1.0 Ft. Ground Natural Slope Fill 2GI-A TB 2GI-A 2GI-ATB PLUG P PLUG P PLUG PPLUGFLOWABLE FI LL(ABANDON) RETAIN REMOVE P PLUG PPLUG REMOVE 11 LF FI LLFLOWABLE REMOVE HW RETAINRETAIN P PLUG P PLUG L S etc. GI 5:1 10 :1 ( Not to Scale) FALSE SUMP 2.0' -Y2- STA. 74+15 RT -Y2- STA. 74+13 LT DETAIL 43F Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch REMOVE BURY INVERT 0.7' BURY INVERT 0.7' ( Not to Scale) RIPRAP AT EMBANKMENT Grade Ditch 1.5' Keyed-in 5'min. Type of Liner=Class I Rip-Rap -Y2- STA. 76+22 RT DETAIL 43C 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d SEE PFL FOR DITCH GRADE (0.3%) -Y2- STA. 76+08 TO 76+22 RT DETAIL 43B B=3 Ft. Min. d=3 Ft. Min. D=3 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner=Class I Rip-Rap KEYED-IN (TYP.) CLASS I RIP-RAP DI OO SLIGHT RUST. PERCHED 3'. (WIDTH VARIES 22" TO 7") CONCRETE DITCH WITH GRATE ON TOP. 18" CMP OUTLET INTO A SQUARE ALONG THIS LINK OF PIPE. FLOWING OUT OF OUTLET & SUSPECTS WATER GETTING OUT OF SYSTEM INTO THE GROUND RESIDENT SAYS SOMETIMES THE DI HAS WATER FLOWING IN IT BUT NOT AS MUCH WATER 18" CMPAROUND JOINT. 15" WAS FIT INSIDE 18" & CONCRETE PLACED BETWEEN THE 18" CMP CROSSPIPE & DI. THE PER RESIDENT THERE IS 43 FEET OF 15" HDPE IS HIGHEST HE HAS EVER SEEN WATER GET. BASEMENT (HOUSE DIRECTLY ACROSS CREEK) ONE TIME BUT THAT THIS RESIDENT HAS SEEN CARVER BRANCH GET INTO NEIGHBORS 18" H D PE HW WITH GRATE. 18" CMP BOTTOM RUSTED OUT. 54" CMP 60" CMP RUSTED 5 4 " CM P SUPPORTS THRU BARREL RUSTED & WOODEN 2-12" CMPOUTLET VERY BADILY CRUSHED BLOCKED 0.5' AMOUNT OF FLOWHOSE 6" HDPE OUTLET WITH GARDEN 15" HDPEMODEL TRAIN TRACKS 36" HDPESEVERAL YEARS AGO. REPLACED 24" WITH 36" FLOODING ISSUES SINCE HE JOHN NORCROSS SAID NO 42" MODERATE CONDITION, BOTTOM BEGINNING TO RUST. CAN'T ACCESS 42" INV TO MEASURE, ESTIMATE 6.5' TO 7.0'. 48" LIKELY INSTALLED WELL BEFORE. DI DEPTH TO 48" OUT=7.0'. 42" CMP & HOMEMADE DI INSTALLED ~25 YEARS AGO(PER RESIDENT JOHN NORCROSS). 6" PVC DEPTH TO 6" PVC INV IN=0.9' DEPTH TO 18" CMP OUT=5.3' BOX DEPTH=6.3' HOMEMADE DI BY JOHN NORCROSS. AT GRADE 6" PVC INLET 24" CMP 24" C MP PARTIALLY CRUSHED 0.1' FLOW DEPTH AT SITE VISIT. SILT W/ SAND & PEBBLES. STABLE 2'-3' WIDE BASE CHANNEL. ~2.5' BASE, 0.1' FLOW AT SITE VISIT SILT WITH SAND & PEBBLES. 6' DIAMETER SCOUR HOLE AT OUTLET. PERCHED 2' ABOVE WATER SURFACE. MODERATE CONDITION, SURFICIAL RUST. 24" OUTLET FIRE HOSE AMOUNT OF FLOW @ VISIT. OUTLETS ON BANK 1' ABOVE NWS. 1 GARDEN HOSE AMOUNT OF FLOW @ VISIT. BLOCKED 50% AT OUTLET. 18" CMP FAIR CONDITION, NOTABLE RUST. MINOR EROSION 40 LF PRIOR TO 18". DITCH APPROACHING 18" CMP: SUSPECT INV=~2079.7 PER DTM TOP DI TO INVERT=~19.8' EXISTING GROUND TO INVERT=~18.8' HOMEMADE DI OF PIPE AT INLET. 18" TREE GROWING DIRECTLY ON TOP 24" CMP MODERATELY GOOD CONDITION. 2' TO 3' OUTLET PERCHED 3.5' PERCHED OUTLET CARVER BRANCH BRANCH (SBO) UT TO CARVER BRANCH (SBP)UT TO CARVER BRANCH (SBN)UT TO CARVER BRANCH (SBJ)UT TO CARVER BRANCH (SBJ)UT TO CARVER B R AN CH (S BO )U T TO CARV E R CARVER BRANCH (-)8.075 (-)7.287 ( - )7 .287 ( - )3 .124 F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F C F F FF FF F C C F F F F C C C F F F F C C C C C C C C F F F F FC 2030 20302030203020 30203020302030 20302040 20402040 2040 20402040 20402040 2040 2050 2050 20502050 205020502060 2060 2060 2060 2 0 6 0 2060 20602060 2070 20702070 2 0 7 0 20702070 2070 2080 2080 20802080 2 0 9 0 2090 2090 2 0 9 0 20902 1 0 0 2100 2100 2100 21002110211021102110 2110 2120 21202120212021202 130 21302130 21302140 2140 2140 214021502150 21502160 2160 216021702170 2170 2180 21802180 2190 2190 21902200 22102210 2220 2230 NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 74 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_44.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A-0009CC 44 MATCH TO SHEET NO. 43MATCH LINE STA -Y2- 82+00.00MATCH TO SHEET NO. 45MATCH LINE STA -Y2- 96+00.00T = 312.11' PI Sta 93+85.36 D L = 624.07' R = 11,500.00' PI Sta 83+84.46 D L = 962.04' T = 517.00' R = 1,060.00' -Y2- CURVE DATA SA UNASSESSED SITES ELIGIBLE AND S A SASA SA SASA859095 08070605040302010001020036' TYP+33.49-Y2- PT 88+29.49 -Y2- PC 90+73.2518'18'REPAT '30.2698' F DP S 8'FDPS8'FDPS 8'FDPS CONCRETE BARRIER SINGLE FACED 50'R 7'R 11'R 50'R PROP. SOIL DRIVE 2'-6"C&G 200' TAPER +00100' TAPER+0012'12'12'END -Y2- STA. 88+25± BEGIN -Y2- STA. 77+92± W/CONCRETE DITCH PROP. RETAINING WALL #35 PROP. DRIVE PROP. DRIVE STECOAH AZ MK BY27-136 BY27-137 GR GRGRJ AMI E A. LAI L, ET ALDB 31 6 PG 71 11 SBR BUSSHEDGR 3 SBWWOODEN FENCE POSTS2 SFD BARN MTL CARPORT POLE SHED SIGN BST BST BST W/LT POLE FLAG W PATIOBRICK 2 S F&BR D CELLAR ROOT WALL ROCK DECKPORCH WD RAILCARPORTSHEDWD CONC HOUSE GREEN 1•SF DGR W SR 1230 (STECOAH RD.) NC 28 (FONTANA RD.) 24' BST GAZEBO SPIKE N AIL IN B ASE OF 36" DBL. S YC A MORE N 61°55'30.4" W DIST 16.89'-B Y31- ST A. 5+00.00 B M#39 ELE V. 2056.76'WOODSWOODSWOODSW OODSWOOD S WOOD S WOOD S WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS DRAIN LINES TANK SEPTIC DB 354 PG 449 THOMAS E. SCHIESSLE LEON CABLE DB 90 PG 759 PATRICIA L. EDWARDS DB 379 PG 162 FLOYD J. CODY DB 70 PG 83 LEON CABLE DB 186 PG 245 DB 111 PG 790 WALLACE D. JENKINS WALLACE JENKINS DB 67 PG 149 NINA Y. JOHNSTON DB 325 PG 459 DB 370 PG 746 SPIKE NAIL IN BASE OF 36" POPLAR -BY27- STA. 88+22.00 37' RT. BM#32 ELEV. 2055.94' POND PONDSPRING PJ 82 8 384858 6 87 88 89 90 91 92 93 94 95 96 D B 4" XX TONS, XX SY GEO CLASS B RIPRAP SEE DETAIL 44B TOE PROTECTION WD 15" CMP 18" CMPHWCONCINV= 2 0 7 3.3 9' I NV= 2 0 6 9.3 8' INV=2058.35 ' INV=2056.54' 18" CMP 8" HDPESE = 0.08 DS = 55 MPH SE = 0.02 DS = 70 MPH GREU TL-3 GREU TL-3 GREU TL-3GREU TL-3AT-1 SC R=20' TYPE B-77 DITCH BLOCK 2GI XX TONS, XX SY GEO CLASS B RIPRAP CUT TO FILL TRANSITION 2GI (Top Wall) 2GI (Top Wall) 18" RCP-IV 18" CSPELB ELB MAX 1.0% PIPE SLOPE THIS SIDE OF ELBOW ROD AND LUG WITH GASKETS (ELBOWS) 4404 4405 4406 XX TONS, XX SY GEO CLASS B RIPRAP 18" RCP-IV 4401 4402 4403 5 TONS, 14 SY GEO CLASS B RIPRAP24" RCP-IVCB-F CB-F 15"15"1 TON, 5 SY GEO CLASS B RIPRAP 1 TON, 5 SY GEO CLASS B RIPRAP 4410 4411 4412 4413 4407 4408 4409 GTD 15" RCP-IV 15" RCP-IV TB 2GI TB 2GI SEE DETAIL 44A RETAINING WALL CONC. DITCH BEHIND (SEE WALL ENVELOPES FOR DITCH GRADE) -Y2- STA. 82+00 TO 88+25 LT (XX SY) DETAIL 44A BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 1.0' D= 1.0' -Y2- STA. 91+00 TO 92+00 LT Fill Slope2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner=Class B Rip-Rap b DETAIL 44B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 2GI-A TB REMOVE HWREMOVE REMOVE REMOVE XX TONS, XX SY GEO CLASS B RIPRAP O O O O O (-)3.124 (-)3.577 CARVER BRANCH UT TO CARVER BRANCH (SBU) STECOAH CREEK STECOAH CREEK (PI) CARVER BRANCH 15" HDPE 15" HDPE1 5" HDP E INLET IN 3' DEEP HOLE LITTERED W/ MANMADE DEBRIS. DRY AT VISIT. OUTLET DITCH FAIRLY STABLE. FAIR CONDITION STABLE OUTLET BURIED 0.4' MODERATE CONDITION STABLE AT END OF 1' BASE DITCH 6'Lx2'Wx3'H SCOUR HOLE STABLE 1' BASE DITCH, NATURAL STABLE, SOME PONDING. 