Loading...
HomeMy WebLinkAbout20210794 Ver 1_Shoreline Stabilization_20210603Shoreline Stabilization Application Form 15ANCAC 02H .0500 — Water QualityCertification, Shoreline Stabilization FORM SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TINE Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form.pdf 55.59KB Pre -fling Meeting or Request Date 6/22/2021 ID# Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * bart@shawtate.com Rease provide an email address for payrrent and requests for pore information here. Owner Information: Name:* Bartow Shaw Email: * bart@shawtate.com Phone Number:* (704)293-6335 (xxx)xxx-xxxx Mailing Address:* Street Address 1031 S Caldwell St Address Line 2 Suite 110 City Charlotte Rbstal / Zip Code 28203-5178 State / Rovince / Region NC Country US Is there an agent working on the project?* r Yes C: No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Waterfront Club If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File C: Look up address Property Address Lookup:* Latitude:* 35.782000 Street Address 1781 Coveside Drive Address Line 2 City State / Province / Region Granite Falls North Carolina Fbstal / Zip Code Country 28630 United States Longitude:* -81.551000 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 1.43MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shoreline Stabilization.pdf 1.03MB 4. Location of the property (where work is to be conducted) Nearest Town:* Granite Falls County:* Caldwell Lake/ river/ ocean adjacent to Lake Rhodhiss property: Subdivisions name or site address:* Waterfront Club hclude phase/lot number Directions to site:* From Asheville take I-40 E to Malcolm Blvd. in Rutherford College. Take exit 113 stay on Malcolm Blvd. and it will become Connelly Springs road. The entrance to Waterfront Club will be in 4.2 miles and the code to get in is 5266#. Stay on Scenic Lane for 1 mile and take a left on Leeward Lane. Take a right at the first intersection on Coveside Drive. The Clubhouse lot will be 1/2 mile on the left. Rease include road nacres and nurrbers, landrrerks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Existing cleared area next to the water on a residential lot. 4X4s 36 feet wide with sand behind it is shown on the attached picture. Residential, undeveloped, etc. 6. Property Size 1.033 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Large boulders will be used to stabilize the shoreline per Duke's enhanced rip -rap technique. Native plantings will also be used for stabilization. I have attached 8. How will the work be done?* rJ From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 240 SF square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 240 SF square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nurrber of trees, for instance) Native grasses will be grown between the boulders in the 3 ft X 80 ft area. Sketch: Vegitation.pdf 154.42KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: Bartow Shaw Initial Review Is this accepted into the review C' Yes 0 No process?* Project Number:* 20210794 Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Version: * Amy Annino:eads\amannino Asheville Regional Office - (828) 296-4500 1 ✓ No Payment Needed ✓ Fee Received C' Need Fee - send electronic notification C' $240.00 ✓ $570.00 Water Resources ENVIRONMENTAL QUALgTY State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: S5GP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Ful[ Pond/ Normal Water Level) tkjoite" Full Pond/ Normal Water Level — M M M Shoreline 'I)(' LU 05aEe ,'kt 1o14ecG np C]rreztre.iLs liar S — eCCet trefttayt IAr er& Plan View -fI x