Loading...
HomeMy WebLinkAboutNCC213367_ESC Approval Submitted_20210603ROY COOPER Governor MICHAEL S. REGAN 5 xmtary BRIAN WRENN Director NORTH CAROLINA Envi wunen rit Quattcy February 16, 2021 10 - W I of 0013 "11331411 Town of Mooresville Attention: Ryan Rase, Assistant Town Manager Post Office Box 878 Mooresville, North Carolina 28115 RE: Project Name: Wiggins Road Sewer Facilities Contract 81.0 -Pump Station Acres Approved: 3 Project ID: IREDE-2021-006 County: Iredell City: Mooresville Address: Wiggins Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Town of Mooresville Date Received by LQS: February 10, 2021 Plan Type: Revised This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources 44�" Q:!;$ Mooresville Regional office 1 610East Center Avenue, Suite 301 1 Mooresville, North Carolina 2$115 rw.w.�a oWw 704.663:1699 Letter of Approval Town of Mooresville February 16, 2021 Page 2 of 2 Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I 13A-61. I (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I 3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated, Sincerely, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO I Fact Sheet Willis Engineering Attention: Sydnee S. Potter, PE 10700 Sikes Place Charlotte, North Carolina 28277 Inspection Department ch tq iD CJQ p O cn r+ CA Cl . o CDIrD • � ar CD ° P) CD n CD�A CD ttCD Z a p �CL tTj CD CD C-D W c� qq O Er uq CD CD CL �t ), g� D � 3 N 5 e-gr y i� Fact Sheet on the NewNCGO1 Permit - �-DRE Q April 201{� v� The NC Construction General Permit (also known as "NCGOV) was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites.However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. OEMLRwmrkedxvithabnoadteamufstakeho|derstomakeaUoftheseupdates-|fyuuhavequestions, contact Annette Lucas at ur(9l9)7O7'3639. Organizational Updates The new permit: w Repeats state requirements for E&SC Plans and organizes *them with federal construction accmity/equinements; * |sclearly organized bytopic; and * Has less text and more tables. Technical Updates The new permit: * Requires that the E&S[ Plan meet SVVPPP requirements (p, Z); * Provides list ofitems that must be included inthe SVVPPP'such asthe construction sequence, plans, calculations, etc. (p. 2-4);^ w Has updated language onbypasses and upsets that |stailored toconstruction activities (p, lO); w Puts all timehamenfor inspections, record -keeping and reporting in "calendar days" for clarity and consistency(p. 11-I4);2 • Changes the inspection frequency (during business hours)toatleast once per 7ca|enoardays and after every storm >I.Oinch (previously O.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take , This list isbased onwabsiteguidance bythe DEMLRSediment Program, z The number ufcalendar days was selected to be as equivalent as possible with the previous permit, ' The intent is to provide predictability tothe inspection schedule. Acronyms toKnow COC: Certificate ofCoverage, proof ofcoverage under anN[G01permit DE&0LR: N[ Division of Energy, Mineral, and Land Resources [&SC: E/o31un&Sedimentation Control e'NO|: Notice ofIntent, application form for the N[GO1permit e'NOT:Notice ofTermination, form for closing out the NCBO1permit SVVPPP: StormwaterPollution Prevention Plan, required bythe N[GOl The N[GD1Process The new NCGO1 applies to permits approved onnrafter April 1, 2019. Permitteeswill nmlonger receive acopy ofthe NCGOlpermit inthe mail with their E&S[Plan approvals and beconsidered ascovered under the permit. Fede/a| rules require that DEvJLR receive an NO| on each construction project and issue each construction project its own [O[. Under the new N[GO1process, construction sites will continue to receive approval for E&S[Plans from either DEK4LRo/the delegated local E&lC program just like before. After receiving E8J[ Plan approval, permitteeswill officially obtain coverage under the NC6O1by completing ane-N0(available at , The e-NO|will only take about 3Ominutes tofill out and submit on'|ine. initially, there will benocharge associated with applying for anNCG01 permit but onoraround June 1,3Ol9,DEMURwill begin charging a$1O0 annual general permit fee asrequired per §l4]'21S.3D. DEK4LR|sworking oncreating asingle application form that will allow an applicant tosimultaneously apply for anE&8Cpermit and anNCGO1 [O[.That effort ispart ofalarger Permit Transformation project at DEK1LR.