2' TO 4' BASE DITCH. NATURAL, F FFFFF F F F F F F F F F F F F F F F F F F F F F F F CC F F F F F F F F F F C C C F C C C C CCCCC CCCCC 20002000 2000 20002000 2010 2010 2010 2010 2 0 10 2010201020102010 2010 2010 2010 2020 2020 2020 2020 2020 20202020 2020202020202020 2020202020202020 2020 2020 20202020202020202020 2020 2030 2030 2030 2030 20302030 2030 2030 20302040 2040 2 0 4 0 204020402040 2040 2040 2040 20502050 2050 2050 205020502050 2 0 5 0 2050 2 0 6 0 2060 2060 2060 2060 2060206020602 0 7 0 2070 2070 2070207020702070 2 0 8 0 2080 2080 20802080 20802090 2 0 9 0 20902090 2100 21002100 2100 2110 2110 2120 2120 2130 21402150 NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y3- PROFILE, SEE SHEET NO. 77 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_45.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_45.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION A-0009CC 45 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 44MATCH LINE STA -Y2- 96+00.00MATCH TO SHEET NO. 46MATCH LINE STA -Y2- 110+00.00FOR -Y2- PROFILE, SEE SHEET NO. 74 SA UNASSESSED SITES ELIGIBLE AND SA SASA SA PI Sta 93+85.36 D L = 624.07' T = 312.11' R = 11,500.00'1001051100202020100010030060102 02 01 00 02 01 00 36' TYP+73.3215' TYP+96.82 15' T YP+87.14CR PI Sta 10+46.10 D L = 92.14' T = 46.10' R = 1,041.74' PI Sta 12+06.60 D L = 214.68' T = 114.46' R = 250.00' -Y3- PC 10+00.00 -Y3- PRC 10+92.14 -Y2- PT 96+97.32 1 1-Y3- PT 13+06.82 -Y3- CURVE DATA-Y2- CURVE DATA 2'-6"C&G 2'-6"C&G 2'-6"C&G18'18'-Y3- STA. 10+50.00 BEGIN CONSTRUCTION 12'12'12'12'12'12'100' TAPER +40200' TAPER +4024'12'24'12'2'-6"C&G 2'-6"C&G 20'DR 20'DR 20'DR20'DR PROP. CONCRETE DRIVE+16.2340'R50'R+26.41+63.07 10' +51.24 10' 8'FDPS GRAVEL DRIVE PROP. END -Y2- STA. 108+85± BEGIN -Y2- STA. 107+75± PROP. RETAINING WALL #36 -Y3- POT 14+20.24 -Y2- POT 98+65.27 = HANDRAIL PATH W/ 10' MULTIUSE HANDRAIL PATH W/ 10' MULTIUSE EST. SY SEE NCDOT RDY STD 275.01 -Y2- STA. 108+85 TO 111+40, RT ROCK PLATING PROP. DRIVE PROP. DRIVE DB 365 PG 617 JAIME J. HOOPER DB 352 PG 471 JEFFERY HYDE, ET ALBST 1 S F&ROCK D CONCSR 1230 (STECOAH RD.) 17' BST 17' BSTSR 1291 (STECOAH RD.)MARKER F/O MARKER F/O BY27-138SR 1238 (BILL CRISP RD.)45.00' (ABAND.)2 SF D SOIL BSTGRG R GR NC 28 (FONTANA RD.)24' BST MARKER F/O B Y31-160 SPI KE NAIL I N B ASE OF 36" DBL. S YC AMOREN 61°55'30.4" W DIST 16.89' - B Y31- ST A. 5+00.00 B M#39 ELE V. 2056.76' BY31-161 BY31-162 WD SHED DILAPIDATED 84" WD PRI VACYSHEDW DCONCW D DECKBSTBST SR 1230 (HYDE TOWN RD.)GRDECKCONCGRASSGRASS1 SFD S MTL CONCS HE DWDSHEDWDSHED WD S OIL WALLS ONLY BLOCK 48" CH LK 48" CH LK GR CONC BST BST GR 1 SFD1 S ROCK D GARAGE MTL WALL ROCK 24" W/LT SHED SHED SHED SHED SPIKE NAIL IN BASE OF 10" POPLAR -BY27- STA. 108+13.00 34' LT. BM#33 ELEV. 2011.30' BY27-139 GR GR GR GR S MTL 1 S BR D 1 SFD 1 S ROCK D CONC LEONARD BRIDGES DB 87 PG 35 DB 121 PG 656 EIP EIP EIPEIP EIP EIP EIP JOSEPH L. EDWARDS DB 234 PG 246 JEFFERY HYDE DB 350 PG 460 EIP ODELL LOVIN DB 52 PG 392 GREGORY D. BURCHFIELD DB 295 PG 32 ROANNE GORDON DB 288 PG 499 STECOAH BAPTIST CHURCH DB 42 PG 598 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS SPIKE NAIL SET IN 6" X 6" BRIDGE BEAM -BY27- STA. 100+37.00 128' RT. BM#38 ELEV. 2021.11' POSSIBLE DRAIN FIELD TANK SEPTIC DRAIN LINES TANK SEPTIC SEPTIC TANK POSSIBLE TANKS U/G FUEL DRAI N LI NEJOSEPH L. EDWARDS DB 234 PG 246 GREGORY D. BURCHFIELD DB 135 PG 426 DB 234 PG 246 JOSEPH L. EDWARDS WILLIAM CARR DB 206 PG 123 (BY WILL) ROANNE GORDON WBR 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 10 11 1 2 1314vvvvv vv vv vv vHW CONC HW CONC WDWDWDINV=2012.86' WD INV=2015.05' 54" CMP INV=2013.74' INV=2013.70' INV=2014.34'INV=2014.74' 18" CMP HW ROCK 36" CMP HW ROCK INV=2007.02' INV=2008.72' 18" CMP 8" HDPE 8" HDP E 66" CMP INV=2030.45' INV=2031.23' 18" CMP INV=2048.84' INV=2050.48' 18" CMP 18" HDPE6" HDPE6" HDPEGREU TL-3 GREU TL-3GREU TL-3 GREU TL-3 AT-1 SE = 0.02 DS = 70 MPH SE = EXIST.SE = 0.02 DS = 30 MPH CB-F FS SEE DETAIL 45C FALSE SUMP 18" RCP-IV 3 TONS, 10 SY GEO CLASS B RIPRAP SEE DETAIL 45A SPECIAL CUT DITCH DDE=XX CY SEE DETAIL 45B STANDARD 'V' DITCH L S ( Not to Scale) FALSE SUMP -Y3- STA. 12+10 RT Traffic Flow Outside Ditch 1.5' Min.S=Ditch Slope C Proposed Ditch 4 :14:1 PIPE DETAIL 45C 4503 HW DDE=XX CY SEE DETAIL 45D CHANNEL CHANGE CB-G 2:12:1 D ( Not to Scale) STANDARD 'V' DITCH DAYLIGHT AT 1.0% SLOPE -Y3- STA 12+00(29' LT) TO 12+00(54' LT) Min. D=1.5 Ft. DETAIL 45B Ground Natural Ground Natural15"1 TON, 5 SY GEO CLASS B RIPRAP RETAIN 4501 4502 BURY INVERT 0.5' 4504 CB-GCB-G CB-G CB-G 15" RCP-IV15" RCP-IV DRAIN GRADE TO BDO 15"ELB ELBOW 15" RCP-IV CB-FRCP-IV18" 18"3 TON, 10 SY GEO CLASS B RIPRAP 4507 4508 4510 4509 4511 4512 4513 CB-F 4505 450615"1 TON, 5 SY GEO CLASS B RIPRAP CB-G CB-G CB-G CB-G CB-G 4514 4515 4516 4517 4518 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV RCP-IV 15" 4519 4520 4524 4521 4522 CB-F CB-F 15"15"1 TON, 5 SY GEO CLASS B RIPRAP 1 TON, 5 SY GEO CLASS B RIPRAP 4523 GTD REMOVE 22 LF RETAIN TO HERE 42" SEE DETAIL 45E SPECIAL BERM 2:1D ( Not to Scale) B CHANNEL CHANGE Ground Natural Exist. Channel 2:1 Ground Natural DETAIL 45D SEE PFL FOR CHANNEL CHANGE GRADE (15%) -Y2- STA 109+73(57' LT) TO 109+81(37' LT) KEYED-IN (TYP.) CLASS I RIP-RAP XX TONS Type of Liner=CLASS II RIPRAP B=5 Ft. Min. D=3.0 Ft. Length=22 Ft. DDE=XX CY SEE DETAIL 45F CHANNEL CHANGE