ga-Ff ME N M M i r FORM: SSGP 02-2017 Page 1 of 3 3-F�- Jie Lw 3 -F7Lcrkvcie4 4:) II pe A-404 ig3,4 vtk -Efr 15 Lake {At Full Pond/ Norma) Water Level) Side View 0 LI— Full Pond/ Normal Water Level 2F,x150R addldonaf Clearing 'if necessary Plan View Lake (la Fug Pond/ Norrna! Water Love]) :i r w • ei Riprap • +e Existing Dock 30 li o74 4ftx1s0ft Below full pand/ N WL 4Rx nil ft Abu. full ppr j/ NWl E FORM: SSGP 02-2017 Page 2 of 3 10 Et. bank height Side View 3 ft. below fulf pond water level 4 ft. above full pond water level 2 ft. additional clearing 'if necessary Existing bank AMPLE FORM: SSGP 02-2017 Page 3 of 3 .a �.x...F.�m..vrY^k.v.. Fim"w.,..ate Si'waarrw rn out X--i ion • -- r_ •' — 1' 1i1 w -� \ t ;::+i 7 �.. a•• *mv1rwnnr 11,1343f.] • i?�1F.Pi[R►C9M1u• a..f 7 • ILLEMEI•ee 1M � R+>i�lirs•'rM1ir YllpunJ4Lf•8.:. • @Y'RW G+'�IfiYfir^LRTy�7 @I{>ti9 i a C 1-£111 fs'[� irR4sal•rrlrnn�. • f r flfl,u h• r in- r_-r'LfE371 1/1Mryn aYlYa4.irN rairsuo :wi avrvrmlafmrsrr t_�-rrr+r--aass�nrrsrv� . lEkVrTuG+zlrr•ERST2IM i U 11/71M rc y%r'F.Tv d• 1 rr>lr+rclimzryczixlry ' l�•:r EMMA IMilrcarsr.-1r. • 'r- rrr,r_tirsJJ GRAPHIC STALE ice vx JSJ 1>s'1. . rZ L?1 li ® MEx..h[1C14 uiia��FiS tInr= @.F1 JEIHRELYFinRbitami 0 ll�f-^ui a yi.a. 0rrr7YC.i•0iR m'li-lily* 1^]fi^y^(�l�ffil IY'�11'rf:R'LiigAi IUlIG 1.4 ..,.1 .IT• piNDM ItmMSLYAnnaLm r?!W6`e f'r[1 !n�.7g�lC+O Ix1•u f:l m. IMEI • liElFRPAIM REIREFIbil FBI rRl[�'rm'1fIrCri mBCSCRi471O3F1 HEFIWK=. tiiL111 ,Y.. •f 4'.r i, q-i [G31••.GLf.. '.9t}J 1.29I-'GGCYJ0 rssmsa.�ii q mSll"'m9357@+Jt sn 1.-Wrur.�rq;� e=xrM-1iEr® /311r1....A i mvP- elr ISPIP EUPAKkE'1 rllidla Y�fevp]ir,R.�.,l ® iIM n.3111711301ii31�T��i EELS P per •:./ i..3 Gnp bxi'.-L7 RRR`...77777❑ Nr� a rr44��LLL7777 IRRINEN EIPARAEI lil ; Mir:IIhl4Fa�Q,O N'6Qm9 lra1,7M- c® IA:11 IG a 1•a lIIl:hJiFiil4 lC13/f` 1,1171.03.-i InIEF,Y E 1 rrr1 Iran rn p.-i.LYi • & EEE TrnWrsi - r15TSRirRra m Cam'*__v rylf'S � �••. ii� RLIFTI PGQJIN• — ®r•,' .. yam]UZI ® Nit Iw:a„v n P...e CALDWELL TIMBER PARW S. LLC ISirron 'RATERFEQNT�cure-MUSE rEfill1 CATAWBA f0'•WlSI. CHOnCu ttuurr,, N.0 SEM WV A.VP .YAW PRCPA40p gl" LASE. NORMAN SURVEYING k MAPPING ILLC A�-ofsn l37.Axann;a Recd. S.Y. C 51e!esx::c• korl8 Ceeohne 7867.5 eoo� or e- urwxe ampp y 1!. (704) 878.-4A•7p Fox (]pe7 470-415! 6113ZIZT/Oi A-IDEPLUI I T) • J z [I) ce w J 0 CO r Li w U z a z W 4. Clearing to Support Stabilization Projects — Minimal clearing within the Project Boundaries is allowed to create corridors for equipment access for stabilization projects. Access corridors should be incorporated into permanent pier/dock access corridors (i.e., footpaths) where practical. Native vegetation removed to accommodate construction access for shoreline stabilization shall be replaced in accordance with the Vegetation Management Requirements with native vegetation of a similar species or type. 5. Water Willow Beds — Applicants are encouraged to avoid activities (including stabilization) that could have an adverse impact upon existing water willow beds. Bioengineering is a preferred shoreline stabilization technique and is encouraged, especially in eroded areas associated with water willow beds. Shoreline stabilization activities are limited to the eroded bank and any unavoidable impacts to existing water willow beds, as a result of stabilization installation, require replanting water willow in the impacted area(s). Rip -rap installed below the normal lake level elevation and associated with water willow beds must be limited to one Iayer deep to allow spaces between the stone for water willow recruitment. Removal of water willow for continued lake access may be allowed, but only for the specific and limited area necessary. Removal of water willow by means of chemical application can only be conducted in accordance with state and federal pesticide application regulations. 