Loading...
HomeMy WebLinkAbout960141_Compliance_20210603 (3)Sludge Survey Evaluation Form Today's Date 06032021 Facility # Owner: Lagoon ID 960141 Archer Farms 3 Sludge Survey Received: Sludge Survey Performed: 6/2/2021 12/12/2020 Sludge Depth (Row 0): (ft) Existing Treatment Depth (Row P): (ft) ,tart Date: 2.9 4.90 01 /01 /91 Facility age at time of survey:(yr) Average Sludge Accumulation (ft/yr): 30 0.10 Requested Extension: (yr) Requested Due Date 3 2024 Sludge Accumulation during extension peric Treatment Depth Available after Extension: Sludge level OK? 0.29 4.61 YES Ratio Estimates Based on Depth Ratio of Sludge layer to total trmt depth Ratio of Sludge depth OK? EXISTING EXEMPTION 0.37 0.41 NO Average Sludge layer thickness Depth of the lagoon from top of bank to loot Slope=Horizontal/vertical side slope Length at the top of inside bank (L) Width at the top inside slope ;W) Thickness of existing liquid treatment zone EXISTING EXEMPTION 2.9 3.19 10.1 3 375 175 4.61 10.1 3 375 175 4.90 Length at midpoint of sludge layer (Lm)=L-2 Width at midpoint of sludge layer (Wm)=W- Volume of sludge (Vs)=Lm*Wm*T Volume in gallons (Vsg)=Vs*7.481 Thickness of total treatment zone (Z)=T+Y Length at midpoint of total treatment zone (L Width at midpoint of total treatment zone (VV Volume of total treatment zone (Vz)=Lz*Wz' 323.10 123.10 115343.47 862884.49 7.80 337.80 137.80 363080.95 323.97 123.97 128132.71 958432.68 7.80 337.80 137.80 363080.95 Ratio(R) of sludge layer volume to total ti 0.318 0.353 Sludge Volume Ratio OK? Maximum extension until end of permit cycle Next survey to be done: (calendar yr) 12/31/2024 Notification letter mailed: 6/4/2021