b 2:1D ( Not to Scale) B CHANNEL CHANGE 1"/Ft.Ground Natural Ground Natural Exist. Channel Fill Slope Proposed Type of Liner=Grass Min. b=3 Ft. B=3 Ft. Min. D=2 Ft. DETAIL 45F SEE PFL FOR CHANNEL CHANGE GRADE (0.5%) -Y2- STA 99+04 TO 99+74 LT RETAIN BURY INVERT 0.5'1@10'X6' RCBC3 0" RCP-I VFlatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH SEE PFL FOR DITCH GRADE (7.6%) -Y3- STA 11+50 TO 12+00 RT DETAIL 45A Min. D=2 Ft. Ground Natural Slope Ditch Front REMOVE REMOVE HW REMOVE REMOVE REMOVE REMOVE REMOVE DO NOT BURY INVERT SILLS & BAFFLES (TYP.) ( Not to Scale) DETAIL 45E 2:1 SPECIAL BERM 2:1ELEV=2002 ft 10' Exist. GroundPipe Inlet -Y2- STA. 109+98 LT 3' 1.5:1 1.5:1 GROUND NATURAL 0'-3.5' EST. 54 TONS CLASS I RIP RAP EST. 21 CY DDE RIP RAP CLASS I DETAIL 45G ( Not to Scale) FLOODPLAIN BENCH UP AND DOWNSTREAM -Y2- STA. 99+90 RT (D/S LENGTH=13 FT) -Y2- STA. 99+76 LT (U/S LENGTH=25 FT) SEE DETAIL 45G FLOODPLAIN BENCH SEE DETAIL 45G FLOODPLAIN BENCH XX TONS BANK STABILIZATION CLASS I RIRPAP (KEYED-IN) O O OO O 4' WIDE CHANNEL STABLE OUTLET. 3' TO 2" TO 3" DEEP FLOW. 2' TO 3' WIDE CHANNEL WITH CRUSHED SOME. INLET 0.4' OPEN & TOP 2' RUSTED OFF 1' V DITCH NO DEFINED DITCH TO JS. WATER SEEMS IT WOULD POND HERE. 1' V DITCH 15" HDPE 6" HDPE FLOW @ SITE VISIT 2 GARDEN HOSE AMOUNT OF FLOW @ SITE VISIT 2 GARDEN HOSE AMOUNT OF DRY @ VISIT AT OUTLET 2' WIDE CHANNEL TALL BERM 3' TO 4' AREA LOW STEEP BANK EROSION ON STABLE 3'-4' WIDE CHANNEL STECOAH CREEK STECOAH CREEK STECOAH CREEK STECOAH CREEK BRANCH (SBV)UT TO ED WARDS BRANCH (SBY )UT TO EDWARD S BRANCH (SBZ)UT TO EDWARDS BRANCH (SCA) UT TO EDWARDS EDWARDS BRANCHEDWARDS BRANCH CARVER BRANCH CREEK (SCB)UT TO STECOAH (-)3.577 (-)1.888 (-)1.888 F F F F F F F F F F F F F F F F F F F F F C F F C C F F F F F C F C CCCCCFFF F F F F F F C C C C C C C C C C C C C C C F F C C C C FF F F 1970197019701970 1970 1970197019701970 1980 1 98 0 19801980 198019801980 1980 1980 1980 198019801990 1990 1990 199019901990 1990 1990 199019901990 1990 2000 2000 20002000 20002000 2000 2010 2010 2010 20102010 2020 2020 20202030 2030 20302030 2040 20402050 2060207020802090 NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_46.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_46.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION A-0009CC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 46 MATCH TO SHEET NO. 45MATCH LINE STA -Y2- 110+00.00MATCH TO SHEET NO. 47MATCH LINE STA -Y2- 124+00.00FOR -Y2- PROFILE, SEE SHEET NO. 46ISLAND - SURFACE MOUNTED PROP MONOLITHIC CONC110115120CRCR 2'-6"C&G 2'-6"C&G 2'-6"C&G 2'-6"C&G 12'12'12'12'12'12'18'18'50'R 30'R+92.15+90.3418'18'+18.6220'R +83.4725'RASPHALT PARKING 20'DR 20'DR END -Y2- STA. 115+25± BEGIN -Y2- STA. 112+75± PROP. RETAINING WALL #37 EST. SY SEE NCDOT RDY STD 275.01 -Y2- STA. 115+25 TO 116+75, RT ROCK PLATING EST. SY SEE NCDOT RDY STD 275.01 -Y2- STA. 117+75 TO 128+25, RT ROCK PLATING EST. SY SEE NCDOT RDY STD 275.01 -Y2- STA. 108+85 TO 111+40, RT ROCK PLATING HANDRAIL PATH W/ 10' MULTIUSE W/ HANDRAIL 10' MULTIUSE PATH AREA LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE ISLAND & PARKING PROP. DRIVE PROP. DRIVE DANA KILBY DB 201 PG 10 GPS-24 T BY27-141 GR GR GR BST BST GR GR GR GR GR G R1 SFD MH MH SIGN MARKER F/O (STECOAH) GPS-23SIGN 1 SF BUS SHED POLE WD SR 1235 (LOWER STECOAH RD.)W/LT W/LT MARKER F/O DECKWDDECK DECK SHED MTL DECK SHED WD SHED WD WD RAMPGR SHED WD 48" CROSS TIE WALL SHEDPOLEMTLSOIL 1 SFD24" ROCK WALL CONC S OIL MH GR GRGR GRGRGR SMTL LT BY32-163 SOILSIGN SIGN SHED POLE WD NC 28 (FONTANA RD.) 24' BST BSTBST SR 1235 (LOWER STECOAH RD.) 18' BST SIGN EIP EIP EIP EIP EIP EIP EIP NAIL EIP CONC EIP IN CONC EIP IN EIP DANA KILBY DB 201 PG 10 2 SBW 1 SB W 3 SBW W/WW 3 SBW W/WWWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS DRAIN FIELDTANK SEPTIC DRAIN LINESTANK SEPTIC DRAIN LINESTANK SEPTIC DRAIN LINES TANK SEPTIC AARON E. FARLEY DB 288 PG 202 LEONDUS McCRACKEN DB 123 PG 252 DB 171 PG 440 DANNY JENKINS DANA KILBY DB 201 PG 10 DB 117 PG 163 BILLY HOLDER JAIME J. HOOPER DB 365 PG 617 DAVID R. HYDE DB 284 PG 61 JAMES R. HYDE, TRUSTEE DB 252 PG 224 GR GR ROCKS LARGE LARGE ROCKS VALVE IRRIGATION VALVE IRRIGATION 1 SFD GR CONC WALL BY27-140 (DESTROYED)SCBSCBPOND POND SPRING 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 v12" HDPE HW CONC 8" CMP15" CMP 12" C MP INV=1979.50' INV=1990.42' 24" CMP INV=1982.59' DITOP=1990.82' INV=1983.46'15" CMP INV=1989.71' 30" CMP INV=1988.27' CONC BRIDGE FOR WATERLINE 6" STEEL SHEATH GREU TL-3GREU TL-3 GREU TL-3 CB-F CB-G CB-G 1 TONS, 5 SY GEO CLASS B RIPRAP ELB ELB ELBOWS 15"CB-G 4620 4619 CB-G 4624 4623 ELBOWS ELB ELB 15"1 TONS, 5 SY GEO CLASS B RIPRAP 4601 460215"CB-G 42" RCP-IV 18"4604 4603 42" RCP-IV 4 2 " RCP-I V4605 4606 4607 4608 DRAIN GRADE TO TB 2GI TB 2GI 15" RCP-IV 15" RCP-IV 15" RCP-IV 18" RCP-IV RCP-IV15" 24" CSP 4609 4610 4611 4612 4613 4614 CB-F CB-F CB-F CB-F4615 4616 4617 4618 4621 4622 4625 462615"15"15"DDE=XX CY SEE DETAIL 46B CHANNEL CHANGE ELB ELB ELBOWS MAX 1% PIPE SLOPE THIS SIDE OF ELBOW 3 TONS, 11 SY GEO CLASS B RIPRAP 15"b 2:1d D ( Not to Scale) B CHANNEL CHANGE 1"/Ft. SEE PFL FOR CHANNEL CHANGE GRADE (3.56%) -Y2- STA. 123+47 TO 124+00 LT Ground Natural b=5 Ft. B=3 Ft. Min. d=2 Ft. Min. D=2 Ft. DETAIL 46B Ground Natural Exist. Channel Fill Slope Proposed KEYED-IN (TYP.) CLASS I RIP-RAP XX TONS Type of Liner=Class I Riprap 2:1 BACKFILL COMPACTED CHANNEL W/ FILL EXISTING 2:1 2.0'1.5:1( Not to Scale) ROCK FILL IN POND -Y2- STA. 120+00 TO 122+50 LT DETAIL 46A Proposed Existing Earth Fill Elev.=1974.5 5' NATURAL RIP-RAP Elev.