6. Rip -Rap Use with Bulkheads — A layer of rip -rap (Class B or larger) extending six feet lakeward from full pond must be placed along the entire base of all bulkheads (except for loosely stacked, dry -stacked boulder walls). The six foot requirement for steep slopes is measured vertically. For more gradual slopes where the vertical measurement would prove impractical, a horizontal measure may be used (Figure 5B-2). 7. Bioengineering Vegetation — The types of plantings used in bioengineering and landscape -planting projects should be native to North Carolina and South Carolina, and must be reviewed and approved by DE-LS prior to introduction. 8. Seawalls — Seawalls are not allowed in areas with an average eroded bank height of less than three feet. 9. Bioenzineerin — Proposals for stabilization where the eroded bank height is less than two ft may use approved bioengineering technique and enhanced rip -rap technique only (see Figure 5B-3 for example of acceptable enhanced rip -rap technique). 10. Length of Shoreline to be Stabilized — An individual permit from the SCDHEC for activities in South Carolina and the US Army Corps of Engineers for activities in North Carolina is required for stabilization that exceeds 500 linear ft of shoreline. Multiple applications for less than 500 ft of stabilization activities on a parcel exceeding 500 linear ft will not be accepted within a five year timeframe. October 3, 2016 C-56 Shoreline Management Guidelines Shoreline Management Plan Catawba-Wateree Project (FERC No_ 2332) Water Resources ENviRONrnENTAL ouAL'ry State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 0211.0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Level I E — — Shoreline 4Xit , 6c� 4 laid ,Sce ,`n io GC —17o cfeetv,tx rots -- d N-c4 t' ?,rora Plan View Lake (At Full Pond/ Normal Water Level) rl.o� "ice 4 3 6 4'4 { yvk' 1(70 b� 3-¢f x go- i — — — ani — 3 x 90 FORM: SSGP 02-2017 Page 1 of 3 DWR Pre -Filing Meeting Request Form ID#* Regional Office * Reviewer List* 20210794 Version* Asheville Regional Office - (828) 296-4500 Amy Annino Pre -Filing Meeting Request submitted 4/9/2021 Contact Name * Bart Shaw Contact Email Address* bart@shawtate.com Project Name * Waterfront Club Project Owner* Caldwell Timber Partners, LLC Project County* Caldwell Owner Address: Street Address 1031 S Caldwell Street Address Line 2 Suite 220 City State / Rovince / Region Charlotte North Carolina Fbstal / Zip Code Country 28203 United States Is this a transportation project?* r Yes ( No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - I— 401 Water Quality Certification - Reg ula r Express I— Individual Permit I— Modification l Shoreline Stabilization Does this project have an existing project ID#?* C Yes ( No Do you know the name of the staff member you would like to request a meeting with? Amy Annino Please give a brief project description below and include location information.* Large boulders will be placed along the shoreline to stabilize the shoreline and help minimize erosion. It should also reduce the area in which foot traffic enters and exits the lake to help maintain ground cover. Please give a couple of dates you are available for a meeting. 4/20/2021 4/21/2021 Please attach the documentation you would like to have the meeting about. shoreline lot 125.pdf pdf only 1.06MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/9/2021