=1972.5 N.W.S. TB 2GI-A REMOVE HW P PLUG P PLUG FILL FLOWABLE REMOVE P PLUG P PLUG FLOWABLE FILL DO NOT BURY INVERT XX TON, NO GEO CLASS II RIPRAP SEE DETAIL 46C RIPRAP AT EMBANKMENT ( Not to Scale) RIPRAP AT EMBANKMENT 2.0' Type of Liner=Class II Rip-Rap -Y2- STA. 112+28 RT DETAIL 46C 16' Outlet 42" Pipe 1 8 " DI TB 2GI O O O O O O O OO XX TONS NATURAL RIPRAP SEE DETAIL 46A ROCK FILL IN POND (-)1.888 (-)1.888 STECOAH CREEKSTECOAH CREEK (PH) CREEK (SCD) UT TO STECOAH (PM) (PL) CREEK (SCB)UT TO STECOAH SCBSCB UNK. SIZE PIPE UNK. SIZE PIPE SUSPECTED POND OUTLET & FILLED WITH DEBRIS. ESTIMATED 18" CMP CRUSHED PIPE NOT FUNCTIONING. FLOW @ SITE VISIT 1 FIRE HOSE AMOUNT OF (FUTURE BRIDGE LOCATION IS APPROXIMATE). PER CONVERSATION WITH CONTRACTOR ON 3/17/21. TO REPLACE BRIDGE HERE IN NEXT FEW MONTHS CONTRACTOR COMPANY BOUGHT OUT HOUSE & PLAN 3' BASE PERCHED 1.0' 0.2' FLOW 3' BASE 30" CMP (NOT 24") 100% BURIED PIPE INLET BERM FAILING DIAMETER RISER SMALL (SAY <6") F F F F F C C C C F F F F F F F F F F F F F F F F F F F F F F F F F C F C F F F C C C C C C C F F F F F F F F F F F F F F F 19501950 1950 195019501950195019 5 0 19 5 019601960 19601960196019601960196019601960196019601960196019601960 1960 1 9 6 0 19 6 01970197019 7 0 19 7 0 1970197019701970197019701970 1980198019801980198019801990 1990199019901990200020002000200020102010201020102020202020202020203020302030203020402040204020402050205020502060206020602060207020702070207020802080208020802090209020902090210021002100210021002110211021102 110 2120212021202130213021302140214021502150216021602170217021802 18 0 219022002 2 1 0NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 75 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_47.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 46MATCH LINE STA -Y2- 124+00.00MATCH TO SHEET NO. 48MATCH LI NE STA -Y2- 138+00.00A-0009CC 47 12513013502020100010203040302 010001020236' TYP+11.43CR 0436' TYP+73.96PI Sta 132+08.73 D L = 642.52' T = 329.30' R = 1,190.00' -Y2- PC 128+79.43 -Y2- PT 135+21.96 PI Sta 142+30.76 D 12'12'12'12'12'12' 2'-6 "C&G 2'-6 "C&G 2'-6"C&G 2'-6"C&G 8'FDPS 8'FDPS 8'FDPS 8'FDPS 2 0'DR 20' R 25' R +02.7230'R +70.97190'R 10' MULTIUSE PATH 642.53' TAPER 18'18'24'12' 50' R EST. SY SEE NCDOT RDY STD 275.01 -Y2- STA. 117+75 TO 128+25, RT ROCK PLATING W/ HANDRAIL 10' MULTIUSE PATH PROP. DRIVE PROP. DRIVE PROP. DRIVE DB 2 5 2 PG 7 4 4 W ILL IAM D . IVEY DB 3 4 3 PG 6 3 RANDALL W IL SON , ET AL BY 2 7 -14 2 SHED S WD GR GRBST BST BST WALK ROCK DECKDECK 1 SFD CONCCONC GR GR GR GR GR GR 1 S MTL BUS (STORAGE UNITS) 1 S MTL BUS (STORAGE UNITS)1 S MTL BUSS POWER OUTLET BOXES SR 1230 (HYDE TOWN RD.) 16' BST BY27-143 NC 28 (FONTANA RD.) 24' BST CONC CONC PLATFORMWD SIGN BST BST BST GR GR 1 SF BUS UNITRENTAL1 SF CONC CONC CONCGR GR GR 1 SFD MARKERF/O EIP EIP EIP EIP EIP 1 SBW 1 SBW AXLE WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS TANK SEPTIC DRAIN LINES JAMES R. HYDE, TRUSTEE DB 252 PG 224 KICKSTAND LODGE, LTD. DB 243 PG 455 DAVID R. HYDE DB 284 PG 61 JAMES R. HYDE, TRUSTEE DB 252 PG 224 DB 366 PG 138 CIRCLE G MANAGEMENT, LLC MICHAEL CABLE, ET AL DB 373 PG 578 DB 347 PG 257 WILLIAM M. HYDE DB 347 PG 253 DRILLING, LLC GRAHAM WELL SPIKE NAIL IN BASE OF 18" WALNUT -BY27- STA. 131+59.00 38' LT. BM#34 ELEV. 1956.92' SCG S C F POND 12 4 12 5 12 6 12 7 12 8 129 130 131 132 133 134 135 136 137 138 v CUL6 CUL5 CUL4 CUL 1 CUL2 CUL3 CE1 HW1 CUL 12 CUL7 CUL8 CUL9 CUL 11 CUL10 HW 2CE2 CONC BOX CULVERT 10'X 9' S INGLE BARREL GREU TL-3 GREU TL -3 G REU TL -3 GREU TL-3 GREU TL-3 -Y2- CURVE DATA SE = 0.04 DS = 55 MPH CB-F CB-G ELBOWS 4701 4702 1 TONS, 5 SY GEO CLASS B RIPRAP ELB ELB 15"ELB ELBOWS 4707 1 TONS, 5 SY GEO CLASS B RIPRAP CB-G 4706 ELB GRADE TO DRAIN CB-G CB-E CB-F CB-F 4703 4704 4705 RCP -IV 15 " 15"DDE=XX CY SEE DETAIL 47A CHANNEL CHANGE b 2:1d D ( Not to Scale) B CHANNEL CHANGE 1"/Ft. SEE PFL FOR CHANNEL CHANGE GRADE (3.56%) -Y2- STA. 124+00 TO 125+20 LT Ground Natural b=5 Ft. B=3 Ft. Min. d=2 Ft. Min. D=2 Ft. DETAIL 47A Ground Natural Exist. Channel Fill Slope Proposed KEYED-IN (TYP.) CLASS I RIP-RAP XX TONS Type of Liner=Class I Riprap 2:1 30" RCP-IV30" RCP-IV30"ELB ELBELBOWS 15" RCP-IVRETAIN CB-G 15"15"1 TONS, 5 SY GEO CLASS B RIPRAP 1 TONS, 5 SY GEO CLASS B RIPRAP ( Not to Scale) 3:13:1D b 1"/Ft. LATERAL V GRASSED DITCH SEE PFL FOR DITCH GRADE (0.5%) -Y2- STA. 129+94 TO 131+00 LT Ground Natural SLOPE FILL DETAIL 47B b=3 Ft. Min. D=1.5 Ft. ELB ELBELBOWS ELBOWS ELB ELB4709 4708 4711 4710 4716 4715 4714 4713 4712 DDE=XX CY LATERAL V GRASSED DITCH TIE TO EXISTING PIPE 2GI-D E471 BENCH ELEV=1951.4' CHANNEL CHANGE/ DDE XX CY EXCAVATION EASTERNMOST BARRELS LOW FLOW IN BOULDERS TO MAINTAIN SINGLE LINE OF 3'x2'x1' D/S WITH 3@10'x9' RCBC RETAIN AND EXTEND EASTERNMOST BARRELS LOW FLOW IN BOULDERS TO MAINTAIN SINGLE LINE OF 3'x2'x1' ( Not to Scale) RIPRAP AT EMBANKMENT Grade Ditch 2.0' 5'min. Type of Liner=Class II Rip-Rap -Y2- STA. 129+94 LT DETAIL 47C Looking Downstream (Not to Scale) @ U/S Face Approx. Natural Ground SILTED MATERIAL REMOVE EXISTING 3@10'x9' RCBC 3'x2'x1' BOULDERS SINGLE LINE OF Min. d=4 Ft. Length=22 Ft.KEYED-IN (TYP.) BANK STABILIZATION CLASS II RIP-RAP d MA X 1.5:1 -Y2- STA. 128+47 RT DETAIL 47D CULVERT INLET CHANNEL DETAIL MA X 1.5:1 3@10'x9' RCBC Looking Downstream (Not to Scale) KEYED-IN (TYP.) BANK STABILIZATION CLASS II RIP-RAP d Min. d=4 Ft. Length=56 Ft. @ Proposed D/S Face Approx. Natural Ground CHANNEL CHANGE EXCAVATION FOR 3'x2'x1' BOULDERS SINGLE LINE OF MAX1.5:1 d -Y2- STA. 129+26 LT DETAIL 47E CULVERT OUTLET CHANNEL DETAIL XX TONS CLASS II CHANNEL DETAIL 47E SEE CULVERT OUTLET BANK STABILIZATION XX TONS CLASS II CHANNEL DETAIL 47D SEE CULVERT INLET BANK STABILIZATION 2GI-A REMOVE REMOVEREMOVEREMOVE 21 LF XX TONS, NO GEO CLASS II RIPRAP SEE DETAIL 47C RIPRAP AT EMBANKMENT DRAIN GRADE TO 15"O OO OO OO18" CMP~12" HDPE~18" CMPOF PIPE EXPOSED) (HOLE WITH TOP POSSIBLE FAILURE.ONLYDIRECTION 7.6' TO BOTTOM 4.8' TO INV IN VERTICAL CMP PIPE DIUT TO STECOAH CREEK (SCH)UT TO STECOAH CREEK (SCG) STECOAH CREEK STECOAH CREEK STECOAH CREEK (PG) CREEK (SCD)UT TO STECOAH CREEK (SCC)UT TO STECOAH CREEK (SCF)UT TO STECOAH ELEV.=1961.85-Y2- 132+47.59LOW POINT(-)1 .8 8 8 (-)2 .2 5 2 (-)2.252 (-)1.008 (-)1.008 (+)6.394ELEV=1,961.85'-L- STA 132+47.59LOW POINT F F F F F F F F F F F F F F F F C C C C C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F F F C 1930194019401940194019401950195019501950195019501950195019601960196019601960196019601960 19601960 19701970197019701970197019701970197019701970 19801980198019801980198019801980198019801980 1980199019901990199019901990199019901990 199019901990200020002000200020002000200020002000201020102010201020102010 20102010201020202020202020202020202020202030203020302030 203020302030204020402040 20402040204020402040205020502050205020502050205020602060206020602060206020702070207020702070207020802080208020802090209020902090210021002100210021102110211021202120212021202130213021302130214021402140215021502150216021602170217021802180218021902190220022002210221022202220223022402270NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 76 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_48.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 49MATCH LINE STA -Y2- 152+00.00MATCH TO SHEET NO. 47MATCH LINE STA -Y2- 138+00.00A-0009CC 48 140145020201000102030405060708+05.0336' TYP PI Sta 142+30.76 D L = 294.56' T = 147.29' R = 12,000.00' PI Sta 152+17.13 D L = 1,013.07' T = 548.10' R = 1,070.00' -Y2- PT 143+78.03 -Y2- PC 140+83.47 -Y2- PC 146+69.03 8'FDPS 8'FDPS 8'FDPS8'FDPS12'12'12' 1045' LANE DROP TAPER DRIVE PROP. ASPHALT 12'24'+2050' R 8'R 30' R DO NOT DISTURB 142+00, RT -Y2- STA. 139+50 TO SHOULDER BERM GUTTER PROP. DRIVE PROP. DRIVE TMTL MTL MTL MTL MTL MTL MTL MTL MTL M T LBY27-144 BY27-145 BY27-146 NC 28 (FONTANA RD.)24' BST HOUSE BATH MARKER F/O GAS PUMP GAS BOLLARDS CONC BST BST BST POPLAR HILL (PVT)M TL SHED1 SF BUS BST SHOULDER GR GR GR DECK1 SFDSHOP1 SF BY27-1474SBW 4SBW4SBW 60" W W 60" WW BST EIP 6 SBW60" WW 60" WW GATE GATEWOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS W O O D S W O O D S W O O D S W O O D S TANK SEPTIC DRAIN LINET. J. EDWARDS DB 191 PG 512 DB 243 PG 455 KICKSTAND LODGE, LTD. MICHAEL HOLDER DB 169 PG 194 CIRCLE G MANAGEMENT, LLC DB 366 PG 138 T. J. EDWARDS DB 191 PG 512 DB 169 PG 194 MICHAEL HOLDER SPIKE NAIL IN BASE OF 12" DBL POPLAR -BY27- STA. 149+71.00 64' RT. BM#35 ELEV. 2036.22' S DVSDV138 139 140 141 142 143 144 145 146 147 148 149 15 0 151152vv HW CONC INV=1949.95' INV=1940.95' INV=1975.29' 60" CMP INV=1988.92' HW CONC 18" CMP HW CONC 18" CMP INV=2009.38' INV=1984.26' 18" CMP 2 4" CMP36" CMP18" CMPINV=2039 .04 ' INV=2012 .73 ' 18" CMP HW CONC 18" C MP GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 -Y2- CURVE DATA SE = NC DS = 60 MPH SE = 0.08 DS = 55 MPH 3:1 D2:1( Not to Scale) SPECIAL CUT DITCH SEE PFL FOR DITCH GRADE (0.5%) -Y2- STA. 139+00 TO 139+34 RT DETAIL 48A Min. D=1.0 Ft. Ground Natural Slope Ditch Front HW4801 4802 4803 4804 REMOVE HW XX TONS, NO GEO CLASS I RIPRAP SEE DETAIL 48B BANK STABILIZATION FS FS FS FS 2GI-D 2 TONS, 7 GEOTECH CLASS B RIPRAP 4812 ( Not to Scale) BANK STABILIZATION Ground Natural Ground Natural (Variable) CHANNEL BEDEXISTING BANKEXISTING BANK d Min. d=3 Ft. Length=20 Ft. DETAIL 48B KEYED-IN (TYP.) CLASS I RIP-RAP -Y2- STA 141+75(134' LT) TO 141+86(151' LT)2:1D 4:1 d ( Not to Scale) SPECIAL CUT DITCH DETAIL 48C Type of Liner=Class B Rip-Rap Slope Ditch Front Ground Natural Geotextile d=1.5 Ft. Min. D=2 Ft. SEE XSC FOR DITCH GRADE -Y2- STA. 143+50 TO 144+50 RT XX TONS, XX CY GEO CLASS B RIPRAP SEE DETAIL 48C SPECIAL CUT DITCH ELB ELB (ELBOWS) WITH GASKETS ROD AND LUG THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE 1 8 " CS P 3 TONS, 11 GEOTECH CLASS B RIPRAP 4805 BDO SEE DETAIL 48D FALSE SUMP 2GI 2GI SEE DETAIL 48D FALSE SUMP 2GI 3 TONS, 10 SY GEO CLASS B RIPRAP 18"18"18"18" CSPELB ELBOW ELB ELB THIS SIDE OF ELBOW MAX 1.0% PIPE SLOPE GASKETS (ELBOWS) W/ ROD AND LUG XX TONS, XX SY GEO CLASS II RIPRAP CUT TO FILL TRANSISTION 4810 4809 4808 4807 4806 4811 SEE DETAIL 48D FALSE SUMP 8:1 4:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP 2' DETAIL 48D Traffic Flow Outside Ditch 1.0' Max.0.5' Min.etc. GI -Y2- STA. 149+87 RT -Y2- STA. 147+87 RT -Y2- STA. 145+87 RT C Proposed Ditch 6' DIA. MH w/ MH LID w/ MH LID 6' DIA. MH 60" WSP (TRENCHLESS)P PLUG P PLUG FLOWABLE FILL60" CAAP60" CAAPP PLUG P PLUG F LOWABLE FI LLREMOVE HW P PLUG PPLUG REMOVE 20 LF P PLUG P PLUGFLOWABLE FI LLREMOVE HW REMOVE DO NOT BURY INVERT GASKETS (ELBOWS) W/ ROD AND LUG RETAI NELB ELB 1 8 " CSP2:1 2:1 S=Toe of Slope S ( Not to Scale) FALSE SUMP DETAIL 48E Traffic Flow Outside Ditch -L- STA. 142+67 RT TOE OF FILL 1.0'SMIN. ELEV=1997.0 SEE DETAIL 48E FALSE SUMP TB 2GI XX TONS, XX SY GEO CLASS I RIPRAP SEE DETAIL 48F TOE PROTECTION SEE DETAIL 48A SPECIAL CUT DITCH15"4813 4814 OO O -Y2- STA 141+20 TO 142+25 RT -Y2- STA 139+34 TO 141+09 RT Fill Slope2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner=Class I Rip-Rap b DETAIL 48F Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile XX TONS, XX SY GEO CLASS I RIPRAP SEE DETAIL 48F TOE PROTECTION BURY INVERT DO NOT GRAVEL DRIVE. DITCH FLOWS ACROSS FLOWING WATER ON SITE VISIT SPRING BOX OUTLET WITH EXISTING SPRING BOX PERCHED 4' 1' DEEP 4:1 SIDE SLOPES 1' WIDE EX. DRY CHANNEL PERCHED 4'CREEK (SDT)UT TO STECOAH CREEK (SDT)UT TO STECOAH (+)6.394(+)2.575(+)6.394 C C F F F F F F F F C C C C C C C C C C C C C C C C CCF F F F F F F F F F F F F F F F F F F F F C C C C C C C CC 19601970 197019701980 19801990 1990 19902000 2000 2000 2000 2010 2010 2010 2010 2020 2020 20202020 2020 2020203020302030 2030 2030 203020302 0 4 0 204020402040 2040 20402 0 4 0205020502050 2050 20502050 2050 2050 2050 20502060206020602060 2060 20602060206020602060 2060206020602060207020702070207020702 0 7 0 2 0 7 0 20702070 2070 20702070 20802080208020802 0 8 0 208020802080 2080 209020902090209020902 0 9 0 20902090 209021002100210021002100210021002100 2100210021102110211021102 1 1 0 21102110211021102120212021202 1 2 0 21202120 21202130213021302 1 3 0 21302130 2130 21402140214021402 1 4 0 2140 215021502150215021502150 21602160216021602160 2160 21702170217021702170 2170 21802180218021802180 2180 2190219021902190 2200220022002200 2210221022102210 222022202220 2220 2230223022302230224022402240 225022502250 226022602260 227022702270 2280228022902290 23002300 23102310 23202330NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_49.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 48MATCH LINE STA -Y2- 152+00.00MATCH TO SHEET NO. 50MATCH LI NE STA -Y2- 166+00.00A-0009CC 49 FOR -Y2- PROFILE, SEE SHEET NO. 76 ISLAND - SURFACE MOUNTED PROP MONOLITHIC CONC 1551601650807060504030201000001020304050628' TYP+80.00+09.00748.13' TAPER TO EXISTING1045' LANE DROP TAPERPI Sta 152+17.13 D L = 1,013.07' T = 548.10' R = 1,070.00' PI Sta 167+46.16 D L = 1,463.04' T = 849.28' R = 1,150.00' -Y2- PC 158+96.87 -Y2- PT 156+82.10 1045' LANE DROP TAPER 8'FDPS 8'FDPS 31'24'+6519.34'100'R+07.22+83.4924.27'70'R25'R GRAVEL DRIVE PROP.+00REPAT PORD ENAL '066 GNITSIXE OT REPAT '015 .TSIXE OT REPAT DNALSI '591+5024'+96.8712'12'12'100' BUFFER 100 ' TAPER +0028'8'FDPS 8'FDPS 2'-6"C & G8 "x12" C U R B C A T -142' 64 ' -4" LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE CURB & DRIVE LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE ISLAND PROP. DRIVE PROP. DRIVE U/C MTL MTL MTL MTLMTL MTL MTL BY27-147 50.00'BY27-148SR 1235 (GUNTER GAP RD.) 18' BSTGRGRGRGRBY27-150BY27-149W/LTBS T ABAND.SH ED M TL PO LE1 S BR BUSBSTGRGRGRR E D B AR N (P VT)GR1 S ROCK&MAS BUS MTL P O L E F LA G W D R A IL S IG N C U R B B S TBST B O L L A R D S G A S T A N K4000 G A L D IE S E L T A N K6000 G A L W A L L B A R R IE R C O N C B S T P R IV A C Y W D W A L L C O N CSIGN GR BSTBST GR GR GATE A /G WATER L INE E IP B ST WOODS WOODS WOODS W O O D SW O O D SW O O D SW O O D SW O O D SWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODS WOODS WOODS WOODS WOODS DB 365 PG 480 ROGER HOLDER MICHAEL HOLDER DB 169 PG 194 LEONDUS McCRACKEN DB 261 PG 244 RONALD J. BAKER, JR. DB 342 PG 811 MICHAEL HOLDER DB 169 PG 194 LEONDUS McCRACKEN DB 237 PG 414 WOLF CREEK DEN, LLC DB 358 PG 230 LEONDUS McCRACKEN DB 261 PG 244 SPIKE NAIL IN BASE OF 22" POPLAR N 22°12'25.4" E DIST 94.64' -BY27- STA. 157+23.85 BM#41 ELEV. 2063.76' WBM SPRING 152 153 154 15 5 15615715815916016 1 162 163 164 165 166 INV=2046.86' INV=1967.34' DIRECTION IN V =2061.36' T O P=2063.98' D IINV=2056 .53' INV=2058 .76 ' HW CONC 18 " CMP IN V =2046.63'IN V =2049. 6 9'18" CM P IN V =2062.98' T O P =2065.53' D IIN V =2062.31'18" H D P E18" HDPE12" CMPD IT O P =2064.01'IN V =2061.74'IN V =2059.37'GREU TL-2AT-1 GREU TL-3 GREU TL-3 -Y2- CURVE DATA SE = 0.06 DS = 55 MPH SE = 0.08 DS = 55 MPH DRAIN GRADE TO DI18" REMOVE 29 LF RETAIN3 TONS, 10 SY GEO CLASS B RIPRAP 4904 4903 E491 TB 2GI 15" RCP-IV 15" RCP-IVTB 2GI TB 2GIRETAIN RETAIN4905 4906 4907 E492 E493 E49418" RCP-IV2 TONS, 7 GEOTECH CLASS B RIPRAP 4901FS 2GI-D 4902 REMOVE REMOVE BLIND JB REMOVE BLIND JB RETAIN RETAIN RETAIN (TO DISCUSS AT CFI) OF EXISTING 15" CMP PRIOR TO INSTALLING STR# 4905. CONTRACTOR SHALL CONFIRM HORIZONTAL & VERTICAL LOCATION SEE DETAIL 49A FALSE SUMP 8:1 4:1 LS=Ditch Slope S ( Not to Scale) FALSE SUMP 2' DETAIL 49A Traffic Flow Outside Ditch 1.0' Max.0.5' Min.etc. GI -Y2- STA. 153+86 RT C Proposed Ditch PPLUG P PLUG FILLFLOWABLE RETAIN (UNKNOWN INVERT). EXISTING 24" CMP PROPOSED SYSTEM INTO CONTRACTOR SHALL TIE O OO DI SUSPECTED PIPE FOUND IN DITCH PIPE OUTLET NOT GOOD CONDITION A-0009DD PLANS BLIND JB PER A-0009DD PLANS BLIND JB PER PER A-0009DD PLANS 24" CSP HAS 2 ELBOWS NO PIPE HERE A-0009DD PLANS EXISTING 15" BCCSP PER 15" CSPPER A-0009DD PLANS EXISTING 15" BCCSP PERCHED 8' W/ DEBRIS 1/ 2 FILLED PERCHED 3'66" CSP PER A-0009DD PLANS CREEK (SDZ) UT TO WOLF CREEK (SDZ)UT TO WOLF CREEK (SEC) UT TO WOLF WOLF CREEK (+)2.575(-)4.459ELEV=2,068.71' -L- STA 158+47.75HI GH POI NT(+)2.575 (-)4.459 ELEV.=2068.71-Y2- 158+47.75HIGH POINTC C C C C C C C CCCCCCF F F C F F C F F C C C C C FCCCCCCCCC C C C C C C C C C C C C F 1940195019501950 195019501960 1960 19601960196019701970 19701980198019901990 20002000 20002010 2 0 1 0 201020102020202020202020 2030 2030 20302030 2030 2040 2040 2040 2040 20402050 2 0 5 0 2050 2050 20602 0 6 0 206020702070 2070 2080208020902090 21002100 2100 2110 2110 NAD 83/ 2011CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS FOR -Y2- PROFILE, SEE SHEET NO. 77 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021X:\NCDOT\A-0009\Hydraulics\MERGER\A-0009 CC\CC 4B\Plan Sheets\A-0009CC_Rdy_psh_50.dgnUser:zrichard8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCH TO SHEET NO. 49MATCH LINE STA -Y2- 166+00.00A-0009CC 50 PI Sta 167+46.16 D L = 1,463.04' T = 849.28' R = 1,150.00' -L- CURVE DATA ISLAND - SURFACE MOUNTED PROP MONOLITHIC CONC 17005806058063 6' TYP+09.00510' TAPER TO EXI STI NG-Y2- PT 173+59.92 REPAT PORD ENAL '06624.6'24.8'MLL AND RESURFACE+45+45-Y2- STA. 169+60 END TIP PROJECT A-0009CC LAYOUT SEE DETAIL SHT 2B- FOR CONCRETE ISLAND PROP. DRIVE PROP. DRIVEMTL MTLM T L M TL MTL MTL BY27 -152 GPS-25BY27-151BSTBS TGRGRG R A S S M E D IA N BSTEXPRESSW A Y C & GEXPRESSWAY C&GEXPRESSWAY C&G EXPRESSWAY C&G GRASS MEDIAN S 47°53'56" E429.06'S 54°56'23" E206.32'S 54°01'55" E120.43' S 7 1° 2 6' 2 3 " E 7 1. 8 4'S 51°38'25" E58.10'S 27°49'53" E57.90'EI PEI PWOODSWOODS WOODSW O O D S WOODS WOODS W O O D S WOODS WOODS RONALD J. BAKER, JR. DB 342 PG 811 DONALD CABLE, ET AL DB 261 PG 567 SPIKE NAIL IN BASE OF 24" POPLAR -BY27- STA. 172+21.00 134' LT. BM#36 ELEV. 2022.34' S E AWolf Creek WBO WBPWBN 16 6 167168169170 171 172 173 50-01 v12" HDPE 15" HDPEDS = 55 MPH SE = 0.06 GREU TL-3 2GI TB 5001 5002 15" RCP-V2 TONS, 7 SY GEO CLASS B RIPRAP RETAI N(UNKNO WN INVERT). EXISTING 24" C MP PROPOSED SYSTE M INTO CONTRACTOR SHALL TIE OCREEK ( S DZ)UT TO WOLF CREEK (SEC)UT TO WOLF WO L F CR E EK SUSPECTED PIPE 66" CSP PER A-0009DD PLANSFF -L- FOR -L- PLAN, SEE SHEET NO. 35 FOR -L- PLAN, SEE SHEET NO. 36 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 2,880 2,890 2,900 2,910 2,920 2,930 2,940 2,950 2,960 2,840 2,850 2,860 2,870 2,880 428 434429430431432433 435 436 437 438 439 440 441 442 2,830 2,780 2,790 2,800 2,810 2,820 2,840 2,850 2,860 2,800 2,790 2,780 2,770 2,760 2,750 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 69 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC PI = 415+75.00 EL = 2,932.82' ( - )7.2698% (-)6.6962% VC = 180' K = 314 DS = 80 MPH EL. 2,941.91' -L- STA 414+50.00 BEGIN GRADE SECTION CC (+) 0.6790% EL=2931.31 -L- STA. 419+50.00 LT END BERM BASE DITCH EL=2933.46 -L- STA. 419+00.00 LT BEGIN BERM BASE DITCH EL=2931.20 -L- STA. 419+33.80 LT (-) 6.6864% PI = 422+40.00 EL = 2,888.29' ( - )6.6962%(-)6.1925% VC = 180' K = 357 DS = 80 MPH PI = 430+40.00 EL = 2,838.75'(-)6.1925% ( -)6.6193% VC = 300' K = 703 PI = 436+10.00 EL = 2,801.02' (-)6.6193% (- )7.8490%VC = 180' K = 146 DS = 80 MPH DS = 55 MPH PI = 441+00.00 EL = 2,762.56' (- )7.8490%(- )8.0415%VC = 180' K = 935 DS = 80 MPH -L- FOR -L- PLAN, SEE SHEET NO. 37 FOR -L- PLAN, SEE SHEET NO. 38 442 443 444 445 446 447 448 449 450 451 452 453 2,680 2,690 2,700 2,710 2,720 2,730 2,740 2,750 2,760 2,680 2,670 2,660 2,650 2,640 2,630 454 455 456 456 459457458 469460461462463464465466467468 2,580 2,600 2,590 2,610 2,620 2,630 2,640 2,650 2,660 2,590 2,580 2,570 2,560 2,550 2,540 2,530 470 2,520 2,510 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 70 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC PI = 447+50.00 EL = 2,710.29' (- )8.0415%( - )6.9045% VC = 180' K = 158 DS = 80 MPH 30" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2706.2 = N/A = 50 = 19 = 2699.8 = 21 = 2700.0 = 9.8 #3708-L- Sta. 447+52 = 500+ PI = 455+35.00 EL = 2,656.09' ( - )6.9045% (- )7.9182%VC = 180' K = 178 DS = 60 MPH EL=2668.00 -L- STA. 452+81.70 LT (+) 13.0601% EL=2672.20 -L- STA. 452+50.00 LT BASE DITCH BEGIN SPECIAL LATERAL EL=2670.39 -L- STA. 453+00.00 LT BASE DITCH END SPECIAL LATERAL (-) 13.2492% 36" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2671.0 = 38 = 50 = 36 = 2670.9 = 40 = N/A = 19.6 #3719-L- Sta. 452+82 = 50+ PI = 458+65.00 EL = 2,629.96' (- )7.9182%(-)6.3091% VC = 190' K = 118 PI = 462+50.00 EL = 2,605.67'(-)6.3091% (- )8.4676%VC = 340' K = 158 DS = 55 MPH DS = 60 MPH (- ) 8.2100%( - ) 7.3067% EL=2609.21 -L- STA. 461+50.00 LT CUT DITCH BEGIN SPECIAL EL=2601.00 -L- STA. 462+50.00 LT EL=2590.04 -L- STA. 464+00.00 LT CUT DITCH END SPECIAL 36" CMP EXISTING RELINE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2627.3 = N/A = 50 = 75 = 2611.3 = 85 = 2612.6 = 44 #3803-L- Sta. 458+25 = 500+ PI = 466+20.00 EL = 2,574.34' (- )8.4676%(-)8.6464%VC = 180' K = 1006 DS = 80 MPH 36" CMP EXISTING RELINE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2561.5 = N/A = 50 = 100 = 2538.3 = 110 = 2539.9 = 56.8 #3810-L- Sta. 467+71 = 500+ -L- FOR -L- PLAN, SEE SHEET NO. 39 -Y2- 1615141312 191817 23 24222120 25 26 FOR -Y2- PLAN, SEE SHEET NO. 39 2,520 2,510 2,500 2,490 2,470 2,480 2,460 2,450 2,520 2,510 2,500 2,490 2,470 2,480 2,460 2,450 470 471 472 473 474 2,490 2,550 2,500 2,510 2,520 2,530 2,540 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 71 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC PI = 14+70.00 EL = 2,485.30' (+)8.0181% (+)8.5158% VC = 180' K = 362 PI = 18+50.00 EL = 2,517.66' (+)8.5158%(-)0.8792% VC = 400' K = 43 PI = 23+30.00 EL = 2,513.44' (-)0.8792%(-)5.8063% VC = 415' K = 84 EL .2,468.46 -Y2- STA 12+60.00 BEGIN GRADE DS = 80 MPH DS = 35 MPH DS = 50 MPH (+) 9.0% EL=2474.79 -Y2- STA. 13+73 LT BEGIN SPECIAL CUT DITCH EL=2481.72 -Y2- STA. 14+50 LT END SPECIAL CUT DITCH 36" CMP EXISTING RELINE 36" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2487.4 = N/A = 50 = 55 = 2485.2 = 60 = 2485.5 = 30.1 #3911-Y2- Sta. 14+89 = 500(+) DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2470.8 = 115 = 50 = 90 = 2467.1 = 100 = 2468.5 = 50.2 #3913-Y2- Sta. 13+28 = 100+ PI = 473+62.00 EL = 2,510.18' (-)8.6469%(+)2.3992% VC = 115' K = 10 DS = 15 MPH EL. 2,511.56' -Y2- STA 23+01.32, 12'RT -L- STA 474+19.52 = END GRADE 02 26 27 28 312930 32 33 34 38353637 4039 2,430 2,440 2,450 2,460 2,470 2,480 2,490 2,500 2,510 2,380 2,390 2,400 2,410 2,420 -Y2- FOR -Y2- PLAN, SEE SHEET NO. 40 40 41 42 43 44 46 47 48 49 54525345 2,320 2,390 2,330 2,340 2,350 2,360 2,370 2,380 2,400 2,270 2,280 2,290 2,300 2,310 2,320 2,330 FOR -Y2- PLAN, SEE SHEET NO. 41 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 72 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC 2,260 2,250 50 51 PI = 26+45.00 EL = 2,495.15'(-)5.8063% ( - )6.9412% VC = 180' K = 159 PI = 29+00.00 EL = 2,477.45' ( - )6.9412%(-)5.3690% VC = 185' K = 118 PI = 31+90.00 EL = 2,461.88'(-)5.3690% (- )7.8360%VC = 285' K = 116 DS = 60 MPH DS = 55 MPH DS = 55 MPH EL=2445.82 -Y2- STA. 32+40 RT BEGIN LATERAL 'V' DITCH EL=2445.50 -Y2- STA. 32+63 RT END LATERAL 'V' DITCH (-) 1.4% 42" CMP EXISTING RELINE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2482.0 = N/A = 50 = 120 = 2464.4 = 130 = 2465.4 = 64.3 #4002-Y2- Sta. 27+68 = 500+ (- )7.8360%EL=2412.80 -Y2- STA. 39+00 RT BEGIN BERM 'V' DITCH (-) 1.6%(+) 3.7% EL=2414.00 -Y2- STA. 40+00 RT END BERM 'V' DITCH EL=2412.00 -Y2- STA. 39+50 RT 48" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2424.5 = 110 = 50 = 100 = 2424.1 = 110 = 2424.5 = 55.2 #4017-Y2- Sta. 36+01 = 100 PI = 43+30.00 EL = 2,372.55' (- )7.8360%(- )8.1186%VC = 180' K = 637 DS = 80 MPH EL=2339.23 -Y2- STA. 46+95 RT BEGIN CHANNEL CHANGE (-) 18.60 % EL=2329.00 -Y2- STA. 47+50 RT (-) 10.70%54" CAAP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2367.7 = N/A = 50 = 120 = 2364.9 = 130 = 2365.3 = 63 #4104-Y2- Sta. 43+94 = 500+ PI = 53+00.00 EL = 2,293.80' (- )8.1186%(- )7.9825%VC = 180' K = 1323 DS = 80 MPH (-) 14.8 %EL=2253.70 -Y2- STA. 52+00 LT BEGIN CHANNEL CHANGE EL=2245.10 -Y2- STA. 53+00 LT END CHANNEL CHANGE EL=2250.00 -Y2- STA. 52+25 LT (-) 6.53% EL=2302.80 -Y2- STA. 49+50 RT END CHANNEL CHANGE (-) 15.50 %42" CMP EXISTING RELINE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2308.3 = N/A = 50 = 93 = 2304.7 = 100 = 2305.3 = 47.5 #4108-Y2- Sta. 50+28 = 500+ (-) 10.70%EL=2318.30 48+50 RT -Y2- STA. 54 5655 595857 6160 62 656364 686667 2,220 2,230 2,240 2,250 2,260 2,270 2,280 2,290 2,210 2,160 2,170 2,180 2,190 2,150 FOR -Y2- PLAN, SEE SHEET NO. 42 -Y2- 827778798081767172737475706968 2,140 2,150 2,160 2,170 2,180 2,130 2,120 2,110 2,100 2,060 2,070 2,080 2,090 2,100 2,110 2,120 2,130 2,140 FOR -Y2- PLAN, SEE SHEET NO. 43 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 73 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC (- )7.9825%EL=2284.0 -Y2- STA. 55+71 RT END BERM 'V' DITCH EL=2289.0 -Y2- STA. 55+00 RT BEGIN BERM 'V' DITCH EL=2282.6 -Y2- STA. 55+50 RT (+) 6.7% (-) 12.8 %EL=2229.0 -Y2- STA. 59+18 RT BEGIN LATERAL 'V' DITCH EL=2222.3 -Y2- STA. 59+53 RT EL=2224.0 -Y2- STA. 59+90 RT END LATERAL 'V' DITCH (-) 18.6%(+) 4.5% 24" CSP PROPOSED 24" CMP EXISTING RELINE DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2225.3 = 17 = 50 = 13 = 2224.5 = 14 = 2224.6 = 5.9 #4207-Y2- Sta. 59+74 = 500 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2273.1 = N/A = 50 = 14 = 2271.0 = 15 = 2271.2 = 7.5 #4203-Y2- Sta. 55+50 = 500(+) PI = 64+45.00 EL = 2,202.40' (- )7.9825%(-)8.7859%VC = 180' K = 224 PI = 68+00.00 EL = 2,171.21' (-)8.7859%VC = 180' K = 253 DS = 80 MPH DS = 65 MPH EL=2150.40 -Y2- STA. 67+96 LT BEGIN STREAM RESTORATION 66" WSP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2164.0 = N/A = 50 = 200 = 2156.0 = 260 = 2157.6 = 116 #4221-Y2- Sta. 67+82 = 500(+) (- )8.0753%PI = 72+25.00 EL = 2,136.89' (- )8.0753%( - )7.2874% VC = 180' K = 228 DS = 75 MPH PI = 68+00.00 EL = 2,171.21' VC = 180' K = 253 DS = 80 MPH EL=2125.20 -Y2- STA. 73+00 RT (- ) 8.0%( - ) 6.8% EL=2141.20 -Y2- STA. 71+00 RT BEGIN LATERAL BASE DITCH EL=2118.40 -Y2- STA. 74+00 RT END LATERAL BASE DITCH (+) 4.90% EL=2152.40 -Y2- STA. 68+26 LT END STREAM RESTORATION PI = 79+00.00 EL = 2,087.70' ( - )7.2874% (- )3 .1241% VC = 570' K = 137 DS = 60 MPH (-) 0.30% EL=2086.80 -Y2- STA. 76+08 RT BEGIN STANDARD BASE DITCH EL=2086.70 -Y2- STA. 76+22 RT END STANDARD BASE DITCH 42" WSP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2102.6 = N/A = 50 = 60 = 2092.2 = 65 = 2092.5 = 32.7 #4309-Y2- Sta. 76+00 = 500(+) -Y2- 8982838485868788 96909192939495 FOR -Y2- PLAN, SEE SHEET NO. 44 2,030 2,040 2,050 2,060 2,070 2,080 2,090 2,100 2,020 2,030 2,040 2,050 2,060 2,020 11010610710810910510110210310410096979899 FOR -Y2- PLAN, SEE SHEET NO. 45 1,990 2,000 2,010 2,020 2,030 1,980 2,060 2,050 2,040 1,990 2,000 2,010 2,020 2,030 1,980 2,060 2,050 2,040 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 74 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC PI = 86+90.00 EL = 2,063.02' (- )3 .1241%(-)3 .5772% VC = 180' K = 397 DS = 80 MPH PI = 96+55.00 EL = 2,028.50' (-)3 .5772%(-)1.8876% VC = 350' K = 207 DS = 75 MPH (-) 15.0 %EL=2001.00 -Y2- STA. 109+73 LT BEGIN CHANNEL CHANGE EL=1997.80 -Y2- STA. 109+81 LT END CHANNEL CHANGE (-) 0.50% EL=2017.00 -Y2- STA. 99+04 LT BEGIN CHANNEL CHANGE EL=2016.60 -Y2- STA. 99+74 LT END CHANNEL CHANGE FOR -Y2- PLAN, SEE SHEET NO. 46 1,960 1,970 1,980 1,990 2,000 2,010 2,020 2,030 1,950 1,960 1,970 1,980 1,990 1,950 115113114112111110 124118119120121122123117116 -Y2- 127124125126 131130129128 138132133134135136137 FOR -Y2- PLAN, SEE SHEET NO. 47 1,960 1,970 1,980 1,990 2,000 1,950 1,940 1,930 1,920 1,920 1,930 1,940 1,950 1,960 1,970 1,980 1,990 2,000 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 75 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC (-)1.8876% EL=1963.66 -Y2- STA. 123+47 LT BEGIN CHANNEL CHANGE ( - ) 3 .56% PI = 126+00.00 EL = 1,972.91' (-)1.8876% (-)2.2524% VC = 180' K = 493 PI = 130+20.00 EL = 1,963.45' (-)2.2524%(-)1.0084% VC = 180' K = 145 PI = 136+15.00 EL = 1,957.45' (-)1.0084%(+)6.3941% VC = 1,010' K = 136 DS = 80 MPH DS = 60 MPH DS = 60 MPH EL=1957.50 -Y2- STA. 125+20 LT END CHANNEL CHANGE ( - ) 3 .56% EL=1951.60 -Y2- STA. 131+00 LT 'V' GRASSED DITCH END LATERAL EL=1951.07 -Y2- STA. 129+94 LT 'V' GRASSED DITCH BEGIN LATERAL (+) 0.50% 30" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 1963.4 = N/A = 50 = 21 = 1957.6 = 23 = 1957.7 = 8.9 #4713-Y2- Sta. 132+38 = 500(+) -Y2- FOR -Y2- PLAN, SEE SHEET NO. 48 FOR -Y2- PLAN, SEE SHEET NO. 49 143138139140141142 152147148149150151146145144 2,020 2,030 2,040 2,050 2,060 2,080 1,970 1,980 1,990 2,000 2,010 2,020 2,030 163 164 165 166162152153154155156157158159160161 2,020 2,030 2,040 2,050 2,060 2,070 2,080 2,090 2,010 2,020 2,030 2,040 2,050 2,060 2,070 2,080 2,090 2,010 1,960 1,950 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 76 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS A-0009CC (+)6.3941% (-) 0.50% EL=1975.36 -Y2- STA. 139+34 RT END SPECIAL CUT DITCH EL=1975.53 -Y2- STA. 139+00 RT BEGIN SPECIAL CUT DITCH 18" CSP PROPOSED 60" WSP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 1997.0 = N/A = 50 = 6.4 = 1996.3 = 7.1 = 1996.5 = 2.7 #4805-Y2- Sta. 142+70 = 500+ DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 1976.5 = N/A = 50 = 170 = 1958.4 = 220 = 1959.9 = 90.4 #4801-Y2- Sta. 141+33 = 500(+) PI = 151+40.00 EL = 2,054.96' (+)6.3941%(+)2.5749% VC = 660' K = 173 DS = 60 MPH PI = 159+75.00 EL = 2,076.46' (+)2.5749%(-)4 .4 5 9 2% VC = 950' K = 135 EL. 2,048.59 -Y2- STA 166+00 END GRADE DS = 55 MPH 24" CMP EXISTING RETAIN DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2049.0 = 14 = 50 = 14 = 2048.9 = 15 = 2049.1 = 4.88 EX. 24" CMP -Y2- Sta. 165+20 = 100 10 11 2,880 2,890 2,900 2,910 2,920 2,930 2,940 168166167 171170169 2,070 2,010 2,060 2,020 2,030 2,040 2,050 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 77 6/1/2021X:\NCDOT\A-0009\Roadway\Proj\A-0009CC Plan Sheets\A-0009CC_Rdy_pfl_Sheets.dgnUser:zrichardDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION A-0009CC 10 11 12 13 14 2,000 2,010 2,020 2,050 2,040 2,030 -Y3- 2,150 2,160 2,170 2,180 2,190 2,220 2,210 2,200 10 11 FOR -DR4- PLAN, SEE SHEET NO. 42 FOR -Y3- PLAN, SEE SHEET NO. 45 FOR -Y2- PLAN, SEE SHEET NO. 50 -DR3- FOR -DR3- PLAN, SEE SHEET NO. 35 -Y2- -DR4- CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 201 W. MARION ST TGS ENGINEERS PI = 10+35.60 EL = 2,929.50' (-)13.0 6 2 7 %(-)25.0028 % PI = 11+52.00 EL = 2,900.40' PI = 11+67.00 EL = 2,900.70' (+)2.0058%(+)8.0000%.08 EL. 2,931.54 -DR3- STA 10+20.00 BEGIN GRADE VC = 30' K = 3 DS = 15 MPH VC = 10' K = 2 DS = 15 MPH VC = 20' K = 1 DS = 15 MPH EL. 2,901.10 -L- STA 420+20.00, 24'LT -DR3- STA 11+72.03 = END GRADE MILL & RESURFACE 169+60DS = 60 MPH DS = 25 MPH PI = 11+50.00 EL = 2,036.36'(-)5.3500%(-)6.0000% VC = 100' K = 154 PI = 13+25.00 EL = 2,025.86'(-)6.0000% (-)2.1941% VC = 100' K = 26 EL. 2,041.71 -Y3- STA 10+50.00 BEGIN GRADE 02 EL. 2,024.17 -Y2- STA 98+65.57, 18'LT -Y3- STA 14+02.24 = END GRADE (- ) 7.60% EL=2033.79 -Y3- STA. 11+50 RT BEGIN SPECIAL CUT DITCH EL=2030.0 -Y3- STA. 12+00 RT END SPECIAL CUT DITCH 18" RCP PROPOSED 30" RCP PROPOSED DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2031.5 = N/A = 25 = 2.2 = 2030.8 = 2.8 = 2030.9 = 1.0 #4503-Y3- Sta. 12+00 = 500(+) DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT= 2026.2 = N/A = 25 = 22 = 2019.9 = 28 = 2020.5 = 11 #4504-Y3- Sta. 13+30 = 500(+) EL. 2,184.89 -DR4- STA 10+12.13 -Y2- STA 66+33.38, 12'RT= BEGIN GRADE EL. 2,205.48 -DR4- STA 11+10.00 END GRADE VC = 20' DS = 15 MPH K = 1 VC = 20' DS = 15 MPH K = 2 PI = 10+22.50 EL = 2,184.68' (-)2.0000% PI = 11+00.00 EL = 2,204.06' (+)2 5 .0 0 0 0 %(+)14.2240%